Event Notification Report for September 11, 2008
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
09/10/2008 - 09/11/2008
EVENT NUMBERS
44482444834448444500
Power Reactor
Event Number: 44482
Facility: KEWAUNEE
Region: 3 State: WI
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: BRAD GAUGER
HQ OPS Officer: VINCE KLCO
Region: 3 State: WI
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: BRAD GAUGER
HQ OPS Officer: VINCE KLCO
Notification Date: 09/11/2008
Notification Time: 18:55 [ET]
Event Date: 09/11/2008
Event Time: 12:00 [CST]
Last Update Date: 09/11/2008
Notification Time: 18:55 [ET]
Event Date: 09/11/2008
Event Time: 12:00 [CST]
Last Update Date: 09/11/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(B) - UNANALYZED CONDITION
10 CFR Section:
50.72(b)(3)(ii)(B) - UNANALYZED CONDITION
Person (Organization):
DAVE PASSEHL (R3)
DAVE PASSEHL (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNANALYZED CONDITION RELATED TO CERTAIN FIRE CONDITIONS
"During an NRC [Triennial Fire] Inspection, a condition was identified in which, under certain fire conditions, possible damage scenarios, and required operator actions, the ability to meet the performance criteria of the approved fire protection program may be challenged. Specifically it was postulated under certain fire conditions affecting the relay room, the ability to maintain pressurizer level within indicated range (high) may be challenged due a spurious opening of a pressurizer power operated relief valve.
"Compensatory actions to address the fire in the area of concern are in place.
"This condition is being reported pursuant to 10 CFR 50.72(b)(3)(ii)(B)."
The licensee notified the NRC Resident Inspector.
"During an NRC [Triennial Fire] Inspection, a condition was identified in which, under certain fire conditions, possible damage scenarios, and required operator actions, the ability to meet the performance criteria of the approved fire protection program may be challenged. Specifically it was postulated under certain fire conditions affecting the relay room, the ability to maintain pressurizer level within indicated range (high) may be challenged due a spurious opening of a pressurizer power operated relief valve.
"Compensatory actions to address the fire in the area of concern are in place.
"This condition is being reported pursuant to 10 CFR 50.72(b)(3)(ii)(B)."
The licensee notified the NRC Resident Inspector.
Power Reactor
Event Number: 44483
Facility: OCONEE
Region: 2 State: SC
Unit: [1] [2] [3]
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: JAMES WEAST
HQ OPS Officer: VINCE KLCO
Region: 2 State: SC
Unit: [1] [2] [3]
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: JAMES WEAST
HQ OPS Officer: VINCE KLCO
Notification Date: 09/11/2008
Notification Time: 22:45 [ET]
Event Date: 09/11/2008
Event Time: 21:35 [EDT]
Last Update Date: 09/11/2008
Notification Time: 22:45 [ET]
Event Date: 09/11/2008
Event Time: 21:35 [EDT]
Last Update Date: 09/11/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
CHARLIE PAYNE (R2)
MICHELE EVANS (NRR)
ANTHONY McMURTRAY (IRD)
CHARLIE PAYNE (R2)
MICHELE EVANS (NRR)
ANTHONY McMURTRAY (IRD)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
OFFSITE NOTIFICATION DUE TO WORK-RELATED FATALITY
"On Tuesday, September 9, 2008 a maintenance contractor suffered an apparent heart attack at approximately 0900. On site Medical Emergency Response personnel responded until ambulatory transport to Oconee Medical Center and then Greenville Memorial Hospital. On Thursday, September 11, 2008 at 1755 he passed away at Greenville Memorial Hospital.
"At 2135 on September 11, 2008, Oconee Environmental Health and Safety notified OSHA due to the death of an Oconee contractor. This notification is being made in accordance with Duke Energy Corporation administrative procedures due to notification of a federal agency.
"Licensee notified the NRC Resident Inspector."
"On Tuesday, September 9, 2008 a maintenance contractor suffered an apparent heart attack at approximately 0900. On site Medical Emergency Response personnel responded until ambulatory transport to Oconee Medical Center and then Greenville Memorial Hospital. On Thursday, September 11, 2008 at 1755 he passed away at Greenville Memorial Hospital.
"At 2135 on September 11, 2008, Oconee Environmental Health and Safety notified OSHA due to the death of an Oconee contractor. This notification is being made in accordance with Duke Energy Corporation administrative procedures due to notification of a federal agency.
"Licensee notified the NRC Resident Inspector."
Power Reactor
Event Number: 44484
Facility: MONTICELLO
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: RANDY SAND
HQ OPS Officer: JASON KOZAL
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: RANDY SAND
HQ OPS Officer: JASON KOZAL
Notification Date: 09/12/2008
Notification Time: 01:54 [ET]
Event Date: 09/11/2008
Event Time: 22:47 [CDT]
Last Update Date: 09/12/2008
Notification Time: 01:54 [ET]
Event Date: 09/11/2008
Event Time: 22:47 [CDT]
Last Update Date: 09/12/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION 50.72(b)(3)(v)(B) - POT RHR INOP
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION 50.72(b)(3)(v)(B) - POT RHR INOP
Person (Organization):
DAVE PASSEHL (R3)
ANTHONY McMURTRAY (IRD)
MICHELE EVANS (NRR)
DAVE PASSEHL (R3)
ANTHONY McMURTRAY (IRD)
MICHELE EVANS (NRR)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 100 | Power Operation | 0 | Hot Shutdown |
REACTOR SCRAM AND ISOLATION DUE TO TRANSFORMER LOCKOUT
While the 1R transformer was out of service for maintenance, the 2R transformer experienced a lockout resulting in a loss of normal offsite power, a reactor scram, and a Group 1, 2 and 3 isolation. All rods fully inserted as expected. The cause of the 2R transformer lockout is unknown at this time. After initiation, the high pressure coolant injection (HPCI) system would not trip at the high reactor water level set point +48", as required. The operators then manually isolated the HPCI steam lines.
Plant decay heat removal is with the reactor core isolation cooling (RCIC) system and the safety relief valves. Torus cooling is in service. The vital electrical busses are being supplied by the 1AR transformer. Efforts are underway to restore the 1R transformer to service, and subsequently the non-vital busses.
The licensee notified the NRC Resident Inspector.
* * * UPDATE PROVIDED BY KIM HOFFMAN TO JASON KOZAL AT 0655 ON 09/12/08 * * *
The HPCI system was declared inoperable and isolated due to failure to automatically trip at +48" Reactor Water Level. The HPCI steam supply valves were automatically closed to remove HPCI from service. In addition, the HPCI turbine trip failed to trip with the turbine trip push button. The cause of the trip failure is unknown at this time. The licensee is continuing to investigate. HPCI did automatically start as designed and injected to the reactor vessel as designed. However, HPCI failed to trip at High Reactor Water Level as required.
"Additionally, the Automatic Depressurization System (ADS) timer showed erratic indication following the event. The ADS timer was inhibited to prevent automatic action. ADS is inoperable, but manual steam relief valve operation remains available."
The licensee will notify the NRC Resident Inspector.
Notified R3DO (Passehl), NRR EO (Ross-Lee), and IRD (McMurtray).
* * * UPDATE PROVIDED BY SCHREIFELS TO CROUCH AT 1656 EDT ON 09/12/08 * * *
"A [second] Group 2 isolation signal was received when reactor water level lowered below +9 [inches] [while pumping drywell sumps]. All Group 2 valves except the drywell sump isolation valves were closed due to a previously reported Group 2 signal. The drywell sump valves had been opened to allow manual pumpdown of the sumps. The sump valves closed as expected."
Licensee notified the NRC Resident Inspector.
Notified R3DO (Passehl).
While the 1R transformer was out of service for maintenance, the 2R transformer experienced a lockout resulting in a loss of normal offsite power, a reactor scram, and a Group 1, 2 and 3 isolation. All rods fully inserted as expected. The cause of the 2R transformer lockout is unknown at this time. After initiation, the high pressure coolant injection (HPCI) system would not trip at the high reactor water level set point +48", as required. The operators then manually isolated the HPCI steam lines.
Plant decay heat removal is with the reactor core isolation cooling (RCIC) system and the safety relief valves. Torus cooling is in service. The vital electrical busses are being supplied by the 1AR transformer. Efforts are underway to restore the 1R transformer to service, and subsequently the non-vital busses.
The licensee notified the NRC Resident Inspector.
* * * UPDATE PROVIDED BY KIM HOFFMAN TO JASON KOZAL AT 0655 ON 09/12/08 * * *
The HPCI system was declared inoperable and isolated due to failure to automatically trip at +48" Reactor Water Level. The HPCI steam supply valves were automatically closed to remove HPCI from service. In addition, the HPCI turbine trip failed to trip with the turbine trip push button. The cause of the trip failure is unknown at this time. The licensee is continuing to investigate. HPCI did automatically start as designed and injected to the reactor vessel as designed. However, HPCI failed to trip at High Reactor Water Level as required.
"Additionally, the Automatic Depressurization System (ADS) timer showed erratic indication following the event. The ADS timer was inhibited to prevent automatic action. ADS is inoperable, but manual steam relief valve operation remains available."
The licensee will notify the NRC Resident Inspector.
Notified R3DO (Passehl), NRR EO (Ross-Lee), and IRD (McMurtray).
* * * UPDATE PROVIDED BY SCHREIFELS TO CROUCH AT 1656 EDT ON 09/12/08 * * *
"A [second] Group 2 isolation signal was received when reactor water level lowered below +9 [inches] [while pumping drywell sumps]. All Group 2 valves except the drywell sump isolation valves were closed due to a previously reported Group 2 signal. The drywell sump valves had been opened to allow manual pumpdown of the sumps. The sump valves closed as expected."
Licensee notified the NRC Resident Inspector.
Notified R3DO (Passehl).
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
General Information or Other
Event Number: 44500
Rep Org: CALIFORNIA RADIATION CONTROL PRGM
Licensee: UNIVERSAL HEALTH SVC. OF RANCHO SPRINGS, INC.
Region: 4
City: WILDOMAR State: CA
County:
License #: 2811-33
Agreement: Y
Docket:
NRC Notified By: DELIA AQUINO
HQ OPS Officer: DAN LIVERMORE
Licensee: UNIVERSAL HEALTH SVC. OF RANCHO SPRINGS, INC.
Region: 4
City: WILDOMAR State: CA
County:
License #: 2811-33
Agreement: Y
Docket:
NRC Notified By: DELIA AQUINO
HQ OPS Officer: DAN LIVERMORE
Notification Date: 09/17/2008
Notification Time: 17:39 [ET]
Event Date: 09/11/2008
Event Time: 00:00 [PDT]
Last Update Date: 09/18/2008
Notification Time: 17:39 [ET]
Event Date: 09/11/2008
Event Time: 00:00 [PDT]
Last Update Date: 09/18/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
GREG PICK (R4)
KEVIN HSUEH (FSME)
GREG PICK (R4)
KEVIN HSUEH (FSME)
GREATER THAN PRESCRIBED DOSE ADMINSTERED TO PATIENT
"On Wednesday, September 17, 2008, [a Certified Nuclear Medical Technologist] at Universal Health Services of Rancho Springs, Inc., contacted RHB about a diagnostic misadministration, which had occurred on September 11, 2008. The patient was prescribed a 7 milliCurie dose of Tc-99m Hebrofenin for a Hepatobiliary study (HIDA). At approximately 2:10 P.M. on September 11, 2008, the patient was given a dose of 22 milliCuries of Tc-99m Sestamibi, used for cardiac studies. The dose given was 50% greater than the intended dose. No additional Tc-99m was given since the image required was obtained with the dose that was actually given. The technician had grabbed the wrong syringe from the dose cart. The reason given for the misadministration was a heavy workload. The corrective actions to be taken to prevent a recurrence were to implement new procedures for radiopharmaceutical labeling and handling and to reinstruct personnel. Since the dose administered to the patient was 50% greater than the prescribed dose, the reportability of this event is 24 hours. This event will be investigated by RHB South."
California Report #5010-091708
A "Medical Event" may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.
* * * RETRACTION AT 1044 ON 9/18/2008 FROM DELIA AQUINO TO MARK ABRAMOVITZ * * *
The following report was received via e-mail:
The state of California is retracting this event. "After additional review, we determined that it was not actually a reportable event."
The dose the individual received did not meet the threshold necessary to be reportable under 10CFR35.3045 - Medical Event.
Notified the R4DO (Pick) and FSME (Einberg).
"On Wednesday, September 17, 2008, [a Certified Nuclear Medical Technologist] at Universal Health Services of Rancho Springs, Inc., contacted RHB about a diagnostic misadministration, which had occurred on September 11, 2008. The patient was prescribed a 7 milliCurie dose of Tc-99m Hebrofenin for a Hepatobiliary study (HIDA). At approximately 2:10 P.M. on September 11, 2008, the patient was given a dose of 22 milliCuries of Tc-99m Sestamibi, used for cardiac studies. The dose given was 50% greater than the intended dose. No additional Tc-99m was given since the image required was obtained with the dose that was actually given. The technician had grabbed the wrong syringe from the dose cart. The reason given for the misadministration was a heavy workload. The corrective actions to be taken to prevent a recurrence were to implement new procedures for radiopharmaceutical labeling and handling and to reinstruct personnel. Since the dose administered to the patient was 50% greater than the prescribed dose, the reportability of this event is 24 hours. This event will be investigated by RHB South."
California Report #5010-091708
A "Medical Event" may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.
* * * RETRACTION AT 1044 ON 9/18/2008 FROM DELIA AQUINO TO MARK ABRAMOVITZ * * *
The following report was received via e-mail:
The state of California is retracting this event. "After additional review, we determined that it was not actually a reportable event."
The dose the individual received did not meet the threshold necessary to be reportable under 10CFR35.3045 - Medical Event.
Notified the R4DO (Pick) and FSME (Einberg).