Event Notification Report for November 29, 2009

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
11/28/2009 - 11/29/2009

EVENT NUMBERS
45528

Power Reactor
Event Number: 45528
Facility: SURRY
Region: 2     State: VA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: GEOFFREY HILL
HQ OPS Officer: PETE SNYDER
Notification Date: 11/29/2009
Notification Time: 13:31 [ET]
Event Date: 11/29/2009
Event Time: 10:45 [EST]
Last Update Date: 11/29/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
MARVIN SYKES (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 0 Startup 0 Hot Standby
Event Text
TRIP FROM INTERMEDIATE RANGE DUE TO ROD GROUP DEMAND COUNTER DISCREPANCY

"During startup physics testing, the reactor operator identified a discrepancy between Group 1 & Group 2 Step Demand Counters for control bank 'B'. Research identified the issue to be associated with failure of a card in the rod control power cabinet. Failure of the card impacts group step counters for control bank 'B', control bank 'D' and shutdown bank 'B.'

"Inoperability of more than one group step counter per bank placed Unit 2 in a 6-hour clock to hot shutdown as of 0808 hrs 29 November 2009. Consequently, at 1045 hrs, the decision was made to trip Unit 2 reactor. The decision was based on time required to make repairs, complete post maintenance testing requirements, and maintaining proper control of reactivity.

"All systems functioned as required on the trip and initiation of any auxiliary or emergency systems was not required. Current heat removal is via normal plant alignment following refueling outage activities: steam generator blowdown, main feedwater, and steam generator PORV."

All control rods fully inserted on the manual trip.

The licensee notified the NRC Resident Inspector.