Power Reactor
Event Number: 44157
Facility: PRAIRIE ISLAND
Region: 3     State: MN
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: BRIAN JOHNSON
HQ OPS Officer: JOHN KNOKE
Notification Date: 04/23/2008
Notification Time: 05:15 [ET]
Event Date: 04/23/2008
Event Time: 04:10 [CDT]
Last Update Date: 04/23/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
JAMNES CAMERON (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
TSC VENTILATION SYSTEM CONSIDERED NON-FUNCTIONAL

"At 0410 CDT on 4/23/08 the Technical Support Center (TSC) Ventilation System was removed from service for scheduled maintenance on the Technical Support Center (TSC) cleanup fan. Without adequate flow rates through the TSC cleanup filter, the TSC ventilation system is considered non-functional. Due to the extent of planned work, prompt restoration of the ventilation system will not be available. Contingency plans are in place to utilize the TSC as long as radiological conditions allow. Procedure F3-6, 'Activation and Operation of the TSC', Section 7.6, directs TSC management to relocate TSC activities to a radiological safe area if necessary. The TSC Ventilation system expected return to service is 1200 CDT 4/23/2008."

The licensee notified the NRC Resident Inspector.

* * * UPDATE FROM WAYNE EPPEN TO HOWIE CROUCH VIA TELECON AT 1538 EDT ON 4/23/08 * * *

The TSC ventilation system will remain out of service until approximately Friday, April 25, at 1500 CDT. This is due to unforeseen degradation of the ventilation fan motor.

The licensee will be notifying the NRC Resident Inspector. Notified R3DO (Jamnes Cameron)


Fuel Cycle Facility
Event Number: 44161
Facility: GLOBAL NUCLEAR FUEL - AMERICAS
Region: 2     State: NC
Unit: [] [] []
RX Type: URANIUM FUEL FABRICATION
Comments: LEU CONVERSION (UF6 TO UO2)
LEU FABRICATION
LWR COMMERICAL FUEL
NRC Notified By: PHILLIP OLLIS
HQ OPS Officer: BILL HUFFMAN
Notification Date: 04/23/2008
Notification Time: 15:46 [ET]
Event Date: 04/23/2008
Event Time: 10:00 [EDT]
Last Update Date: 04/23/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
PART 70 APP A (b)(5) - DEV FROM ISA
Person (Organization):
CHARLIE PAYNE (R2)
CHRISTOPHER REGAN (NMSS)
Event Text
NON CRITICAL-SAFE CONTAINER BROUGHT INTO SAFE STORE AREA

"A 35 quart mop bucket was brought into a safe store, cleaning area where clean up work is being done to decontaminate old, previously cleaned (safe store), equipment for removal from the facility. This mop bucket is unauthorized for use in this area.

"The mop bucket was removed from the area and a review of the facility is being conducted for the presence of additional unauthorized mop buckets.

"GNF is making this 24-hour report in accordance with 10 CFR 70, Appendix A, (b)(1) - Any event or condition that results in the facility being in a state that was not analyzed, was improperly analyzed, or is different from that analyzed in the Integrated Safety Analysis, and which results in failure to meet the performance requirements of § 70.61.

"There were no actual or potential safety consequences to workers, the public, or the environment.

"[The licensee considers this event is of] minor safety significance. No safety equipment impacted. Investigation of event and implementation of additional corrective actions pending."

The licensee plans to notify the State and NRC Regional Office.


Power Reactor
Event Number: 44162
Facility: CLINTON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: DAVID WELLS
HQ OPS Officer: BILL HUFFMAN
Notification Date: 04/23/2008
Notification Time: 16:03 [ET]
Event Date: 04/23/2008
Event Time: 12:08 [CDT]
Last Update Date: 04/23/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
JAMNES CAMERON (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 97 Power Operation 97 Power Operation
Event Text
OFFSITE ASSISTANCE REQUESTED DUE TO UTILITY POLE FIRE OUTSIDE THE PROTECTED AREA

"On April 23. 2008 at 1150, Clinton Power Station (CPS) Main Control Room received notification from a site employee that a utility pole on the 138 KV line North of the main parking lot was on fire. Ameren/IP was contacted.

"At 1155, Ameren/IP de-energized the 138kV line.

"Offsite assistance was requested from the Local Fire Department at time 1206.

"At time 1256, the offsite Fire Department extinguished the fire.

"Clinton Power Station remained online at full electrical load during the event and remains stable. Repairs are in progress, with an expected completion this evening.

"The NRC Resident Inspector has been informed."


Power Reactor
Event Number: 44163
Facility: HOPE CREEK
Region: 1     State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: TOM FOWLER
HQ OPS Officer: JOHN KNOKE
Notification Date: 04/24/2008
Notification Time: 03:15 [ET]
Event Date: 04/23/2008
Event Time: 23:58 [EDT]
Last Update Date: 04/24/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
JOHN WHITE (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
HYDRAZINE LEAK INTO STORM DRAIN

"At 2340 on 4/23/08 a leak was discovered on a house heating steam boiler that was secured and cooling down. The boiler had been secured at 1930 and there was no leakage noticed at that time. The leak was estimated at 2 gallons per minute. At 2358 it was discovered that this water had reached a storm drain on site. The water contained hydrazine at a concentration of 364 ppb. A 15 minute notification to the state of New Jersey was completed at 0012 in accordance with the plant's Event Classification Guide. Maintenance personnel called to the scene stopped the leak at 0019. Samples are in progress of the sites storm drain outfalls to determine the extent of the discharge. This report is made in accordance with RAL #11.8.2.a."

The licensee will notify local township. The licensee notified the NRC Resident Inspector.


General Information or Other
Event Number: 44177
Rep Org: LOUISIANA RADIATION PROTECTION DIV
Licensee: GLOBAL X-RAY & TESTING
Region: 4
City: OFFSHORE   State: LA
County:
License #: LA-0577-L01
Agreement: Y
Docket:
NRC Notified By: RICHARD PENROD
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 04/29/2008
Notification Time: 15:03 [ET]
Event Date: 04/23/2008
Event Time: 00:00 [CDT]
Last Update Date: 04/29/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
GREG PICK (R4)
RON ZELAC (FSME)
Event Text
AGREEMENT STATE REPORT - POTENTIAL OVEREXPOSURE

This incident was originally reported in Event Notification #44159 by the licensee due to the uncertainty of the location of the potential overexposure.

The State provided the following information via facsimile:

"On April 23 2008, [DELETED] (RSO) with Global X-Ray & Testing (GXT) reported an excessive exposure on an industrial radiographer's badge. Landauer contacted GXT and reported that a badge had a reading over 1000 rads. The radiographer in question was interviewed by [DELETED] and a LA Department of Environmental Quality inspector. The radiographer was very shocked to hear of the excessive exposure. He was asked if anything unusual occurred during the month. The radiographer did not think anyone exposed the badge intentionally. The radiographer did state that he could not find his badge one morning on a job that occurred on March 20 - 24, 2008. The radiographer had a physical and blood work performed. The physical included CBC and total Lymphocyte count. The blood work came back within normal limits. This incident is still under investigation by the Louisiana Department of Environmental Quality."

Louisiana Report: LA080008


Power Reactor
Event Number: 44278
Facility: RIVER BEND
Region: 4     State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: DAVID YOUNG
HQ OPS Officer: HOWIE CROUCH
Notification Date: 06/09/2008
Notification Time: 13:27 [ET]
Event Date: 04/23/2008
Event Time: 15:56 [CDT]
Last Update Date: 06/09/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
GEOFFREY MILLER (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
60-DAY OPTIONAL NOTIFICATION OF INVALID SPECIFIED SYSTEM ACTUATION

"On April 23, 2008, at 3:56 p.m. CDT, power was lost on the reactor protection system (RPS) bus 'B'. The plant was operating at 100 percent power at the time. The loss of RPS bus 'B' interrupted power to the containment isolation actuation circuitry. This caused the Division 2 containment isolation valves in various balance-of-plant systems to automatically close, as designed. Plant operators implemented recovery procedures to shift RPS 'B' to its alternate power supply, and restore the systems affected by the isolation to service. The containment isolation valves were confirmed to have actuated as required. Plant [generating] capacity was not interrupted by the containment isolation signal.

"The investigation of this event did not conclusively determine the cause of the loss of RPS bus 'B'. At the time of the event, scheduled maintenance was in progress to replace a relay which had contacts in the RPS 'B' circuitry. It is postulated that during this work, the technician inadvertently contacted part of the relay case while re-terminating the wiring, causing a short-circuit which blew a fuse in the circuit. This caused the output breaker on the RPS 'B' motor-generator set to trip, which de-energized the bus.

"This event is being reported in accordance with 10CFR50.73(a)(2)(iv)(A) as an invalid actuation of the Division 2 containment isolation actuation system."

The loss of RPS 'B' also caused a half-scram signal to be generated.

The licensee has notified the NRC Resident Inspector.