Event Notification Report for October 07, 2009
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/06/2009 - 10/07/2009
EVENT NUMBERS
45420454154541646034
Power Reactor
Event Number: 45420
Facility: MONTICELLO
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: RON CLEVELAND
HQ OPS Officer: CHARLES TEAL
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: RON CLEVELAND
HQ OPS Officer: CHARLES TEAL
Notification Date: 10/08/2009
Notification Time: 13:39 [ET]
Event Date: 10/07/2009
Event Time: 16:41 [CDT]
Last Update Date: 10/08/2009
Notification Time: 13:39 [ET]
Event Date: 10/07/2009
Event Time: 16:41 [CDT]
Last Update Date: 10/08/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
ANN MARIE STONE (R3DO)
ANN MARIE STONE (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
FITNESS FOR DUTY - REPORT OF FAILURE OF RANDOM DRUG TEST NON-LICENSED CONTRACTOR
A non-licensed contractor had confirmed positive for illegal drugs a random fitness for duty test. The contractors access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details.
A non-licensed contractor had confirmed positive for illegal drugs a random fitness for duty test. The contractors access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details.
Power Reactor
Event Number: 45415
Facility: SAINT LUCIE
Region: 2 State: FL
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: TIMOTHY KUDO
HQ OPS Officer: JOHN KNOKE
Region: 2 State: FL
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: TIMOTHY KUDO
HQ OPS Officer: JOHN KNOKE
Notification Date: 10/07/2009
Notification Time: 04:36 [ET]
Event Date: 10/07/2009
Event Time: 03:20 [EDT]
Last Update Date: 10/07/2009
Notification Time: 04:36 [ET]
Event Date: 10/07/2009
Event Time: 03:20 [EDT]
Last Update Date: 10/07/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
MIKE ERNSTES (R2DO)
MIKE ERNSTES (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
OFFSITE NOTIFICATION TO THE STATE OF FLORIDA AND THE NATIONAL RESPONSE CENTER
"This notification is being made pursuant to 10 CFR 50.72(b)(2)(xi) due to notification of other government agencies at 0320 EDT on 10/7/09.
"Florida Power and Light Company (FPL) has identified a Sodium Hypochlorite spill within the protected area at Plant Saint Lucie. The spill has been terminated and it is estimated that up to 240 lbs of Sodium Hypochlorite was spilled past the secondary containment of the hypochlorite tank. The precise volume of the spill is indeterminate at this time.
"This event poses no health or safety consequences to either on site personnel or the general public. Notification to the State of Florida Emergency Response Commission and the National Response Center was made in accordance with the Plant Saint Lucie hazardous material spill response procedure."
The licensee has notified the NRC Resident Inspector.
"This notification is being made pursuant to 10 CFR 50.72(b)(2)(xi) due to notification of other government agencies at 0320 EDT on 10/7/09.
"Florida Power and Light Company (FPL) has identified a Sodium Hypochlorite spill within the protected area at Plant Saint Lucie. The spill has been terminated and it is estimated that up to 240 lbs of Sodium Hypochlorite was spilled past the secondary containment of the hypochlorite tank. The precise volume of the spill is indeterminate at this time.
"This event poses no health or safety consequences to either on site personnel or the general public. Notification to the State of Florida Emergency Response Commission and the National Response Center was made in accordance with the Plant Saint Lucie hazardous material spill response procedure."
The licensee has notified the NRC Resident Inspector.
Power Reactor
Event Number: 45416
Facility: CRYSTAL RIVER
Region: 2 State: FL
Unit: [3] [] []
RX Type: [3] B&W-L-LP
NRC Notified By: WILLIAM KREHELY
HQ OPS Officer: PETE SNYDER
Region: 2 State: FL
Unit: [3] [] []
RX Type: [3] B&W-L-LP
NRC Notified By: WILLIAM KREHELY
HQ OPS Officer: PETE SNYDER
Notification Date: 10/07/2009
Notification Time: 19:33 [ET]
Event Date: 10/07/2009
Event Time: 19:30 [EDT]
Last Update Date: 10/07/2009
Notification Time: 19:33 [ET]
Event Date: 10/07/2009
Event Time: 19:30 [EDT]
Last Update Date: 10/07/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
ROBERT HAAG (R2DO)
ROBERT HAAG (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | N | 0 | Refueling | 0 | Refueling |
DISCOVERY OF A CONTAINMENT SEPARATION
"Crystal River Unit 3 is currently shutdown for a planned refueling and steam generator replacement outage. During containment building concrete removal activities to create a construction opening to support steam generator replacement, a separation in the concrete was discovered in the vicinity of the construction opening near the periphery of the containment. The Crystal River Unit 3 containment is a steel lined, post tensioned concrete structure nominally 42 inches thick. Post tensioning is achieved utilizing an outer array of horizontal tendons immediately adjacent to an inner array of vertical tendons. The separation is generally in the plane of the horizontal tendons. Inside the separation is 30 inches of concrete and the steel liner plate. This condition has been evaluated relative to current plant conditions and found to represent no degradation in safety. Crystal River Unit 3 personnel in conjunction with industry experts are currently performing a detailed analysis of this separation to determine the cause, extent of condition, the impact on the containment building function and any required repairs prior to plant restart. Operating experience reports are being prepared to share our information with the industry. The station will provide updates as we gain more information concerning this issue."
The licensee notified the NRC Resident Inspector.
"Crystal River Unit 3 is currently shutdown for a planned refueling and steam generator replacement outage. During containment building concrete removal activities to create a construction opening to support steam generator replacement, a separation in the concrete was discovered in the vicinity of the construction opening near the periphery of the containment. The Crystal River Unit 3 containment is a steel lined, post tensioned concrete structure nominally 42 inches thick. Post tensioning is achieved utilizing an outer array of horizontal tendons immediately adjacent to an inner array of vertical tendons. The separation is generally in the plane of the horizontal tendons. Inside the separation is 30 inches of concrete and the steel liner plate. This condition has been evaluated relative to current plant conditions and found to represent no degradation in safety. Crystal River Unit 3 personnel in conjunction with industry experts are currently performing a detailed analysis of this separation to determine the cause, extent of condition, the impact on the containment building function and any required repairs prior to plant restart. Operating experience reports are being prepared to share our information with the industry. The station will provide updates as we gain more information concerning this issue."
The licensee notified the NRC Resident Inspector.
Power Reactor
Event Number: 46034
Facility: MILLSTONE
Region: 1 State: CT
Unit: [] [2] []
RX Type: [1] GE-3,[2] CE,[3] W-4-LP
NRC Notified By: NORMAN KUZEL
HQ OPS Officer: JOE O'HARA
Region: 1 State: CT
Unit: [] [2] []
RX Type: [1] GE-3,[2] CE,[3] W-4-LP
NRC Notified By: NORMAN KUZEL
HQ OPS Officer: JOE O'HARA
Notification Date: 06/22/2010
Notification Time: 11:32 [ET]
Event Date: 10/07/2009
Event Time: 10:30 [EDT]
Last Update Date: 06/22/2010
Notification Time: 11:32 [ET]
Event Date: 10/07/2009
Event Time: 10:30 [EDT]
Last Update Date: 06/22/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
JAMES DWYER (R1DO)
JAMES DWYER (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Hot Shutdown | 0 | Cold Shutdown |
HISTORICAL CONDITION PREVIOUSLY REPORTED IN LER 2009-003 SHOULD ALSO HAVE BEEN REPORTED IN ACCORDANCE WITH 10 CFR 50.72 (b)(3)(v)(D)
"On October 7, 2009, two independent diesel generators were rendered inoperable. This was reported in LER 2009-003 as a condition prohibited by plant technical specifications and a common cause that resulted in two independent trains becoming inoperable.
"Upon further review, the condition which existed at Millstone Power Station Unit 2 and reported to the NRC in LER 2009-003, should also have been reported per the requirements of 10CFR50.72(b)(3)(v)(D). A supplement to LER 2009-003 will be submitted.
"The NRC Resident Inspector has been notified."
"On October 7, 2009, two independent diesel generators were rendered inoperable. This was reported in LER 2009-003 as a condition prohibited by plant technical specifications and a common cause that resulted in two independent trains becoming inoperable.
"Upon further review, the condition which existed at Millstone Power Station Unit 2 and reported to the NRC in LER 2009-003, should also have been reported per the requirements of 10CFR50.72(b)(3)(v)(D). A supplement to LER 2009-003 will be submitted.
"The NRC Resident Inspector has been notified."