Event Notification Report for May 18, 2009
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/17/2009 - 05/18/2009
EVENT NUMBERS
450764507745078450794508445660
Power Reactor
Event Number: 45076
Facility: PEACH BOTTOM
Region: 1 State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: MITCHELL SAARE
HQ OPS Officer: HOWIE CROUCH
Region: 1 State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: MITCHELL SAARE
HQ OPS Officer: HOWIE CROUCH
Notification Date: 05/18/2009
Notification Time: 05:06 [ET]
Event Date: 05/18/2009
Event Time: 04:50 [EDT]
Last Update Date: 05/20/2009
Notification Time: 05:06 [ET]
Event Date: 05/18/2009
Event Time: 04:50 [EDT]
Last Update Date: 05/20/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
DANIEL HOLODY (R1DO)
DANIEL HOLODY (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
TSC HVAC RENDERED NON-FUNCTIONAL DUE TO PLANNED MAINTENANCE
"At 0450 on Monday, May 18, 2009, power was removed to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) ventilation system for planned preventative maintenance activities on the Unit 1 480VAC Load Center 10B014. During the 10B014 bus outage work activities, temporary power will be supplied to maintain all TSC facility equipment functional with the exception of TSC Normal and Emergency Ventilation. The TSC Supply, Exhaust and HEPA Filter fans will be de-energized, rendering the TSC HVAC non-functional while planned maintenance activities are in progress. This maintenance is scheduled to be worked continuously until completion to minimize out of service time. The planned TSC ventilation outage is scheduled to be completed within 48 hours, including a total of 5 hours to establish and remove the clearances. If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing EP procedures and checklists. It will take no more than 4 hours to return the Ventilation system back to an operable status, dependent on the stage of the work at the time the emergency occurs. If radiological conditions require TSC facility evacuation during ventilation system restoration, the Station Emergency Director will evacuate and relocate the TSC staff in accordance with, EP-AA-112-200-F-01.
"The NRC Resident Inspector has been notified."
* * * UPDATE FROM BRAD KIRKMON TO HOWIE CROUCH @ 0400 EDT ON 5/20/09 * * *
"This is a follow-up courtesy notification to EN# 45076. All scheduled work to the Unit 1 480VAC Load Center 10B014 is complete, with [the] exception of relay trip testing. Bus restoration has been delayed due to differences between the newly installed transformer and the old transformer, which required changes to the clearance. TSC facility restoration to normal power, including Normal and Emergency Ventilation system operation, is scheduled to occur on 5/20/09 day shift.
"The [NRC] Resident Inspector has been notified."
Notified R1DO (Jackson).
"At 0450 on Monday, May 18, 2009, power was removed to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) ventilation system for planned preventative maintenance activities on the Unit 1 480VAC Load Center 10B014. During the 10B014 bus outage work activities, temporary power will be supplied to maintain all TSC facility equipment functional with the exception of TSC Normal and Emergency Ventilation. The TSC Supply, Exhaust and HEPA Filter fans will be de-energized, rendering the TSC HVAC non-functional while planned maintenance activities are in progress. This maintenance is scheduled to be worked continuously until completion to minimize out of service time. The planned TSC ventilation outage is scheduled to be completed within 48 hours, including a total of 5 hours to establish and remove the clearances. If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing EP procedures and checklists. It will take no more than 4 hours to return the Ventilation system back to an operable status, dependent on the stage of the work at the time the emergency occurs. If radiological conditions require TSC facility evacuation during ventilation system restoration, the Station Emergency Director will evacuate and relocate the TSC staff in accordance with, EP-AA-112-200-F-01.
"The NRC Resident Inspector has been notified."
* * * UPDATE FROM BRAD KIRKMON TO HOWIE CROUCH @ 0400 EDT ON 5/20/09 * * *
"This is a follow-up courtesy notification to EN# 45076. All scheduled work to the Unit 1 480VAC Load Center 10B014 is complete, with [the] exception of relay trip testing. Bus restoration has been delayed due to differences between the newly installed transformer and the old transformer, which required changes to the clearance. TSC facility restoration to normal power, including Normal and Emergency Ventilation system operation, is scheduled to occur on 5/20/09 day shift.
"The [NRC] Resident Inspector has been notified."
Notified R1DO (Jackson).
Power Reactor
Event Number: 45077
Facility: PRAIRIE ISLAND
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: DOUG SMITH
HQ OPS Officer: VINCE KLCO
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: DOUG SMITH
HQ OPS Officer: VINCE KLCO
Notification Date: 05/18/2009
Notification Time: 14:41 [ET]
Event Date: 05/18/2009
Event Time: 13:05 [CDT]
Last Update Date: 05/18/2009
Notification Time: 14:41 [ET]
Event Date: 05/18/2009
Event Time: 13:05 [CDT]
Last Update Date: 05/18/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
RICHARD SKOKOWSKI (R3DO)
RICHARD SKOKOWSKI (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 100 | Power Operation | 0 | Hot Standby |
TURBINE TRIP/REACTOR TRIP DUE TO CONDENSER VACUUM
"Prairie Island Unit 1 experienced an automatic turbine and reactor trip following a lockout trip of [the] 12 Circulating Water Pump. Lockout of the circulating water pump resulted in a condenser A/B differential pressure trip of the main turbine which in turn caused an automatic reactor trip. Auxiliary Feedwater Pumps automatically started on low steam generator level. All control rods fully inserted. Decay heat removal is via auxiliary feedwater and condenser steam dump. Offsite power was maintained to safeguards and non-safeguards AC buses. Operations are in progress per Reactor Trip Response emergency procedures to stabilize plant conditions, restore main feedwater flow to the steam generators, and then shut down auxiliary feedwater pumps. The plant will then be maintained per normal shutdown procedures until the cause of the trip is corrected."
No safety or relief valves lifted during the transient. There was no impact on Unit 2.
The licensee notified the NRC Resident Inspector.
"Prairie Island Unit 1 experienced an automatic turbine and reactor trip following a lockout trip of [the] 12 Circulating Water Pump. Lockout of the circulating water pump resulted in a condenser A/B differential pressure trip of the main turbine which in turn caused an automatic reactor trip. Auxiliary Feedwater Pumps automatically started on low steam generator level. All control rods fully inserted. Decay heat removal is via auxiliary feedwater and condenser steam dump. Offsite power was maintained to safeguards and non-safeguards AC buses. Operations are in progress per Reactor Trip Response emergency procedures to stabilize plant conditions, restore main feedwater flow to the steam generators, and then shut down auxiliary feedwater pumps. The plant will then be maintained per normal shutdown procedures until the cause of the trip is corrected."
No safety or relief valves lifted during the transient. There was no impact on Unit 2.
The licensee notified the NRC Resident Inspector.
Fuel Cycle Facility
Event Number: 45078
Facility: B&W NUCLEAR OPERATING GROUP, INC.
Region: 2 State: VA
Unit: [] [] []
RX Type: URANIUM FUEL FABRICATION
NRC Notified By: JAMIE GRASSANO
HQ OPS Officer: MARK ABRAMOVITZ
Region: 2 State: VA
Unit: [] [] []
RX Type: URANIUM FUEL FABRICATION
NRC Notified By: JAMIE GRASSANO
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 05/19/2009
Notification Time: 10:31 [ET]
Event Date: 05/18/2009
Event Time: 14:00 [EDT]
Last Update Date: 06/03/2009
Notification Time: 10:31 [ET]
Event Date: 05/18/2009
Event Time: 14:00 [EDT]
Last Update Date: 06/03/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
JAY HENSON (R2DO)
JAMES RUBENSTONE (NMSS)
OUO FUELS
JAY HENSON (R2DO)
JAMES RUBENSTONE (NMSS)
OUO FUELS
FALSE POSITIVE ERROR ON A BLIND SAMPLE
The licensee received notification of a false positive error on a blind sample. Contact the Headquarters Operations Officer for additional details.
The licensee will notify the NRC Resident Inspector.
* * * UPDATE ON 6/03/09 AT 1407 EDT FROM GRASSANO TO HUFFMAN * * *
After further investigation into this event, the licensee has determined that the blind sample test was an invalid test and not a false positive error as originally reported. Contact the Headquarters Operations Officer for additional details.
The licensee has notified the NRC Resident Inspector. R2DO (Lesser), NMSS EO (Silva), and a copy sent to the Fuels OUO group.
The licensee received notification of a false positive error on a blind sample. Contact the Headquarters Operations Officer for additional details.
The licensee will notify the NRC Resident Inspector.
* * * UPDATE ON 6/03/09 AT 1407 EDT FROM GRASSANO TO HUFFMAN * * *
After further investigation into this event, the licensee has determined that the blind sample test was an invalid test and not a false positive error as originally reported. Contact the Headquarters Operations Officer for additional details.
The licensee has notified the NRC Resident Inspector. R2DO (Lesser), NMSS EO (Silva), and a copy sent to the Fuels OUO group.
General Information or Other
Event Number: 45079
Rep Org: NORTH DAKOTA DEPARTMENT OF HEALTH
Licensee: DAKOTA GASIFICATION PLANT
Region: 4
City: BEULAH State: ND
County:
License #: 42-32219-01
Agreement: Y
Docket:
NRC Notified By: LOUISE ROEHRICH
HQ OPS Officer: JOE O'HARA
Licensee: DAKOTA GASIFICATION PLANT
Region: 4
City: BEULAH State: ND
County:
License #: 42-32219-01
Agreement: Y
Docket:
NRC Notified By: LOUISE ROEHRICH
HQ OPS Officer: JOE O'HARA
Notification Date: 05/19/2009
Notification Time: 12:34 [ET]
Event Date: 05/18/2009
Event Time: 08:45 [MDT]
Last Update Date: 05/21/2009
Notification Time: 12:34 [ET]
Event Date: 05/18/2009
Event Time: 08:45 [MDT]
Last Update Date: 05/21/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
WILLIAM JONES (R4DO)
ANGELA MCINTOSH (FSME)
RICHARD SKOKOWSKI (R3DO)
WILLIAM JONES (R4DO)
ANGELA MCINTOSH (FSME)
RICHARD SKOKOWSKI (R3DO)
RADIOGRAPHY SOURCE STUCK IN THE UNSHIELDED POSITION
The state reported that two radiographers from Team Industrial Incorporated, were performing radiography on some bend joints at the Dakota Gasification Plant (DGP). Following a number of radiography shots, the radiographers attempted to fully retract the source and were unsuccessful. The radiographers expected to retract the source in approximately 4 cranks. However, they were only able to retract approximately 3.5 cranks. The corporate RSO at the site was notified. Barriers were erected and lead shielding has been deployed around the source. Each worker received approximately 30mR. The licensee contacted QSA Global, who has arrived on site and is going to retrieve the source. The device is identified as a SPEC150, S/N 0129 with a 90 curie Ir-192 source.
* * * UPDATE FROM LOUIS ROEHRICH TO HOWIE CROUCH @ 0020 ON 5/20/09 * * *
The State of North Dakota reported that the licensee and technicians from QSA were not able to retrieve the source. Currently, the source is shielded and boundaries have been established. Personnel have been assigned to monitor the boundaries throughout the night. The QSA representatives are expecting delivery of a drum tool and source change tool in the morning to retract/retrieve the source.
Notified R4DO (Jones) and FSME EO (Chang).
* * * UPDATE FROM LOUISE ROEHRICH TO DAN LIVERMORE @ 0903 ON 05/20/09 * * *
The State of North Dakota reported that the drum tool and source change tool will arrive via FedEx on 05/21/09. The area remains controlled with barriers erected.
Notified R4DO (Jones) and FSME EO (McIntosh).
* * * UPDATE FROM LOUISE ROEHRICH TO DONALD NORWOOD @ 1953 ON 05/21/09 * * *
The State of North Dakota reported by telephone that the source had been fully retracted back into the camera. The camera will be taken to Minnesota tomorrow by Team Industrial personnel. After arrival in Minnesota the camera will be shipped to QSA for evaluation and repair.
This incident did not result in any injuries or any excess exposures.
Notified R4DO (Jones) and FSME EO (Chang)
The state reported that two radiographers from Team Industrial Incorporated, were performing radiography on some bend joints at the Dakota Gasification Plant (DGP). Following a number of radiography shots, the radiographers attempted to fully retract the source and were unsuccessful. The radiographers expected to retract the source in approximately 4 cranks. However, they were only able to retract approximately 3.5 cranks. The corporate RSO at the site was notified. Barriers were erected and lead shielding has been deployed around the source. Each worker received approximately 30mR. The licensee contacted QSA Global, who has arrived on site and is going to retrieve the source. The device is identified as a SPEC150, S/N 0129 with a 90 curie Ir-192 source.
* * * UPDATE FROM LOUIS ROEHRICH TO HOWIE CROUCH @ 0020 ON 5/20/09 * * *
The State of North Dakota reported that the licensee and technicians from QSA were not able to retrieve the source. Currently, the source is shielded and boundaries have been established. Personnel have been assigned to monitor the boundaries throughout the night. The QSA representatives are expecting delivery of a drum tool and source change tool in the morning to retract/retrieve the source.
Notified R4DO (Jones) and FSME EO (Chang).
* * * UPDATE FROM LOUISE ROEHRICH TO DAN LIVERMORE @ 0903 ON 05/20/09 * * *
The State of North Dakota reported that the drum tool and source change tool will arrive via FedEx on 05/21/09. The area remains controlled with barriers erected.
Notified R4DO (Jones) and FSME EO (McIntosh).
* * * UPDATE FROM LOUISE ROEHRICH TO DONALD NORWOOD @ 1953 ON 05/21/09 * * *
The State of North Dakota reported by telephone that the source had been fully retracted back into the camera. The camera will be taken to Minnesota tomorrow by Team Industrial personnel. After arrival in Minnesota the camera will be shipped to QSA for evaluation and repair.
This incident did not result in any injuries or any excess exposures.
Notified R4DO (Jones) and FSME EO (Chang)
General Information or Other
Event Number: 45084
Rep Org: ARKANSAS DEPARTMENT OF HEALTH
Licensee: ALBEMARLE CORPORATION
Region: 4
City: MAGNOLIA State: AR
County:
License #: ARK-0717-0312
Agreement: Y
Docket:
NRC Notified By: STEVE E. MACK
HQ OPS Officer: VINCE KLCO
Licensee: ALBEMARLE CORPORATION
Region: 4
City: MAGNOLIA State: AR
County:
License #: ARK-0717-0312
Agreement: Y
Docket:
NRC Notified By: STEVE E. MACK
HQ OPS Officer: VINCE KLCO
Notification Date: 05/20/2009
Notification Time: 16:23 [ET]
Event Date: 05/18/2009
Event Time: 00:00 [CDT]
Last Update Date: 07/09/2009
Notification Time: 16:23 [ET]
Event Date: 05/18/2009
Event Time: 00:00 [CDT]
Last Update Date: 07/09/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
WILLIAM JONES (R4DO)
LYDIA CHANG (FSME)
WILLIAM JONES (R4DO)
LYDIA CHANG (FSME)
AGREEMENT STATE REPORT - STUCK SHUTTER
The State provided the following information regarding a previously unreported event received via e-mail:
"On May 19, 2009, the Department was notified by the licensee of a stuck shutter. The gauge is a Kay-Ray Model 7063S, Serial S97D2115, containing 100 millicuries of Cesium-137. The gauge was originally installed in 1997. The stuck shutter was discovered during routine shutter checks on May 18, 2009. The licensee tried to release the shutter, but was unable to do so and is currently working to schedule a service provider for repair. The licensee is maintaining control of the area where the gauge is installed."
* * * UPDATE FROM ROBERT PEMBERTON TO JOE O'HARA AT 1538 ON 7/9/09 * * *
The State provided the following information via e-mail:
"The following are the findings of the Arkansas Department of Health, Radioactive Materials Program, concerning event Number 45084 at Albemarle Corporation in Magnolia, AR. From information provided by Albemarle Corporation and ThermoFisher Scientific, the Department has determined that this event was caused by the use of an improper lubricant that deposited a residue, over time, and interfered with the rotation of the shutter. The technician noted, at the time, that the gauge housing had been installed upside down, and that this may have contributed to the shutter sticking. Both ThermoFisher's report, dated June 11, 2009, and Albemarle Corporation's report, dated June 15, 2009, concur with the Department's observations; that the technician was able to close the shutter and then reinstalled the gauge in its proper orientation. No personnel exposures occurred during this incident. The Department has concluded that the root cause of this incident is improper maintenance. The Department considers this incident to be closed. "
Notified R4DO(Hay) and FSME EO(Vontill).
The State provided the following information regarding a previously unreported event received via e-mail:
"On May 19, 2009, the Department was notified by the licensee of a stuck shutter. The gauge is a Kay-Ray Model 7063S, Serial S97D2115, containing 100 millicuries of Cesium-137. The gauge was originally installed in 1997. The stuck shutter was discovered during routine shutter checks on May 18, 2009. The licensee tried to release the shutter, but was unable to do so and is currently working to schedule a service provider for repair. The licensee is maintaining control of the area where the gauge is installed."
* * * UPDATE FROM ROBERT PEMBERTON TO JOE O'HARA AT 1538 ON 7/9/09 * * *
The State provided the following information via e-mail:
"The following are the findings of the Arkansas Department of Health, Radioactive Materials Program, concerning event Number 45084 at Albemarle Corporation in Magnolia, AR. From information provided by Albemarle Corporation and ThermoFisher Scientific, the Department has determined that this event was caused by the use of an improper lubricant that deposited a residue, over time, and interfered with the rotation of the shutter. The technician noted, at the time, that the gauge housing had been installed upside down, and that this may have contributed to the shutter sticking. Both ThermoFisher's report, dated June 11, 2009, and Albemarle Corporation's report, dated June 15, 2009, concur with the Department's observations; that the technician was able to close the shutter and then reinstalled the gauge in its proper orientation. No personnel exposures occurred during this incident. The Department has concluded that the root cause of this incident is improper maintenance. The Department considers this incident to be closed. "
Notified R4DO(Hay) and FSME EO(Vontill).
General Information or Other
Event Number: 45660
Rep Org: PA BUREAU OF RADIATION PROTECTION
Licensee: INTEGRITY TESTLAB
Region: 1
City: CONOCO PHILIPS TRAINER State: PA
County:
License #: PA1181
Agreement: Y
Docket:
NRC Notified By: DAVID ALLARD
HQ OPS Officer: JOHN KNOKE
Licensee: INTEGRITY TESTLAB
Region: 1
City: CONOCO PHILIPS TRAINER State: PA
County:
License #: PA1181
Agreement: Y
Docket:
NRC Notified By: DAVID ALLARD
HQ OPS Officer: JOHN KNOKE
Notification Date: 01/25/2010
Notification Time: 22:30 [ET]
Event Date: 05/18/2009
Event Time: 00:00 [EST]
Last Update Date: 01/25/2010
Notification Time: 22:30 [ET]
Event Date: 05/18/2009
Event Time: 00:00 [EST]
Last Update Date: 01/25/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
SAM HANSELL (R1DO)
LARRY CAMPER (FSME)
SAM HANSELL (R1DO)
LARRY CAMPER (FSME)
AGREEMENT STATE REPORT - DIFFICULTY RETRACTING GAMMA SOURCE
The following excerpted information was received via facsimile:
"Notifications: A letter dated June 6, 2009 was received by DEP [Department of Environmental Protection] on June 15, 2009 that described the incident.
"Radiography crew was performing their 7th exposure at a location within the FCC Scrubber Unit (PV-7923). Upon completion of the exposure time (2 minutes), the crew attempted to retract the gamma source to its shielded / safe position. It was during the retraction sequence that the crew had difficulty returning the source to the shielded position. Both individuals made several attempts to retract the source. The crew re-established the posted radiation boundary to where the radiation levels were at or below regulatory limits for this situation (2 mR/hr), and implemented their source recovery procedures."
Event Report ID No: PA090025
The following excerpted information was received via facsimile:
"Notifications: A letter dated June 6, 2009 was received by DEP [Department of Environmental Protection] on June 15, 2009 that described the incident.
"Radiography crew was performing their 7th exposure at a location within the FCC Scrubber Unit (PV-7923). Upon completion of the exposure time (2 minutes), the crew attempted to retract the gamma source to its shielded / safe position. It was during the retraction sequence that the crew had difficulty returning the source to the shielded position. Both individuals made several attempts to retract the source. The crew re-established the posted radiation boundary to where the radiation levels were at or below regulatory limits for this situation (2 mR/hr), and implemented their source recovery procedures."
Event Report ID No: PA090025