Skip to main content

Event Notification Report for May 19, 2009

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/18/2009 - 05/19/2009

EVENT NUMBERS
45180450804508145082

Power Reactor
Event Number: 45180
Facility: OCONEE
Region: 2     State: SC
Unit: [] [] [3]
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: RANDY TODD
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 07/01/2009
Notification Time: 16:19 [ET]
Event Date: 05/19/2009
Event Time: 16:09 [EDT]
Last Update Date: 07/01/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
RANDY MUSSER (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Hot Standby 0 Hot Standby
Event Text
INVALID FEEDWATER SYSTEM ACTUATION WHILE SHUTDOWN

"On 5-19-09 ONS [Oconee Nuclear Station] Unit 3 was in Mode 3 during startup from a refueling outage. At 1609 EDT the 3A Motor Driven Emergency Feedwater Pump (MDEFWP) unexpectedly started when the control switch was placed in the AUTO2 position as part of system alignment prior to unit startup. Investigation found that the impulse line for the hydraulic oil pressure switch on the operating 3A Main Feedwater Pump was clogged, causing sensed pressure to read below setpoint. Repositioning the control switch enabled the 3A MDEFWP auto start circuitry, which immediately actuated due to the pre-existing false low pressure indication. Several other redundant indications validated that the pressure signal to the pressure switch was false and that actual hydraulic oil pressure remained above the pressure switch setpoint. Although the pressure switch did see low pressure in the impulse line, the actuation is considered invalid since the signal was based on a false reading that did not represent actual plant conditions.

"Therefore this report is being made under 10 CFR 50.73(a)(1) and 50.73 (a)(2)(iv)(A).

"Per NUREG-1022, Rev. 2 the following information is requested:

A) The specific train(s) and system(s) that were actuated. 3A Motor Driven Emergency Feedwater Pump (MDEFWP) which feeds the 3A Steam Generator (SG).

B) Whether each train actuation was complete or partial. The train actuation was considered complete. The pump started per the signal and operated as required/expected in response to the signal. This pump is the only component in the train which receives a specific signal as part of the actuation circuitry.

C) Whether or not the system started and functioned successfully. The 3A MDEFWP started and the system functioned successfully. The EFW control valve (3FDW-315) is set to control at 30 inches (SG startup level) versus 25 inches for Main Feedwater control. Therefore the SG level increased and the train then controlled at approximately 30 inches while an investigation determined the reason for the actuation (as explained above). The 3A MDEFWP was stopped at 2050 EDT and returned to normal status.

"Initial Safety Significance: Due to low feedwater demand at the time, there was little impact on the unit. Since the SG level was maintained above the normal control system setpoint, Main Feedwater flow was automatically reduced to compensate for the EFW flow. The 3A MDEFWP and associated pressure switch/actuation circuit were declared inoperable during pump shutdown and restoration to normal.

"Corrective Action(s): After troubleshooting identified the clogged impulse line, it was isolated and cleared. The 3A MD EFWP and the associated pressure instruments were returned to service."

The licensee notified the NRC Resident Inspector.


Power Reactor
Event Number: 45080
Facility: QUAD CITIES
Region: 3     State: IL
Unit: [1] [2] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: JEFF KOPACZ
HQ OPS Officer: VINCE KLCO
Notification Date: 05/19/2009
Notification Time: 15:11 [ET]
Event Date: 05/19/2009
Event Time: 09:00 [CDT]
Last Update Date: 05/19/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
RICHARD SKOKOWSKI (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Cold Shutdown 0 Cold Shutdown
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF EMERGENCY RESPONSE DATA SYSTEM (ERDS) DUE TO NETWORK SERVICE NOT FUNCTIONING

"On May 19, 2009, it was identified that ERDS was unavailable for approximately 65 minutes (0900 - 1005 hours CDT). It was determined that a network service responsible for broadcasting ERDS data was not functioning. ERDS was restored when the network service was restarted. The cause of the service interruption is under investigation.

"This event is reportable under 10 CFR 50.72(b)(3)(xiii) as a major loss of communications capability.

"The NRC Resident Inspector has been notified."

The State of Illinois will be notified.


Power Reactor
Event Number: 45081
Facility: CALVERT CLIFFS
Region: 1     State: MD
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: KEVIN UMPHREY
HQ OPS Officer: JOE O'HARA
Notification Date: 05/19/2009
Notification Time: 16:13 [ET]
Event Date: 05/19/2009
Event Time: 15:00 [EDT]
Last Update Date: 05/19/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
DON JACKSON (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
EMERGENCY RESPONSE DATA SYSTEM (ERDS) COMPUTER HARDDRIVE OUT OF SERVICE

"The Emergency Response Data System (ERDS) Computer hard drive has failed. It is expected to be returned to service by the end of the week."

The NRC Resident Inspector has been notified.


General Information or Other
Event Number: 45082
Rep Org: MA RADIATION CONTROL PROGRAM
Licensee: QUAKER FABRIC CORPORATION
Region: 1
City: FALL RIVER   State: MA
County:
License #: G0122
Agreement: Y
Docket:
NRC Notified By: J. THOMAS COULOMBE
HQ OPS Officer: VINCE KLCO
Notification Date: 05/20/2009
Notification Time: 15:14 [ET]
Event Date: 05/19/2009
Event Time: 08:30 [EDT]
Last Update Date: 05/20/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
DON JACKSON (R1DO)
LYDIA CHANG (FSME)
JIM WHITNEY (ILTA)
Event Text
AGREEMENT STATE REPORT - UNACCOUNTED FOR SEALED SOURCES

The Commonwealth of Massachusetts provided the following information via facsimile:

The Commonwealth dispatched an inspector to a general licensee facility to conduct an inspection of their thickness gauges. Upon arrival, the inspector discovered that the licensee had undergone bankruptcy in 2007 and the facility was being demolished by a national liquidation company. The building that the gauges were supposed to be stored in had already been demolished.

The 12 thickness gauges were NDC Systems Model #103 and each contained 150 mCi of Am-241.

The Commonwealth of Massachusetts has notified local scrap yards and material recyclers and will be continuing their investigation.


THIS MATERIAL EVENT CONTAINS A "CATEGORY 3" LEVEL OF RADIOACTIVE MATERIAL

Category 3 sources, if not safely managed or securely protected, could cause permanent injury to a person who handled them, or were otherwise in contact with them, for some hours. It could possibly - although it is unlikely - be fatal to be close to this amount of unshielded radioactive material for a period of days to weeks. These sources are typically used in practices such as fixed industrial gauges involving high activity sources (for example, level gauges, dredger gauges, conveyor gauges and spinning pipe gauges) and well logging.

Although IAEA categorization of this event is typically based on device type, the staff has been made aware of the actual activity of the source, and after calculation determines that it is a Category 3 event.

Note: the value assigned by device type "Less than Cat 3" is different than the calculated value "Category 3"