Skip to main content

Event Notification Report for January 11, 2010

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
01/10/2010 - 01/11/2010

EVENT NUMBERS
45621456234562445619

General Information or Other
Event Number: 45621
Rep Org: MA RADIATION CONTROL PROGRAM
Licensee: QSA GLOBAL
Region: 1
City: BURLINGTON   State: MA
County:
License #: 12-8361
Agreement: Y
Docket: 99-0014
NRC Notified By: JOHN SUMARES
HQ OPS Officer: HOWIE CROUCH
Notification Date: 01/11/2010
Notification Time: 15:00 [ET]
Event Date: 01/11/2010
Event Time: 00:00 [EST]
Last Update Date: 01/11/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
ANTHONY DIMITRIADIS (R1DO)
ANGELA MCINTOSH (FSME)
Event Text
AGREEMENT STATE REPORT - QSA GLOBAL REPORT OF DEFECT

"On January 8, 2010, at 1552 hrs. EST, QSA Global, Inc. reported a product defect to the Massachusetts Radiation Control Program in accordance with 105 CMR 120.142(B)(2)(a). The affected equipment that was identified was the QSA Model 87703 source assembly for a QSA Global radiography camera. A customer had received a Model 87703 source assembly and reported problems with the assembly connection on October 21, 2009. The unit was returned to their Burlington office and QSA Global, Inc. performed an evaluation of the extent of the defect. The Model 55000-3 female connector sleeve was identified as the source of the problem.

"The defect causes the male connector to not be fully seated in the sleeve of the connector and it was, therefore, not locking in. This could give the user the false impression that the source is connected to the drive cable when there is only a partial connection. The operations manual requires that the user visually check the connection prior to use. If the user does not do a full visual inspection of the connection, the source assembly may not be secure and could dislodge inside guide tube.

"The manufacturer conducted a 100% search of a lot of 1,567 pieces in stock and found 5 to be defective. The manufacturer is sending out notice dated January 11, 2010 to all of their radiography customers describing this disconnect issue. There are 236 sources in the field with 29 different licensees that have not sent their units back to QSA Global in Burlington, MA at this time. They will continue to monitor this problem as assemblies are returned."


Power Reactor
Event Number: 45623
Facility: NORTH ANNA
Region: 2     State: VA
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: PAGE KEMP
HQ OPS Officer: HOWIE CROUCH
Notification Date: 01/11/2010
Notification Time: 16:53 [ET]
Event Date: 01/11/2010
Event Time: 15:10 [EST]
Last Update Date: 01/11/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
DEBORAH SEYMOUR (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
OFFSITE NOTIFICATION DUE TO WATER SEEPAGE ON AN ONSITE STRUCTURE

"A verbal report was made to the Federal Energy Regulatory Commission (FERC) Engineer on January 11, 2010 at 1510 hours pursuant to 18CFR12.10(a) for a condition affecting the safety of a project or works. A new wet area has been identified on the slope of Dike 6, approximately 25 feet from the top of the structure. Dike 6 was designed and created during original plant construction to support electrical towers and provide isolation between Lake Anna and the proposed Unit 3 & 4 intake structures. The Unit 3 & 4 intake area is currently being used as a settling pond. The settling pond is used to process storm water and other secondary water before the liquid is discharged from the station.

"This minor seepage is located about half way down the slope to the settling pond. Water samples were obtained from the wet area and it was determined that the seepage was not ground water. The sample composition was similar to the water in Lake Anna. Currently, there is no threat to the public or North Anna Power Station. Engineering is investigating this issue and a corrective action plan will be developed to correct the minor seepage.

"This issue is being reported pursuant to 10CFR50.72(b)(2)(xi)."

The licensee has notified the NRC Resident Inspector and the local government.


Power Reactor
Event Number: 45624
Facility: INDIAN POINT
Region: 1     State: NY
Unit: [2] [] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: JOHN DIGNAM
HQ OPS Officer: JOE O'HARA
Notification Date: 01/11/2010
Notification Time: 18:31 [ET]
Event Date: 01/11/2010
Event Time: 15:59 [EST]
Last Update Date: 01/11/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
ANTHONY DIMITRIADIS (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 A/R Y 100 Power Operation 0 Hot Standby
Event Text
AUTOMATIC TRIP DUE TO MAIN GENERATOR ELECTRICAL TRIP

"At 1559 on January 11, 2010, Indian Point Unit 2 tripped from 100% power due to a main generator electrical trip. The investigation into the generator trip is ongoing. All systems responded as expected. The auxiliary feedwater system responded as expected and is maintaining steam generator water levels. Decay heat removal is via the steam generators to the main condenser. Offsite power and plant electrical lineups are normal. No primary or secondary side relief valves lifted. The reactor plant is in mode 3 and stable.

"Indian Point Unit 3 was not affected and remains at 100% power."

The licensee notified the NRC Resident Inspector and the N.Y. State Public Service Commission. The licensee intends to notify the Mayor's Office and issue a press release.


Power Reactor
Event Number: 45619
Facility: TURKEY POINT
Region: 2     State: FL
Unit: [] [4] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: JIM SPEICHER
HQ OPS Officer: HOWIE CROUCH
Notification Date: 01/11/2010
Notification Time: 12:54 [ET]
Event Date: 01/11/2010
Event Time: 10:55 [EST]
Last Update Date: 01/11/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
DEBORAH SEYMOUR (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
4 M/R Y 30 Power Operation 0 Hot Standby
Event Text
MANUAL REACTOR TRIP INITIATED DUE TO HIGH STEAM GENERATOR LEVEL

"At 1055 on 1/11/2010, Turkey Point Unit 4 was manually tripped on high steam generator level. Steam generator level was high due to plant response to a turbine runback. The runback was manually initiated by stopping the 4A Steam Generator Feed Pump from the Control Room due to mechanical seal failure.

"At the time of the trip, reactor power was 30%. Auxiliary Feedwater was not required since Steam Generator levels were maintained above the low level actuation setpoint.

"Unit 4 has been stabilized in Mode 3 on normal off-site power. No significant equipment problems were encountered.

"This event is reportable per 10 CFR 50.72(b)(2)(iv)(B) - actuation of the Reactor Protection System with the reactor critical."

All rods inserted during the trip. There were no relief or safety valves that lifted during the transient. Decay heat is being removed via steam dumps to atmosphere. There is no known primary to secondary leakage. Unit 4 is in a normal shutdown electrical lineup. Unit 3 was not affected by the transient.

The licensee has notified the NRC Resident Inspector.