Event Notification Report for June 27, 2009
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
06/26/2009 - 06/27/2009
EVENT NUMBERS
45170
Power Reactor
Event Number: 45170
Facility: WATTS BAR
Region: 2 State: TN
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: BILLY JOHNSON
HQ OPS Officer: JOHN KNOKE
Region: 2 State: TN
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: BILLY JOHNSON
HQ OPS Officer: JOHN KNOKE
Notification Date: 06/27/2009
Notification Time: 17:58 [ET]
Event Date: 06/27/2009
Event Time: 13:20 [EDT]
Last Update Date: 06/27/2009
Notification Time: 17:58 [ET]
Event Date: 06/27/2009
Event Time: 13:20 [EDT]
Last Update Date: 06/27/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
GERALD MCCOY (R2DO)
GERALD MCCOY (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
AUXILIARY BUILDING GAS TREATMENT SYSTEM RENDERED INOPERABLE
"On June 27, 2009, Plant Operations was starting up the U2 [Unit 2] Auxiliary Building General Ventilation System upon completion of U2 damper maintenance. During startup of the U2 Auxiliary Building Ventilation System, the operator started the U2 General Exhaust fan followed by the startup of the U2 General Supply fan. During the time span of less than 1 minute, when the U2 General Exhaust fan was running but before the U2 General Supply fan was running, the differential pressure condition across a set of Auxiliary Building Secondary Containment Enclosure (ABSCE) doors caused the doors to come off of the tracks and therefore created an ABSCE breach. A breach of this magnitude renders both trains of Auxiliary Building Gas Treatment System (ABGTS) inoperable.
"Upon identification of the failed doors at 1320 EDT on June 27, 2009 the plant entered TS Condition 3.7.12.B for 2 trains of ABGTS being inoperable. Repairs to re-establish the integrity of the ABSCE were immediately initiated and TS Condition 3.7.12.B was exited at 1649 EDT, approximately 3 and 1/2 hours later.
"This event is reportable under 10 CFR 50.72(b)(3)(v)(C) and (D) as a condition that could have prevented the safety function of structures or systems that are needed to : (C) Control the release of radioactive material; or (D) Mitigate the consequences of an accident."
The licensee has notified the NRC Resident Inspector.
"On June 27, 2009, Plant Operations was starting up the U2 [Unit 2] Auxiliary Building General Ventilation System upon completion of U2 damper maintenance. During startup of the U2 Auxiliary Building Ventilation System, the operator started the U2 General Exhaust fan followed by the startup of the U2 General Supply fan. During the time span of less than 1 minute, when the U2 General Exhaust fan was running but before the U2 General Supply fan was running, the differential pressure condition across a set of Auxiliary Building Secondary Containment Enclosure (ABSCE) doors caused the doors to come off of the tracks and therefore created an ABSCE breach. A breach of this magnitude renders both trains of Auxiliary Building Gas Treatment System (ABGTS) inoperable.
"Upon identification of the failed doors at 1320 EDT on June 27, 2009 the plant entered TS Condition 3.7.12.B for 2 trains of ABGTS being inoperable. Repairs to re-establish the integrity of the ABSCE were immediately initiated and TS Condition 3.7.12.B was exited at 1649 EDT, approximately 3 and 1/2 hours later.
"This event is reportable under 10 CFR 50.72(b)(3)(v)(C) and (D) as a condition that could have prevented the safety function of structures or systems that are needed to : (C) Control the release of radioactive material; or (D) Mitigate the consequences of an accident."
The licensee has notified the NRC Resident Inspector.