Event Notification Report for May 03, 2009
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/02/2009 - 05/03/2009
Power Reactor
Event Number: 45038
Facility: ARKANSAS NUCLEAR
Region: 4 State: AR
Unit: [1] [2] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: CRYSTAL GARBE
HQ OPS Officer: STEVE SANDIN
Region: 4 State: AR
Unit: [1] [2] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: CRYSTAL GARBE
HQ OPS Officer: STEVE SANDIN
Notification Date: 05/03/2009
Notification Time: 14:32 [ET]
Event Date: 05/03/2009
Event Time: 07:45 [CDT]
Last Update Date: 05/03/2009
Notification Time: 14:32 [ET]
Event Date: 05/03/2009
Event Time: 07:45 [CDT]
Last Update Date: 05/03/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
WAYNE WALKER (R4DO)
WAYNE WALKER (R4DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
LOSS OF EOF COMMUNICATION CAPABILITY DUE TO EQUIPMENT FAILURE
"At approximately 0745 [CDT] it was determined that the ANO telephone system communications for outgoing and incoming calls had been lost. An ENS phone check was performed satisfactory with the NRC. Two alternate dedicated outside lines located in the Control Rooms and five alternate NRC lines in the TSC were operating satisfactory.
"However, when E-plan personnel evaluated the EOF located in the nearby training center, there was only one outside line that was functioning and in addition to a lack of external phone lines, there was no internal phone communications available between the EOF and the plant. The impairment to the EOF due to the lack of communications was considered a major loss of emergency assessment capability per 50.72(b)(3)(xiii).
"Phone service to the site was returned at 1031 [CDT]. Phone service to the EOF was verified at 1145 [CDT]."
This event was the result of an offsite power outage on 05/02/09. Following the loss of power, the onsite telephone equipment transferred automatically to battery supplied backup power. When the affected offsite power was restored, the telephone equipment power supply failed to automatically realign (auto transfer). No alarms were available to operators to detect the power supply misalignment.
The licensee notified the NRC Resident Inspector.
"At approximately 0745 [CDT] it was determined that the ANO telephone system communications for outgoing and incoming calls had been lost. An ENS phone check was performed satisfactory with the NRC. Two alternate dedicated outside lines located in the Control Rooms and five alternate NRC lines in the TSC were operating satisfactory.
"However, when E-plan personnel evaluated the EOF located in the nearby training center, there was only one outside line that was functioning and in addition to a lack of external phone lines, there was no internal phone communications available between the EOF and the plant. The impairment to the EOF due to the lack of communications was considered a major loss of emergency assessment capability per 50.72(b)(3)(xiii).
"Phone service to the site was returned at 1031 [CDT]. Phone service to the EOF was verified at 1145 [CDT]."
This event was the result of an offsite power outage on 05/02/09. Following the loss of power, the onsite telephone equipment transferred automatically to battery supplied backup power. When the affected offsite power was restored, the telephone equipment power supply failed to automatically realign (auto transfer). No alarms were available to operators to detect the power supply misalignment.
The licensee notified the NRC Resident Inspector.
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 45039
Facility: SUMMER
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: ARNIE CRIB
HQ OPS Officer: DONALD NORWOOD
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: ARNIE CRIB
HQ OPS Officer: DONALD NORWOOD
Notification Date: 05/03/2009
Notification Time: 18:29 [ET]
Event Date: 05/03/2009
Event Time: 03:10 [EDT]
Last Update Date: 05/07/2009
Notification Time: 18:29 [ET]
Event Date: 05/03/2009
Event Time: 03:10 [EDT]
Last Update Date: 05/07/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
MIKE ERNSTES (R2DO)
MIKE ERNSTES (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
24-HOUR NRC BULLETIN 80-24 REPORT DUE TO POSSIBLE SERVICE WATER SYSTEM LEAKAGE INTO CONTAINMENT
"V.C. Summer Nuclear Station is notifying the NRC in accordance with NRC Bulletin 80-24, regarding Service Water System leakage into containment.
"At approximately 0310 on 05/03/09, Reactor Building sump sample analyses, in response to increasing sump level, indicated a probable leak from the Industrial Cooling Water System at 0.38 gpm.
"In accordance with Bulletin 80-24, a 14 day written report will be submitted."
The licensee is continuing to monitor at this time. A corrective action plan to definitively identify where the leak is coming from will be developed.
The licensee notified the NRC Resident Inspector. The licensee plans on notifying State of South Carolina and the counties of Fairfield, Richland, Lexington, and Newberry EP representatives.
* * * RETRACTION ON 5/7/2009 AT 1705 FROM JASON WEATHERSBY TO MARK ABRAMOVITZ * * *
"On 05/06/2009, a reactor building entry was made, and the previously reported leak was determined to be from the Industrial Cooling Water system. The location of the leak was from a mechanical seal of a non-safety rod position indication equipment cabinet cooling pump. No degradation of a containment boundary exists. EN # 45039 is being retracted, and a 14 day report will not be submitted."
The licensee notified the NRC Resident Inspector.
Notified the R2DO (Guthrie).
"V.C. Summer Nuclear Station is notifying the NRC in accordance with NRC Bulletin 80-24, regarding Service Water System leakage into containment.
"At approximately 0310 on 05/03/09, Reactor Building sump sample analyses, in response to increasing sump level, indicated a probable leak from the Industrial Cooling Water System at 0.38 gpm.
"In accordance with Bulletin 80-24, a 14 day written report will be submitted."
The licensee is continuing to monitor at this time. A corrective action plan to definitively identify where the leak is coming from will be developed.
The licensee notified the NRC Resident Inspector. The licensee plans on notifying State of South Carolina and the counties of Fairfield, Richland, Lexington, and Newberry EP representatives.
* * * RETRACTION ON 5/7/2009 AT 1705 FROM JASON WEATHERSBY TO MARK ABRAMOVITZ * * *
"On 05/06/2009, a reactor building entry was made, and the previously reported leak was determined to be from the Industrial Cooling Water system. The location of the leak was from a mechanical seal of a non-safety rod position indication equipment cabinet cooling pump. No degradation of a containment boundary exists. EN # 45039 is being retracted, and a 14 day report will not be submitted."
The licensee notified the NRC Resident Inspector.
Notified the R2DO (Guthrie).