Skip to main content

Event Notification Report for August 21, 2008

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/20/2008 - 08/21/2008

EVENT NUMBERS
444354443244501

Fuel Cycle Facility
Event Number: 44435
Facility: NUCLEAR FUEL SERVICES INC.
Region: 2     State: TN
Unit: [] [] []
RX Type: URANIUM FUEL FABRICATION
Comments: HEU CONVERSION & SCRAP RECOVERY
NAVAL REACTOR FUEL CYCLE
LEU SCRAP RECOVERY
NRC Notified By: RANDY SHACKELFORD
HQ OPS Officer: JOHN KNOKE
Notification Date: 08/22/2008
Notification Time: 14:46 [ET]
Event Date: 08/21/2008
Event Time: 22:30 [EDT]
Last Update Date: 08/22/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
74.57 - ALARM RESOLUTION
Person (Organization):
STEVE ROSE (R2)
ABY MOHSENI (NMSS)
FUELS OUO via Email
Event Text
MATERIALS CONTROL & ACCOUNTABILITY ALARM PROCEDURE INITIATED

"10CFR74.57(f)(2) requires notification within 24 hours that an MC&A [Material Control & Accountability] alarm resolution procedure has been initiated. Because an alarm investigation was initiated, a notification to the NRC Operations Center was made. Additional sampling later indicated the value was below the abrupt alarm value and this was communicated to the NRC Operations Center. There is no indication that a material loss has occurred.

"There were no actual or potential safety consequences to workers, the public, or the environment. MC&A alarm tests were run as specified by applicable procedures and requirements. Based on the alarm test for the Building 333 Oxide Dissolution area, the alarm test value was exceeded. Additional sampling later indicated that the input minus the output value is below the alarm value. An investigation was initiated and additional sampling has indicated that the input minus the output value is below the alarm value."

The licensee has notified the NRC Resident Inspector.


Power Reactor
Event Number: 44432
Facility: COLUMBIA GENERATING STATION
Region: 4     State: WA
Unit: [2] [] []
RX Type: [2] GE-5
NRC Notified By: MARSHA EADES
HQ OPS Officer: VINCE KLCO
Notification Date: 08/21/2008
Notification Time: 22:30 [ET]
Event Date: 08/21/2008
Event Time: 16:06 [PDT]
Last Update Date: 08/21/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
VINCENT GADDY (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 A/R Y 65 Power Operation 0 Hot Shutdown
Event Text
AUTOMATIC REACTOR SCRAM DUE TO A MAIN TURBINE TRIP

"Following a downpower to 65% for maintenance on one of the reactor feedwater turbines, a main turbine digital electro-hydraulic (DEH) quadvoter valve, that had failed a previous surveillance, was replaced. During the operability testing of the new DEH quadvoter valve, a leak developed. DEH reservoir level dropped 8 inches (approx. 52 gal) and tripped the main turbine on low DEH pressure. An automatic reactor trip occurred due the main turbine trip. All rods fully inserted. RPV pressure was controlled using the bypass valves and main steam line drains. No SRV's opened. RPV level was maintained using the feedwater and condensate system in the normal RPV level band. All other safety systems operated as designed. Off-site power is available. Three emergency diesel generators are operable and available."

The licensee has notified the NRC Resident Inspector.


General Information or Other
Event Number: 44501
Rep Org: MA RADIATION CONTROL PROGRAM
Licensee: SECOND STREET IRON & METAL
Region: 1
City: EVERETT   State: MA
County:
License #:
Agreement: Y
Docket: 09-8006
NRC Notified By: J. THOMAS COULOMBIE
HQ OPS Officer: JOHN KNOKE
Notification Date: 09/18/2008
Notification Time: 15:45 [ET]
Event Date: 08/21/2008
Event Time: 13:15 [EDT]
Last Update Date: 09/18/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
ANTHONY DIMITRIADIS (R1)
CHRIS EINBERG (FSME)
Event Text
AGREEMENT STATE REPORT - REPORTABLE QUANITY OF RA-226 FOUND IN SCRAP YARD

"A shipment of ferrous scrap metal from a small scrap metal yard set off the radiation alarms at the entrance to the major regional scrap metal and exporting facility. It was immediately rejected, but the Agency (state of MA) was not notified for almost two hours. An Agency investigator responded and traced the shipment back to a smaller scrap yard across town. The operator of the facility had isolated the rejected shipment and was trying to locate their consultant. Upon surveying the roll-off, the Agency investigator tentatively identified the shipment as containing Radium. The background was recorded as 0.06 millirem/hour and the highest reading was measured as 0.1 millirem/hour.

"This company was advised to acquire the services of a competent health physics consultant to arrange for the separation, storage and legal disposition of the radioactive material; and this was agreed upon without hesitation. Their hired consultant responded to the facility on August 25, 2008; and after collecting a spectrum and necessary measurements for identification purposes, separated one metal device from the roll-off, packaged it in a five gallon drum and had the facility operators secure it on-site depending disposal arrangements. Subsequently, the consultant has confirmed the presence of 12 microcuries of Radium-226. Legal transfer and disposition of this radioactive material is pending."