Power Reactor
Event Number: 44624
Facility: MCGUIRE
Region: 2     State: NC
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: ERIC BLOUGH
HQ OPS Officer: JOE O'HARA
Notification Date: 11/03/2008
Notification Time: 04:35 [ET]
Event Date: 11/03/2008
Event Time: 02:07 [EST]
Last Update Date: 12/31/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
DEBORAH SEYMOUR (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R N 0 Cold Shutdown 0 Cold Shutdown
Event Text
MANUALLY OPENED REACTOR TRIP CIRCUIT BREAKERS TO INSERT CONTROL BANK "B"

"Manually opened reactor trip breakers in Mode 5 to insert control bank 'B' due to blown fuse in rod control cabinet."

Licensee was moving control rod bank "B" following I & C work, and the control rod bank failed to move as expected. All other control rod banks were inserted into the core at the time of the event. EDG's and offsite power sources are OPERABLE, and there is no increase in plant risk.

The licensee will inform the NRC Resident Inspector.

* * * RETRACTION ON 12/31/08 AT 1326 FROM RICK ABBOTT TO PETE SNYDER * * *

"Regarding the NRC Event Number 44624 conveyed November 3, 2008, McGuire Nuclear Station has determined that manually opening the reactor trip breakers was not reportable and hereby retracts this notification. Upon further consideration it was determined that manually opening the reactor trip breakers was a conservative decision to fully insert control rods based on the failure mechanism causing a single rod to drop to the fully inserted position. Manual actuation of the reactor trip breakers was not required by abnormal procedures and was performed only after consultation between operations, engineering and senior station management agreed that this was the preferred option. Therefore, the decision to manually open the reactor trip breakers is considered to be a preplanned actuation of the reactor protection system and is not reportable."

The licensee informed the NRC Resident Inspector. Notified R2DO (M. Lesser).


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 44626
Facility: DRESDEN
Region: 3     State: IL
Unit: [] [] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: THOMAS DITCHFIELD
HQ OPS Officer: JOHN KNOKE
Notification Date: 11/03/2008
Notification Time: 14:43 [ET]
Event Date: 11/03/2008
Event Time: 06:52 [CST]
Last Update Date: 11/18/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(B) - POT RHR INOP
Person (Organization):
KENNETH RIEMER (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Hot Shutdown 0 Hot Shutdown
Event Text
RECIRC LOOP TEMPERATURE ELEMENT FAILED

"On 11/3/08 at 0652 Shutdown Cooling (SDC) was lost on Dresden Unit 3 when the Recirc Loop Temperature Element (3-0260-13B) failed upscale. Unit 3 was in the process of initial cooldown for entry into a refueling outage. Actual Recirc loop temperature was about 217 degrees F based on alternate indications. The temperature element (3-0260-13B) remained upscale for several minutes before returning to its previous value. The failed element was jumpered out and SDC was restarted. This event is reportable under 10CFR 50.72(b)(3)(v)(B)."

The licensee notified NRC Resident Inspector.

RETRACTION ON 11/18/2008 AT 1214 FROM RANDY WROBLEWSKI TO MARK ABRAMOVITZ * * *

"On November 3, 2008 shutdown cooling was lost on Dresden Unit 3 when the Reactor Recirculation System Loop Temperature Element (3-0260-13B) failed upscale. Plant operators immediately recognized the condition, and implemented an existing operations procedure to re-establish shutdown cooling flow and ensure that the Shutdown Cooling System continued to fulfill the safety function of residual heat removal. The Shutdown Cooling System is a manually initiated, non-safety related system that is not credited for mitigation of any event or accident in Dresden's safety analyses. The implementation of an existing procedure to restore shutdown cooling system flow in a short period of time (i.e., less than 10 minutes in this case), by the Main Control Room operators trained on the procedure, provides reasonable assurance that the system continued to fulfill its safety function. Therefore, Exelon Generation Company, LLC has determined that this event is not reportable under 10CFR 50.72(b)(3)(v)(B) and is retracting ENS Report 44626."

The licensee notified the NRC Resident Inspector.

Notified the R3DO (O'Brien).


Power Reactor
Event Number: 44627
Facility: SEQUOYAH
Region: 2     State: TN
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: JULIOUS WHITWORTH
HQ OPS Officer: JOE O'HARA
Notification Date: 11/04/2008
Notification Time: 02:58 [ET]
Event Date: 11/03/2008
Event Time: 23:22 [EST]
Last Update Date: 11/05/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
DEBORAH SEYMOUR (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 100 Power Operation 0 Hot Standby
Event Text
MANUAL REACTOR TRIP DUE TO FEEDWATER REG VALVE FAILURE

"On 11/3/08 at 2322, Unit 2 was manually tripped due to the failure of Loop 4 Feed Water Reg. Valve (FRV Controller). Manual control was attempted to control level in Loop 4 Steam Generator (S/G); however, Loop 4 FRV failed to respond. A manual Reactor Trip was initiated as a result of this failure. In addition, Auxiliary Feedwater (AFW) initiated as required due to a Feedwater isolation signal

"The Loop 4 FRV did isolate from the Feedwater isolation signal.

"The Plant is being maintained in Mode 3 at NOT/NOP, 547 F and 2235 psig, with AFW supplying the S/G's and Steam Dumps removing decay heat.

"Additionally, Unit 2 has an indication of a primary leak inside lower containment. The leak rate is calculated to be approximately 2.0 gallons per minute. Based on current indications, the leak is suspected to be from a Pressurizer level transmitter

"No primary system or steam generator safety valves opened due to this trip. An investigation has been initiated to determine the cause of the Loop 4 Feed Water Reg. Valve (FRV Controller) failure and the source of the approximately 2.0 gallons per minute primary leak. A recovery plan will be developed."

Pressurizer (PRZ) level is stable. All safety related systems are available and OPERABLE for safe plant shutdown. There is no impact on Unit 1. The loop 2 S/G blowdown sample line valve did not go closed as expected on the Feedwater isolation signal. The licensee is taking action to isolate it.

The licensee notified the NRC Resident Inspector.

* * * UPDATE FROM LARRY PRUETT TO JOE O'HARA AT 0001 ON 11/5/08 * * *

"The Sequoyah Nuclear Plant Unit - 2 reactor coolant system unidentified leakage was terminated on Nov. 4, 2008 @ 2205 hours when a manual valve was closed isolating the reactor coolant system from the leak location."

The licensee closed the root valve to the PZR pressure channel 2-VLV-68-446A.

The licensee will notify the NRC Resident Inspector.

Notified R2DO(Desai)


General Information or Other
Event Number: 44754
Rep Org: MA RADIATION CONTROL PROGRAM
Licensee: NOT APPLICABLE
Region: 1
City: AMESBURY   State: MA
County:
License #: NOT APPICABLE
Agreement: Y
Docket:
NRC Notified By: J. THOMAS COULOMBE
HQ OPS Officer: BILL HUFFMAN
Notification Date: 01/06/2009
Notification Time: 13:28 [ET]
Event Date: 11/03/2008
Event Time: 00:00 [EST]
Last Update Date: 01/06/2009
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
HAROLD GRAY (R1)
PATRICE BUBAR (FSME)
Event Text
AGREEMENT STATE - 5 MICRO CURIES OF RADIUM-226 FOUND IN TRASH

The following information was provided by the State via e-mail:

"An exclusive load of trash from a residential clean out from a dwelling resulted in a rejection at the transfer station [Allied Waste] when the radiation alarms sounded. The hauler provided the name of a person who had assisted a clean out of a deceased relative's residence in Amesbury, Massachusetts. Upon notification, they were required to hire the services of a competent consultant [Radiac Environmental Services out of Brooklyn, NY] to separate and identify the radioactive constituents. The competent consultant discovered a small knob, affixed to a machine screw assembly, located within a voluminous collection of household refuse. The consultant subsequently determined that the [knob] assembly contained 5 micro-curies of radium-226. The consultant also arranged for the proper packaging and shipment of this gadget for the relative of the deceased owner.

"The package was shipped from Newbury, Massachusetts to Brooklyn, New York on November 13, 2008. The shipment arrived in New York on November 17, 2008. This matter is considered closed."


Power Reactor
Event Number: 44665
Facility: DRESDEN
Region: 3     State: IL
Unit: [] [] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: RANDY WROBLEWSKI
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 11/18/2008
Notification Time: 17:08 [ET]
Event Date: 11/03/2008
Event Time: 10:42 [CST]
Last Update Date: 11/18/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(A) - POT UNABLE TO SAFE SD
Person (Organization):
KENNETH O'BRIEN (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
CONTROL RODS DRIFT OUT WHILE SHUTDOWN

"On 11/03/2008, with Unit 3 shut down and all control rods in, an unexpected drift of three control rods out from their full-in position occurred. The immediate cause of this event was high control rod drive (CRD) cooling and exhaust water header pressures as the final group of hydraulic control unit (HCU) valves were being isolated. At the time, Operations personnel were in the process of completing the isolation of the CRD HCUs by closing the (101) Insert Riser Isolation Valve and (102) Withdraw Riser Isolation Valve on each HCU with a CRD pump in operation and the CRD charging water header isolated.

"A control rod drift alarm was received in the Unit 3 control room, followed by several rod position indication system (RPIS) indications that the associated control rods had drifted from position 00 (full-in) to their 'over travel-in' position. Later, all indications returned to the full-in position, with the exception of three CRDs. These three CRDs settled at final positions 06, 16, and 18, respectively. Immediate corrective actions were taken to re-open the 101 valve for each of the three CRDs, allowing the control rod to re-insert to full-in. The 101 valve was then re-closed. Calculations by nuclear engineering identified that the reactor remained subcritical for the actual plant conditions and that there was no risk of fuel damage.

"Initial review of the event by Exelon determined that it was not reportable.

"After additional review and evaluation, the decision was made to conservatively report the event pursuant to 10 CFR 50.72 (b)(3)(v), 'Event or Condition That Could Have Prevented Fulfillment of a Safety Function.' A root cause investigation is underway to determine the cause. The industry has been notified via the operating experience process on November 7, 2008.

"The licensee notified the NRC Resident Inspector."