Event Notification Report for September 09, 2009

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
09/08/2009 - 09/09/2009

EVENT NUMBERS
453364533746594

Power Reactor
Event Number: 45336
Facility: SUSQUEHANNA
Region: 1     State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: DAVID BORGER
HQ OPS Officer: PETE SNYDER
Notification Date: 09/09/2009
Notification Time: 16:40 [ET]
Event Date: 09/09/2009
Event Time: 09:30 [EDT]
Last Update Date: 09/09/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
RAY POWELL (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 94 Power Operation 94 Power Operation
2 N Y 94 Power Operation 94 Power Operation
Event Text
EMERGENCY SIRENS OUT OF SERVICE

"On Wednesday, Sept. 9 at 9:30 am EDT, all 76 emergency sirens that serve the communities within a 10-mile radius of the PPL Susquehanna nuclear power plant failed during their bi-weekly silent test.

"The failed siren test was initiated by Columbia County at 9:30 am; Luzerne County was then asked to complete the test from its controller, but it experienced a similar failure.

"The vendor that services the system was called in and is working to fix the problem, which is believed to be a fault in the system radio repeaters.

"A backup emergency notification plan is in place with local emergency agencies.

"A voluntary notification will be made to the Pennsylvania Emergency Management Agency."

The licensee notified the NRC Resident Inspector.

* * * UPDATE FROM RICH KLINEFELTER TO VINCE KLCO AT 1847 ON 09/09/2009 * * *

All emergency sirens were restored to service and tested successfully as of 1742 on 09/09/2009.

The licensee notified the NRC Resident Inspector.

Notified R1DO(Powell).


Power Reactor
Event Number: 45337
Facility: POINT BEACH
Region: 3     State: WI
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: RYAN RODE
HQ OPS Officer: VINCE KLCO
Notification Date: 09/09/2009
Notification Time: 17:15 [ET]
Event Date: 09/09/2009
Event Time: 15:23 [CDT]
Last Update Date: 09/09/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
MARK RING (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
OFFSITE NOTIFICATION DUE TO SOIL SAMPLE RESULTS IN EXCESS OF STATE REQUIREMENTS

"At 1523 CDT, on September 9, 2009, the Wisconsin Department of Natural Resources (WDNR) was notified via electronic mail that laboratory analyses of soil samples collected from the catch basins surrounding the Unit 1 and 2 Main Power Transformers, 1X01, and 2X01, revealed polycyclic aromatic hydrocarbon (PAH) levels in excess of Wisconsin Administrative Code requirements. Remediation will be performed in accordance with Wisconsin Administrative Code requirements."

The licensee notified the NRC Resident Inspector.


Power Reactor
Event Number: 46594
Facility: FORT CALHOUN
Region: 4     State: NE
Unit: [1] [] []
RX Type: (1) CE
NRC Notified By: NATHAN SEID
HQ OPS Officer: DONALD NORWOOD
Notification Date: 02/04/2011
Notification Time: 18:17 [ET]
Event Date: 09/09/2009
Event Time: 08:02 [CST]
Last Update Date: 02/04/2011
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
LINDA HOWELL (R4DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
UNSEALED PENETRATIONS DISCOVERED IN THE INTAKE STRUCTURE

"On September 9, 2009, the NRC Component Design Basis Inspection (CDBI) Team identified Fire Protection penetrations on the west side of the Intake Structure were not sealed and it has been determined that the penetrations were below the USAR [Updated Safety Analysis Report] credited flood level. Flooding through the penetrations could have impacted the ability of all the station Raw Water Pumps to perform their design accident mitigation functions. Reference Fort Calhoun Station Condition Report 2009-4166.

"This eight-hour notification is being made pursuant to 10 CFR 50.72 (b)(3)(v). This report should have been made on September 9, 2009, and is late. Subsequent review of the issue determined this reportability."

The penetrations have since been sealed. The licensee notified the NRC Resident Inspector. See EN #46590 dated 2/3/2011 for a similar event at Fort Calhoun.