Event Notification Report for February 15, 2010
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
02/14/2010 - 02/15/2010
Power Reactor
Event Number: 45698
Facility: COOK
Region: 3 State: MI
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: BRADDOCK LEWIS
HQ OPS Officer: JOE O'HARA
Region: 3 State: MI
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: BRADDOCK LEWIS
HQ OPS Officer: JOE O'HARA
Notification Date: 02/15/2010
Notification Time: 08:58 [ET]
Event Date: 02/15/2010
Event Time: 09:30 [EST]
Last Update Date: 02/15/2010
Notification Time: 08:58 [ET]
Event Date: 02/15/2010
Event Time: 09:30 [EST]
Last Update Date: 02/15/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
HIRONORI PETERSON (R3DO)
HIRONORI PETERSON (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNAVAILABILITY OF EMERGENCY RESPONSE DATA SYSTEM (ERDS) DUE TO PLANT PROCESS COMPUTER (PPC) SCHEDULED MAINTENANCE
"At 0930 on Monday, February 15, 2010, the Cook Nuclear Plant (CNP) Unit 2 Plant Process Computer will be removed from service for scheduled maintenance for data backup and preventative maintenance which will take ERDS out of service to the NRC Operations Center. The scheduled maintenance will affect the Safety Parameter Display System (SPDS) and the Real Time Data Repository (RDR), PPC data to Emergency Response Facilities at CNP.
"The scheduled maintenance is expected to take up to 6 hours to complete.
"Compensatory measures exist within the CNP Emergency Response procedure to provide plant data via the Emergency Notification System to the NRC Operations Center until the ERDS can be returned to service.
"The licensee notified the NRC Resident Inspector 2/15/2010 at 8:45 a.m.
"This notification is being made in accordance with NUREG 1022 Revision 2 for CFR 50.72 (b)(3)(xiii) due any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system)."
The unit is expected to be maintained at 100% during the maintenance evolution. PPC trending and indication and rod position monitor will be out of service (OOS) while the PPC is OOS.
* * * UPDATE FROM BRAD LEWIS TO DONALD NORWOOD AT 1205 EST ON 2/15/2010 * * *
The DC Cook U-2 Plant Process Computer was returned to service and a fully operable and available status at 1144 EST on 2/15/2010. The licensee notified the NRC Resident Inspector.
Notified R3DO (Peterson) via E-mail.
"At 0930 on Monday, February 15, 2010, the Cook Nuclear Plant (CNP) Unit 2 Plant Process Computer will be removed from service for scheduled maintenance for data backup and preventative maintenance which will take ERDS out of service to the NRC Operations Center. The scheduled maintenance will affect the Safety Parameter Display System (SPDS) and the Real Time Data Repository (RDR), PPC data to Emergency Response Facilities at CNP.
"The scheduled maintenance is expected to take up to 6 hours to complete.
"Compensatory measures exist within the CNP Emergency Response procedure to provide plant data via the Emergency Notification System to the NRC Operations Center until the ERDS can be returned to service.
"The licensee notified the NRC Resident Inspector 2/15/2010 at 8:45 a.m.
"This notification is being made in accordance with NUREG 1022 Revision 2 for CFR 50.72 (b)(3)(xiii) due any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system)."
The unit is expected to be maintained at 100% during the maintenance evolution. PPC trending and indication and rod position monitor will be out of service (OOS) while the PPC is OOS.
* * * UPDATE FROM BRAD LEWIS TO DONALD NORWOOD AT 1205 EST ON 2/15/2010 * * *
The DC Cook U-2 Plant Process Computer was returned to service and a fully operable and available status at 1144 EST on 2/15/2010. The licensee notified the NRC Resident Inspector.
Notified R3DO (Peterson) via E-mail.
Power Reactor
Event Number: 45699
Facility: PEACH BOTTOM
Region: 1 State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: JOHN GOODBRED, JR.
HQ OPS Officer: DONALD NORWOOD
Region: 1 State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: JOHN GOODBRED, JR.
HQ OPS Officer: DONALD NORWOOD
Notification Date: 02/15/2010
Notification Time: 15:28 [ET]
Event Date: 02/15/2010
Event Time: 12:05 [EST]
Last Update Date: 02/15/2010
Notification Time: 15:28 [ET]
Event Date: 02/15/2010
Event Time: 12:05 [EST]
Last Update Date: 02/15/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
RAY POWELL (R1DO)
RAY POWELL (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
FITNESS FOR DUTY EVENT - POSSESSION OF ALCOHOL INSIDE THE PROTECTED AREA
A non-licensed, non-supervisory employee was found in possession of alcohol inside the protected area. For-cause fitness-for-duty testing was conducted with negative results. The individual's unescorted access has been prohibited pending further investigation. Contact the Headquarters Operations Officer for additional details.
A non-licensed, non-supervisory employee was found in possession of alcohol inside the protected area. For-cause fitness-for-duty testing was conducted with negative results. The individual's unescorted access has been prohibited pending further investigation. Contact the Headquarters Operations Officer for additional details.
Power Reactor
Event Number: 45700
Facility: DAVIS BESSE
Region: 3 State: OH
Unit: [1] [] []
RX Type: [1] B&W-R-LP
NRC Notified By: MARK HOFFMAN
HQ OPS Officer: DONALD NORWOOD
Region: 3 State: OH
Unit: [1] [] []
RX Type: [1] B&W-R-LP
NRC Notified By: MARK HOFFMAN
HQ OPS Officer: DONALD NORWOOD
Notification Date: 02/15/2010
Notification Time: 16:42 [ET]
Event Date: 02/15/2010
Event Time: 09:05 [EST]
Last Update Date: 02/15/2010
Notification Time: 16:42 [ET]
Event Date: 02/15/2010
Event Time: 09:05 [EST]
Last Update Date: 02/15/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
HIRONORI PETERSON (R3DO)
HIRONORI PETERSON (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
FITNESS FOR DUTY EVENT - CONFIRMED POSITIVE FOR CONTROLLED SUBSTANCE USE
A non-licensed, contract supervisor had a confirmed positive for a controlled substance during a random fitness-for-duty test. The employee's access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details.
A non-licensed, contract supervisor had a confirmed positive for a controlled substance during a random fitness-for-duty test. The employee's access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details.