Skip to main content

Event Notification Report for February 07, 2009

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/06/2009 - 02/07/2009

EVENT NUMBERS
44837

Power Reactor
Event Number: 44837
Facility: ARKANSAS NUCLEAR
Region: 4     State: AR
Unit: [1] [] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: PETER JACKSON
HQ OPS Officer: VINCE KLCO
Notification Date: 02/07/2009
Notification Time: 12:18 [ET]
Event Date: 02/07/2009
Event Time: 10:59 [CST]
Last Update Date: 02/10/2009
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a) (1) (i) - EMERGENCY DECLARED 50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
JEFF CLARK (R4)
ELMO COLLINS (R4 R)
BRIAN McDERMOTT (IRD)
PATRICK HILAND (NRR)
JAMES WIGGINS (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 90 Power Operation 0 Hot Standby
Event Text
UNUSUAL EVENT DECLARED DUE TO A FIRE ONSITE

Arkansas Nuclear One Unit 1 declared an Unusual Event per EAL 7.5 at 1059 CST based on a fire onsite. The fire occurred on the 354 foot elevation iso-phase bus deck of the turbine building. The fire was attributed to a failed bonnet on a manual valve which had unthreaded during operation releasing hydrogen in the vicinity of the hydrogen add station. The licensee extinguished the fire using water and posted a reflash watch. There were no reported personnel injuries. Offsite assistance was requested from the London Fire Department which arrived onsite after the fire had been extinguished.

The reactor was manually tripped with all control rods fully inserting. The plant is currently stable with decay heat removal via the steam dumps to the main condenser.

The licensee informed state/local agencies and the NRC Resident Inspector.

* * * UPDATE AT 1338 EST ON 2/7/09 FROM JACKSON TO SANDIN * * *

The Unusual Event was terminated at 1338 CST after confirmation that the fire was extinguished and a review of the exit criteria as defined in plant procedures. The licensee is performing a damage assessment at this time.

The licensee was in the process of informing state/local agencies and will inform the NRC Resident Inspector. Notified R4DO (Clark), NRR(Hiland), IRD (Grant), DHS (Banner) and FEMA (Canupp).

* * * UPDATE AT 1508 EST ON 2/10/09 FROM SCHEIDE TO HUFFMAN * * *

"The subject event notification erroneously reported that all control rods fully inserted following the manual reactor trip initiated in response to a fire on site. In actuality, the rod bottom light for Rod 6 in Rod Group 7 on the CRD Position Indication Panel did not illuminate following the reactor trip and it was verified by plant computer to have inserted to 2.3 percent withdrawn.

"The control board operator identified this condition quickly and reported it to the Control Room Supervisor in his immediate action response. This condition did not necessitate any additional operator actions and shutdown margin requirements were maintained."

The licensee has informed the NRC Resident Inspector. R4DO (Miller) notified.