Event Notification Report for October 05, 2008
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/04/2008 - 10/05/2008
EVENT NUMBERS
44541
Power Reactor
Event Number: 44541
Facility: HOPE CREEK
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: DAVID HALL
HQ OPS Officer: HOWIE CROUCH
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: DAVID HALL
HQ OPS Officer: HOWIE CROUCH
Notification Date: 10/05/2008
Notification Time: 12:17 [ET]
Event Date: 10/05/2008
Event Time: 04:31 [EDT]
Last Update Date: 10/05/2008
Notification Time: 12:17 [ET]
Event Date: 10/05/2008
Event Time: 04:31 [EDT]
Last Update Date: 10/05/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
JOHN WHITE (R1)
JOHN WHITE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM INOPERABLE
"During repair activities associated with the HPCI NUMAC [Nuclear Measurement Analysis And Control] display, the NUMAC drawer failed upon restoration of power. The drawer failure resulted in HPCI isolation signal and [HPCI] turbine trip signal. At the time the HPCI isolation valve was de-energized as planned so the isolation did not occur, but the failure mode resulted in a [HPCI] turbine trip signal, which resulted in an unavailability and inoperability of HPCI. The condition existed for 29 minutes during maintenance activities. Repair activities were unsuccessful and the NUMAC is still inoperable."
The event occurred during the restoration of the HPCI steam leak detection system.
The licensee will be notifying the NRC Resident Inspector.
"During repair activities associated with the HPCI NUMAC [Nuclear Measurement Analysis And Control] display, the NUMAC drawer failed upon restoration of power. The drawer failure resulted in HPCI isolation signal and [HPCI] turbine trip signal. At the time the HPCI isolation valve was de-energized as planned so the isolation did not occur, but the failure mode resulted in a [HPCI] turbine trip signal, which resulted in an unavailability and inoperability of HPCI. The condition existed for 29 minutes during maintenance activities. Repair activities were unsuccessful and the NUMAC is still inoperable."
The event occurred during the restoration of the HPCI steam leak detection system.
The licensee will be notifying the NRC Resident Inspector.