Event Notification Report for March 18, 2010
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
03/17/2010 - 03/18/2010
EVENT NUMBERS
45774457754577646640
Other Nuclear Material
Event Number: 45774
Rep Org: TRIAD ENGINEERING
Licensee: CTL ENGINEERING, INC.
Region: 1
City: MORGANTOWN State: WV
County:
License #: 34-18533-02
Agreement: N
Docket:
NRC Notified By: ROGER SIMAR
HQ OPS Officer: DONALD NORWOOD
Licensee: CTL ENGINEERING, INC.
Region: 1
City: MORGANTOWN State: WV
County:
License #: 34-18533-02
Agreement: N
Docket:
NRC Notified By: ROGER SIMAR
HQ OPS Officer: DONALD NORWOOD
Notification Date: 03/18/2010
Notification Time: 17:24 [ET]
Event Date: 03/18/2010
Event Time: 15:00 [EDT]
Last Update Date: 03/19/2010
Notification Time: 17:24 [ET]
Event Date: 03/18/2010
Event Time: 15:00 [EDT]
Last Update Date: 03/19/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2201(a)(1)(i) - LOST/STOLEN LNM>1000X
10 CFR Section:
20.2201(a)(1)(i) - LOST/STOLEN LNM>1000X
Person (Organization):
ART BURRITT (R1DO)
JIM LUEHMAN (FSME)
ART BURRITT (R1DO)
JIM LUEHMAN (FSME)
FOUND TROXLER MOISTURE-DENSITY GAUGE
At about 1500 EDT, while traveling on US Rt. 19 South of Arnettsville, an employee of Triad Engineering [license number 45-18209-02] found a Troxler 3430 moisture-density gauge (S/N 24513) on the highway. The employee moved the gauge out of traffic and flagged down a state police officer. The police officer made some calls in an attempt to determine if anyone had reported the gauge lost. After negative results, the police officer left the gauge in the care of the Triad Engineering employee. The employee called his supervisor and was told to bring the gauge into the office where it could be adequately secured. After arriving at the office, calls were made to Troxler to determine to whom the gauge belonged. Troxler listed the gauge as belonging to CTL Engineering in Morgantown, West Virginia. Triad Engineering called CTL Engineering to tell them they had found their gauge. About 1710 EDT, an employee of CTL Engineering arrived at the Triad Engineering office and took possession of the gauge.
* * * UPDATE FROM TIM GOWARTY TO DONG PARK @ 1040 EDT ON 3/19/10 * * *
CTL Engineering, Inc. confirmed that a Troxler 3430 moisture-density gauge fell out of the back of their truck at around 1500 EDT, 3/18/2010, while on US Rt. 19. After an employee from CTL Engineering picked up the gauge from Triad Engineering, the gauge was transported to their facility. The gauge did not appear to be damaged, and the gauge is scheduled to be inspected. The driver of the truck will be required to take the four hour Troxler refresher course.
Notified R1DO (Burritt), FSME EO (McIntosh).
THIS MATERIAL EVENT CONTAINS A "LESS THAN CAT 3" LEVEL OF RADIOACTIVE MATERIAL
Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf
At about 1500 EDT, while traveling on US Rt. 19 South of Arnettsville, an employee of Triad Engineering [license number 45-18209-02] found a Troxler 3430 moisture-density gauge (S/N 24513) on the highway. The employee moved the gauge out of traffic and flagged down a state police officer. The police officer made some calls in an attempt to determine if anyone had reported the gauge lost. After negative results, the police officer left the gauge in the care of the Triad Engineering employee. The employee called his supervisor and was told to bring the gauge into the office where it could be adequately secured. After arriving at the office, calls were made to Troxler to determine to whom the gauge belonged. Troxler listed the gauge as belonging to CTL Engineering in Morgantown, West Virginia. Triad Engineering called CTL Engineering to tell them they had found their gauge. About 1710 EDT, an employee of CTL Engineering arrived at the Triad Engineering office and took possession of the gauge.
* * * UPDATE FROM TIM GOWARTY TO DONG PARK @ 1040 EDT ON 3/19/10 * * *
CTL Engineering, Inc. confirmed that a Troxler 3430 moisture-density gauge fell out of the back of their truck at around 1500 EDT, 3/18/2010, while on US Rt. 19. After an employee from CTL Engineering picked up the gauge from Triad Engineering, the gauge was transported to their facility. The gauge did not appear to be damaged, and the gauge is scheduled to be inspected. The driver of the truck will be required to take the four hour Troxler refresher course.
Notified R1DO (Burritt), FSME EO (McIntosh).
THIS MATERIAL EVENT CONTAINS A "LESS THAN CAT 3" LEVEL OF RADIOACTIVE MATERIAL
Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 45775
Facility: HATCH
Region: 2 State: GA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: PAUL UNDERWOOD
HQ OPS Officer: JOHN KNOKE
Region: 2 State: GA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: PAUL UNDERWOOD
HQ OPS Officer: JOHN KNOKE
Notification Date: 03/18/2010
Notification Time: 20:21 [ET]
Event Date: 03/18/2010
Event Time: 18:16 [EDT]
Last Update Date: 03/25/2010
Notification Time: 20:21 [ET]
Event Date: 03/18/2010
Event Time: 18:16 [EDT]
Last Update Date: 03/25/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
MARK FRANKE (R2DO)
MARK FRANKE (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Startup | 0 | Startup |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
LOSS OF TONE ALERT RADIOS
"At approximately 1816 EDT, loss of prompt notification system (tone alert radios) occurred. Security notified Jacksonville National Weather Service and Information Technology to investigate. Jacksonville National Weather Service determined a problem with their equipment and prompt notification system (tone alert radios) was returned to service at approximately 1845 eastern time. Security has notified state and local agencies of prompt notification system (tone alert radio) outage and return to service."
The licensee has notified the NRC Resident Inspector. Licensee also notified State and local agencies.
* * * RETRACTION FROM FRANK GORLEY TO PETE SNYDER AT 1535 ON 3/25/10 * * *
"On 3/18/10 at approximately 11:40 am we started receiving an 'off-air' alarm for the Plant Hatch NOAA Weather Radio. Initially we determined that a loss of the prompt notification system had occurred due to the alarm and consultation with Jacksonville National Weather Service, Ref. 10 CFR 50.72 (b)(3)(xiii).
"NOAA personnel subsequently provided information to Plant Hatch personnel at which time it was learned that even though 'off-air' alarms were received for the NOAA Weather Radio, the radio was never off the air. While NOAA personnel were troubleshooting the system the broadcast was switched over to a digital backup system that continued to have the capability to warn the public. There was a problem noted in the broadcast that was causing several seconds of silence in the broadcast signal. While on the digital backup, the notification capability was maintained. The broadcast had been returned to the primary system today. During the time these activities were underway, broadcast capability to the public was never lost.
"Based on this information, Plant Hatch is entering a Notification of Retraction for the 8 hr. report documented to the NRC Event Number 45775, as entered on 3/18/10."
The licensee will notify the NRC Resident Inspector. Notified R2DO (Franke).
"At approximately 1816 EDT, loss of prompt notification system (tone alert radios) occurred. Security notified Jacksonville National Weather Service and Information Technology to investigate. Jacksonville National Weather Service determined a problem with their equipment and prompt notification system (tone alert radios) was returned to service at approximately 1845 eastern time. Security has notified state and local agencies of prompt notification system (tone alert radio) outage and return to service."
The licensee has notified the NRC Resident Inspector. Licensee also notified State and local agencies.
* * * RETRACTION FROM FRANK GORLEY TO PETE SNYDER AT 1535 ON 3/25/10 * * *
"On 3/18/10 at approximately 11:40 am we started receiving an 'off-air' alarm for the Plant Hatch NOAA Weather Radio. Initially we determined that a loss of the prompt notification system had occurred due to the alarm and consultation with Jacksonville National Weather Service, Ref. 10 CFR 50.72 (b)(3)(xiii).
"NOAA personnel subsequently provided information to Plant Hatch personnel at which time it was learned that even though 'off-air' alarms were received for the NOAA Weather Radio, the radio was never off the air. While NOAA personnel were troubleshooting the system the broadcast was switched over to a digital backup system that continued to have the capability to warn the public. There was a problem noted in the broadcast that was causing several seconds of silence in the broadcast signal. While on the digital backup, the notification capability was maintained. The broadcast had been returned to the primary system today. During the time these activities were underway, broadcast capability to the public was never lost.
"Based on this information, Plant Hatch is entering a Notification of Retraction for the 8 hr. report documented to the NRC Event Number 45775, as entered on 3/18/10."
The licensee will notify the NRC Resident Inspector. Notified R2DO (Franke).
General Information or Other
Event Number: 45776
Rep Org: WESTINGHOUSE ELECTRIC COMPANY
Licensee: WESTINGHOUSE ELECTRIC COMPANY
Region: 1
City: PITTSBURG State: PA
County:
License #:
Agreement: Y
Docket:
NRC Notified By: JAMES A. GRESHAM
HQ OPS Officer: DONG HWA PARK
Licensee: WESTINGHOUSE ELECTRIC COMPANY
Region: 1
City: PITTSBURG State: PA
County:
License #:
Agreement: Y
Docket:
NRC Notified By: JAMES A. GRESHAM
HQ OPS Officer: DONG HWA PARK
Notification Date: 03/19/2010
Notification Time: 08:37 [ET]
Event Date: 03/18/2010
Event Time: 00:00 [EDT]
Last Update Date: 03/19/2010
Notification Time: 08:37 [ET]
Event Date: 03/18/2010
Event Time: 00:00 [EDT]
Last Update Date: 03/19/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
Person (Organization):
WAYNE WALKER (R4DO)
JOHN THORP (NRR)
BILL GOTT (IRD)
PART 21 GROUP (Emai)
WAYNE WALKER (R4DO)
JOHN THORP (NRR)
BILL GOTT (IRD)
PART 21 GROUP (Emai)
DEFECT CONCERNING FAILURE OF RELAY TO RELEASE WHEN DE-ENERGIZED
The following was received via facsimile:
The defect prevents the relay contacts from changing state when required during postulated events. This failure could preclude components from going to their desired accident state upon receipt of an engineered safety features actuation signal. There have been no reports to date of relay contacts failing to properly change state when the relay goes from a deenergized to an energized state. Westinghouse shipped Palo Verde a total of 120 Cutler Hammer Type ARD 660UR DC Relays. Westinghouse Repair, Replacement and Automation Services (RRAS) has been working with Palo Verde and Eaton-Cutler Hammer to identify and correct the cause of these relay failures.
POC: J. A. Gresham, Secretary
Safety Review Committee
Westinghouse Electric Company LLC
Nuclear Services
P.O. Box 355
Pittsburgh, Pennsylvania 15230-0355
(412) 374-4643
The following was received via facsimile:
The defect prevents the relay contacts from changing state when required during postulated events. This failure could preclude components from going to their desired accident state upon receipt of an engineered safety features actuation signal. There have been no reports to date of relay contacts failing to properly change state when the relay goes from a deenergized to an energized state. Westinghouse shipped Palo Verde a total of 120 Cutler Hammer Type ARD 660UR DC Relays. Westinghouse Repair, Replacement and Automation Services (RRAS) has been working with Palo Verde and Eaton-Cutler Hammer to identify and correct the cause of these relay failures.
POC: J. A. Gresham, Secretary
Safety Review Committee
Westinghouse Electric Company LLC
Nuclear Services
P.O. Box 355
Pittsburgh, Pennsylvania 15230-0355
(412) 374-4643
Part 21
Event Number: 46640
Rep Org: ASCO VALVE
Licensee: ASCO VALVE
Region: 1
City: AIKEN State: SC
County:
License #:
Agreement: Y
Docket:
NRC Notified By: ROBERT ARNONE
HQ OPS Officer: DONALD NORWOOD
Licensee: ASCO VALVE
Region: 1
City: AIKEN State: SC
County:
License #:
Agreement: Y
Docket:
NRC Notified By: ROBERT ARNONE
HQ OPS Officer: DONALD NORWOOD
Notification Date: 02/25/2011
Notification Time: 08:59 [ET]
Event Date: 03/18/2010
Event Time: 00:00 [EST]
Last Update Date: 02/25/2011
Notification Time: 08:59 [ET]
Event Date: 03/18/2010
Event Time: 00:00 [EST]
Last Update Date: 02/25/2011
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
Person (Organization):
WILLIAM COOK (R1DO)
MARK FRANKE (R2DO)
DAVID HILLS (R3DO)
VIVIAN CAMPBELL (R4DO)
Part 21 Gp via Email
WILLIAM COOK (R1DO)
MARK FRANKE (R2DO)
DAVID HILLS (R3DO)
VIVIAN CAMPBELL (R4DO)
Part 21 Gp via Email
FAILURE OF ACTUATORS DUE TO UNDERSIZED OUTPUT SHAFTS
The following is a synopsis of information received via facsimile:
On March 18, 2010, Samkwange returned an NH90 Hydramotor to ASCO because the motor was not operating when power was applied. ASCO tested the actuator and found all recorded electrical values to be within specifications, however the output shaft did not have any movement. With the mounting plate removed and the pump activated, it was observed that the shaft was not turning with the rotor.
On November 24, 2010, Diablo Canyon Power Plant returned an NH90 Hydramotor to ASCO because the unit was not attaining its full stroke when a signal was applied. The output shaft would start to stroke, but intermittently stopped and the pumping sound ceased. However, normal operating current was noted which indicated that the motor was still running and that a locked rotor condition was not occurring. Further testing revealed that the rotor core was turning on the shaft.
In both of the above cases, it was determined that the output shaft was undersized.
Corrective Action: All rotor-shaft assemblies in ASCO's inventory as of April 22, 2010 were returned to the supplier to confirm that they met specifications. In addition, a static torque test has been implemented for all rotor-shaft assemblies of all pump assemblies manufactured by ASCO since December 10, 2010. Also, all rotor-shaft assemblies that were in ASCO's inventory as of December 10, 2010 successfully completed the static torque test. Finally a static torque test will be performed on all pump kits in AREVA's inventory before they are supplied to customers.
The following is a synopsis of information received via facsimile:
On March 18, 2010, Samkwange returned an NH90 Hydramotor to ASCO because the motor was not operating when power was applied. ASCO tested the actuator and found all recorded electrical values to be within specifications, however the output shaft did not have any movement. With the mounting plate removed and the pump activated, it was observed that the shaft was not turning with the rotor.
On November 24, 2010, Diablo Canyon Power Plant returned an NH90 Hydramotor to ASCO because the unit was not attaining its full stroke when a signal was applied. The output shaft would start to stroke, but intermittently stopped and the pumping sound ceased. However, normal operating current was noted which indicated that the motor was still running and that a locked rotor condition was not occurring. Further testing revealed that the rotor core was turning on the shaft.
In both of the above cases, it was determined that the output shaft was undersized.
Corrective Action: All rotor-shaft assemblies in ASCO's inventory as of April 22, 2010 were returned to the supplier to confirm that they met specifications. In addition, a static torque test has been implemented for all rotor-shaft assemblies of all pump assemblies manufactured by ASCO since December 10, 2010. Also, all rotor-shaft assemblies that were in ASCO's inventory as of December 10, 2010 successfully completed the static torque test. Finally a static torque test will be performed on all pump kits in AREVA's inventory before they are supplied to customers.