Event Number: 43976
Facility: CLINTON
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: MIKE REANDEAU
HQ OPS Officer: JEFF ROTTON
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: MIKE REANDEAU
HQ OPS Officer: JEFF ROTTON
Notification Date: 02/11/2008
Notification Time: 01:48 [ET]
Event Date: 02/10/2008
Event Time: 22:07 [CST]
Last Update Date: 02/13/2008
Notification Time: 01:48 [ET]
Event Date: 02/10/2008
Event Time: 22:07 [CST]
Last Update Date: 02/13/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
THOMAS KOZAK (R3)
THOMAS KOZAK (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 97 | Power Operation | 0 | Hot Shutdown |
MANUAL REACTOR SCRAM DUE TO INCREASING REACTOR VESSEL LEVEL
"On February 10, 2008, at approximately 2207 hours CST, the 'B' Reactor Recirculation pump tripped from fast speed to off. The resultant reactor pressure vessel level swell resulted in reactor pressure vessel level being greater than 48 inches and rising. Per Clinton Power Station operating procedures, the 'A' Reactor Operator placed the mode switch to the 'shutdown' position initiating a manual reactor scram. All control rods inserted [fully]. CPS is currently stable in Mode 3."
Decay heat is being removed to the main condenser via the turbine bypass valves. Reactor level is being maintained using the motor driven reactor feedpump. No SRVs lifted during the transient. Licensee is in progress of restoring the electrical plant to a normal shutdown lineup.
The licensee notified the NRC Resident Inspector.
* * * UPDATE AT 2226 ON 2/13/08 FROM M. EVANS TO P. SNYDER * * *
"After further analysis of the scram, it was determined that an automatic level 8, high reactor water level, scram occurred approximately one second prior to the reactor operator placing the mode switch to the 'shutdown' position."
The licensee notified the NRC Resident Inspector.
"On February 10, 2008, at approximately 2207 hours CST, the 'B' Reactor Recirculation pump tripped from fast speed to off. The resultant reactor pressure vessel level swell resulted in reactor pressure vessel level being greater than 48 inches and rising. Per Clinton Power Station operating procedures, the 'A' Reactor Operator placed the mode switch to the 'shutdown' position initiating a manual reactor scram. All control rods inserted [fully]. CPS is currently stable in Mode 3."
Decay heat is being removed to the main condenser via the turbine bypass valves. Reactor level is being maintained using the motor driven reactor feedpump. No SRVs lifted during the transient. Licensee is in progress of restoring the electrical plant to a normal shutdown lineup.
The licensee notified the NRC Resident Inspector.
* * * UPDATE AT 2226 ON 2/13/08 FROM M. EVANS TO P. SNYDER * * *
"After further analysis of the scram, it was determined that an automatic level 8, high reactor water level, scram occurred approximately one second prior to the reactor operator placing the mode switch to the 'shutdown' position."
The licensee notified the NRC Resident Inspector.