Skip to main content

Event Notification Report for November 03, 2009

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
11/02/2009 - 11/03/2009

EVENT NUMBERS
45480454754547645561

General Information or Other
Event Number: 45480
Rep Org: NEW YORK STATE DEPT. OF HEALTH
Licensee:
Region: 1
City:   State: NY
County:
License #:
Agreement: Y
Docket:
NRC Notified By: ROBERT DANSEREAU
HQ OPS Officer: ERIC SIMPSON
Notification Date: 11/06/2009
Notification Time: 15:03 [ET]
Event Date: 11/03/2009
Event Time: 00:00 [EST]
Last Update Date: 11/06/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
RICHARD BARKLEY (R1DO)
ANDREA KOCK (FSME)
Event Text
AGREEMENT STATE REPORT INVOLVING LEAKING IRRADIATOR SOURCE

New York does not publish the name, address or license number of its licensees in incident reporting to the NRC.

The following information was received via e-mail:

"Event description: Best Theratronics was performing a security upgrade (hardening) on an AECL Gamma Cell 40 irradiator, containing AECL Model Number C-161 cesium-137 sources, and discovered radioactive contamination indicating a 'leaking' source. Coincidently, [Department of Health representatives] arrived at the licensee's facility for a planned site visit at noon on 11/03/09, and were able to assess the situation with the vendor and Radiation Safety Officer (RSO).

"The engineers noticed that one of the pneumatic source drive mechanisms moved noticeably slower than the other. They removed the pneumatic drive assemblies and manually moved the source drive rods. They noted excessive resistance to movement and noticed corrosion (rust) on the source rod. They wiped the rusty material and measured the wipe with a thin-window GM detector, which indicated radioactive contamination. Further sample analysis confirmed removable cesium 137 (isotopic analysis) in excess of the leak test limit. The contamination is limited to the areas of the source drive components only. Radiological surveys were performed on personnel, tools, the room, etc. with negative findings. In consultation with the service engineers, the RSO, and [Department of Health representatives], the decision was made to abandon the hardening procedure. The unit was reassembled and taken out of service. DOH will work with the licensee to determine what options, if any, exist for disposal of the unit. DOH will also follow-up with Best Theratronics in regard to their procedures for PM (i.e., is leak testing performed in areas such as the drive mechanism during routine PM service or during hardening). Also, we will inquire about actions such as a notice to owners and/or assessment of other licensee's units, etc.

"Contamination on both source rods may indicate a generic source integrity issue."


Power Reactor
Event Number: 45475
Facility: DRESDEN
Region: 3     State: IL
Unit: [] [2] []
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: CHRIS KENT
HQ OPS Officer: ERIC SIMPSON
Notification Date: 11/03/2009
Notification Time: 14:23 [ET]
Event Date: 11/03/2009
Event Time: 06:09 [CST]
Last Update Date: 11/03/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
Person (Organization):
RICHARD SKOKOWSKI (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Refueling 0 Refueling
Event Text
DEGRADED CONDITION DUE TO WELD ISSUE

"On 11/3/09 a walkdown of the Unit 2 Drywell identified a leak on a 3/4" ASME Code Class 1 pipe weld near the 2-0202-5B valve, 2B Recirc Pump Discharge valve. The weld is at an elbow in the pipe leading to the 2-220-35B valve. Unit 2 is currently in Mode 5. The weld will be repaired prior to unit startup."

No safety function was lost due to this weld issue. The estimated restart date is 11/26/2009.

The licensee has notified NRC Resident Inspector.


Power Reactor
Event Number: 45476
Facility: WATERFORD
Region: 4     State: LA
Unit: [3] [] []
RX Type: [3] CE
NRC Notified By: JOHN JARRELL
HQ OPS Officer: VINCE KLCO
Notification Date: 11/03/2009
Notification Time: 23:32 [ET]
Event Date: 11/03/2009
Event Time: 19:03 [CST]
Last Update Date: 11/03/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
MICHAEL HAY (R4DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Refueling 0 Refueling
Event Text
FITNESS FOR DUTY - EMPLOYEE TESTED POSITIVE FOR ALCOHOL.

An employee had a confirmed positive for alcohol during a random fitness-for-duty test. The employee's unescorted access to the plant has been suspended. Contact the Headquarters Operations Officer for additional details.

The licensee has notified the NRC Resident Inspector.


Power Reactor
Event Number: 45561
Facility: DRESDEN
Region: 3     State: IL
Unit: [] [2] []
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: MARK HANNEMAN
HQ OPS Officer: HOWIE CROUCH
Notification Date: 12/10/2009
Notification Time: 21:29 [ET]
Event Date: 11/03/2009
Event Time: 00:00 [CST]
Last Update Date: 12/10/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
Person (Organization):
MONTE PHILLIPS (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
INSTRUMENT LINE DETERMINED TO HAVE INADEQUATE STRUCTURAL SUPPORT

"At 1700 on 12/10/09, an operability evaluation determined that an instrument line within the primary containment did not have adequate structural support during the previous operating cycle. The evaluation determined that the instrument line would have failed during a Safe Shutdown Earthquake (SSE). This would have resulted in reactor coolant leakage within the primary containment that could not be isolated.

"The condition was identified and repaired during the recent refueling outage and full qualification and operability was restored prior to return to service."

The condition was discovered on November 3, 2009 during the Unit 2 refueling outage. The operability determination was completed on December 10, 2009. It is unknown at this time if the condition exists in Unit 3 due to inaccessibility of the drywell during power operations.