Event Notification Report for January 18, 2008
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
01/17/2008 - 01/18/2008
Power Reactor
Event Number: 43916
Facility: RIVER BEND
Region: 4 State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: GLENN KRAUSE
HQ OPS Officer: HOWIE CROUCH
Region: 4 State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: GLENN KRAUSE
HQ OPS Officer: HOWIE CROUCH
Notification Date: 01/18/2008
Notification Time: 11:53 [ET]
Event Date: 01/18/2008
Event Time: 10:15 [CST]
Last Update Date: 01/18/2008
Notification Time: 11:53 [ET]
Event Date: 01/18/2008
Event Time: 10:15 [CST]
Last Update Date: 01/18/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
BLAIR SPITZBERG (R4)
BLAIR SPITZBERG (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
OFFSITE NOTIFICATION OF TRITIUM IDENTIFIED IN WATER SAMPLES FROM PIPING LEAK
"This is a report of a situation, related to the protection of the environment, for which a notification to other government agencies is being made, as described in 10CFR50.72(b)(2)(xi).
"On January 17, 2008, at approximately 1300 hours, site environmental monitoring personnel at River Bend Station completed analysis which confirmed the presence of tritium in water samples taken from a piping leak that occurred on January 16, 2008, on plant property. The source of the tritium was from water that had been treated in the liquid radwaste system and was suitable for release. The Louisiana Department of Environmental Quality and other state and local officials are being notified in accordance with the voluntary NEI groundwater protection initiative.
"The following is a summary of the events that led up to the identification of tritium in the water sample.
"On January 16, 2008, at approximately 1750 hours with the plant shutdown in Mode 5 (Refueling), River Bend Station personnel identified a water leak from a cooling tower blowdown line. The design of this system takes water from the plant's cooling tower basin. This water mixes with treated water being discharged from the liquid radwaste system. The diluted blowdown is then discharged to the Mississippi River.
"Plant operators received a low blowdown line flow alarm and immediately terminated the discharge of water from the liquid radwaste system. The cooling tower blowdown pumps were also subsequently stopped. The leak was caused by a failure of the blowdown piping.
"The leak was located inside the owner controlled area near the plant's cooling towers. Based on the location of the leak, the water drained to a nearby storm drain and into East Creek (Outfall 3). East Creek exits the plant site and discharges to the Mississippi River. The volume of the spill as been estimated to be less than 720 gallons of water from the radwaste system. This water had been treated and was suitable for release. Additional clean water from the cooling tower basin mixed with the water from the liquid radwaste system and was released. The analysis of a water sample, taken at the discharge point to East Creek determined that the samples contained 28,042 Pico Curies per liter (pCi/I) tritium. The NRC reporting level for a non-drinking water pathway is 30,000 pCi/I. Samples taken directly at the location of the leak contained 129,456 pCi/I tritium. The release has no potential to impact the health and safety of the public. RBS personnel are investigating the cause of the leak and will not restore blowdown until action is taken to prevent further occurrence."
The licensee has notified the NRC Resident Inspector.
"This is a report of a situation, related to the protection of the environment, for which a notification to other government agencies is being made, as described in 10CFR50.72(b)(2)(xi).
"On January 17, 2008, at approximately 1300 hours, site environmental monitoring personnel at River Bend Station completed analysis which confirmed the presence of tritium in water samples taken from a piping leak that occurred on January 16, 2008, on plant property. The source of the tritium was from water that had been treated in the liquid radwaste system and was suitable for release. The Louisiana Department of Environmental Quality and other state and local officials are being notified in accordance with the voluntary NEI groundwater protection initiative.
"The following is a summary of the events that led up to the identification of tritium in the water sample.
"On January 16, 2008, at approximately 1750 hours with the plant shutdown in Mode 5 (Refueling), River Bend Station personnel identified a water leak from a cooling tower blowdown line. The design of this system takes water from the plant's cooling tower basin. This water mixes with treated water being discharged from the liquid radwaste system. The diluted blowdown is then discharged to the Mississippi River.
"Plant operators received a low blowdown line flow alarm and immediately terminated the discharge of water from the liquid radwaste system. The cooling tower blowdown pumps were also subsequently stopped. The leak was caused by a failure of the blowdown piping.
"The leak was located inside the owner controlled area near the plant's cooling towers. Based on the location of the leak, the water drained to a nearby storm drain and into East Creek (Outfall 3). East Creek exits the plant site and discharges to the Mississippi River. The volume of the spill as been estimated to be less than 720 gallons of water from the radwaste system. This water had been treated and was suitable for release. Additional clean water from the cooling tower basin mixed with the water from the liquid radwaste system and was released. The analysis of a water sample, taken at the discharge point to East Creek determined that the samples contained 28,042 Pico Curies per liter (pCi/I) tritium. The NRC reporting level for a non-drinking water pathway is 30,000 pCi/I. Samples taken directly at the location of the leak contained 129,456 pCi/I tritium. The release has no potential to impact the health and safety of the public. RBS personnel are investigating the cause of the leak and will not restore blowdown until action is taken to prevent further occurrence."
The licensee has notified the NRC Resident Inspector.
Power Reactor
Event Number: 43918
Facility: SUSQUEHANNA
Region: 1 State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: TODD CREASY
HQ OPS Officer: HOWIE CROUCH
Region: 1 State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: TODD CREASY
HQ OPS Officer: HOWIE CROUCH
Notification Date: 01/18/2008
Notification Time: 17:54 [ET]
Event Date: 01/18/2008
Event Time: 17:03 [EST]
Last Update Date: 01/18/2008
Notification Time: 17:54 [ET]
Event Date: 01/18/2008
Event Time: 17:03 [EST]
Last Update Date: 01/18/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION 20.1906(d)(2) - EXTERNAL RAD LEVELS > LIMITS
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION 20.1906(d)(2) - EXTERNAL RAD LEVELS > LIMITS
Person (Organization):
EUGENE COBEY (R1)
KEITH McCONNELL (FSME)
EUGENE COBEY (R1)
KEITH McCONNELL (FSME)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
OFFSITE NOTIFICATION DUE TO RECEIPT OF PACKAGE THAT EXCEEDED ALLOWABLE CONTACT DOSE RATE
"At 1703 EST on 1/18/2008, Susquehanna LLC personnel became aware that a shipment received from GE Hitachi Nuclear Energy exceeded the allowable limit of 200 mr/hr contact dose rate. The external radiation limit of 200 mrem/hr was exceeded on one of the two boxes comprising the shipment. The limit per NDAP-QA-0648 is 200 mrem/hr on contact for a shipment type for a transport vehicle which is not designated exclusive use. The actual value was determined to be 350 mrem/hr, therefore reportable per the requirements of 10CFR20.1906(d)(2).
"The NRC Resident Inspector and the Shipper (GE Hitachi Nuclear Energy) were notified. The transport vehicle left Wilmington NC on 1/17/2008 at 1435 and was received by SSES [Susquehanna Steam Electric Station] on 1/18/2008 at 0800. There was no surface contamination noted on the shipment. The original survey completed prior to shipment noted the highest on contact dose rate was 170 mr/hr.
"This item is reportable under 50.72(b)(2)(xi) for offsite notification of an event of public interest."
The boxes contained various pieces of equipment that GE uses to support refueling.
The licensee has notified the NRC Resident Inspector and will be notifying the Pennsylvania Emergency Management Agency.
"At 1703 EST on 1/18/2008, Susquehanna LLC personnel became aware that a shipment received from GE Hitachi Nuclear Energy exceeded the allowable limit of 200 mr/hr contact dose rate. The external radiation limit of 200 mrem/hr was exceeded on one of the two boxes comprising the shipment. The limit per NDAP-QA-0648 is 200 mrem/hr on contact for a shipment type for a transport vehicle which is not designated exclusive use. The actual value was determined to be 350 mrem/hr, therefore reportable per the requirements of 10CFR20.1906(d)(2).
"The NRC Resident Inspector and the Shipper (GE Hitachi Nuclear Energy) were notified. The transport vehicle left Wilmington NC on 1/17/2008 at 1435 and was received by SSES [Susquehanna Steam Electric Station] on 1/18/2008 at 0800. There was no surface contamination noted on the shipment. The original survey completed prior to shipment noted the highest on contact dose rate was 170 mr/hr.
"This item is reportable under 50.72(b)(2)(xi) for offsite notification of an event of public interest."
The boxes contained various pieces of equipment that GE uses to support refueling.
The licensee has notified the NRC Resident Inspector and will be notifying the Pennsylvania Emergency Management Agency.
Power Reactor
Event Number: 43919
Facility: TURKEY POINT
Region: 2 State: FL
Unit: [3] [] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: DAVID FUNK
HQ OPS Officer: HOWIE CROUCH
Region: 2 State: FL
Unit: [3] [] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: DAVID FUNK
HQ OPS Officer: HOWIE CROUCH
Notification Date: 01/18/2008
Notification Time: 18:44 [ET]
Event Date: 01/18/2008
Event Time: 17:44 [EST]
Last Update Date: 01/18/2008
Notification Time: 18:44 [ET]
Event Date: 01/18/2008
Event Time: 17:44 [EST]
Last Update Date: 01/18/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
Person (Organization):
JAMES MOORMAN (R2)
JAMES MOORMAN (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | Y | 100 | Power Operation | 99 | Power Operation |
TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO TWO INOPERABLE ROD POSITION INDICATORS IN THE SAME ROD GROUP
"At 1744 [EST] on 1/18/08, [the licensee] entered Technical Specification (TS) 3.0.3 on Unit 3 due to observed Rod Position lndicator (RPI) F-14 dropping from 228 steps to 135-145 steps and behaving erratically. This RPI is in the same bank as currently inoperable RPI F-2. TS 3.1.3.2 has actions for a maximum of one RPI per bank inoperable. Since there are two inoperable in one bank, an entry into TS 3.0.3 is required.
"Power reduction [was] initiated at 1835 [hrs.].
"Repairs [are] currently in progress [and the licensee] anticipate[s] correction prior to completion of power reduction."
If the RPI is not corrected, the licensee will be required to be in Mode 3 by 0044 hrs. EST on 01/19/08. This is an ongoing issue. See Event Notifications 43896 and 43888.
The licensee has notified the NRC Resident Inspector.
* * * UPDATE PROVIDED BY DAVE FUNK TO JASON KOZAL AT 2041 0N 1/18/07 * * *
"Repairs are complete. RPI F-14 has been restored to service on Unit 3, exited Technical Specification 3.0.3 at 2027. Return to 100% power on Unit 3 [is] in progress."
The licensee will notify the NRC Resident Inspector.
Notified R2DO (Moorman).
"At 1744 [EST] on 1/18/08, [the licensee] entered Technical Specification (TS) 3.0.3 on Unit 3 due to observed Rod Position lndicator (RPI) F-14 dropping from 228 steps to 135-145 steps and behaving erratically. This RPI is in the same bank as currently inoperable RPI F-2. TS 3.1.3.2 has actions for a maximum of one RPI per bank inoperable. Since there are two inoperable in one bank, an entry into TS 3.0.3 is required.
"Power reduction [was] initiated at 1835 [hrs.].
"Repairs [are] currently in progress [and the licensee] anticipate[s] correction prior to completion of power reduction."
If the RPI is not corrected, the licensee will be required to be in Mode 3 by 0044 hrs. EST on 01/19/08. This is an ongoing issue. See Event Notifications 43896 and 43888.
The licensee has notified the NRC Resident Inspector.
* * * UPDATE PROVIDED BY DAVE FUNK TO JASON KOZAL AT 2041 0N 1/18/07 * * *
"Repairs are complete. RPI F-14 has been restored to service on Unit 3, exited Technical Specification 3.0.3 at 2027. Return to 100% power on Unit 3 [is] in progress."
The licensee will notify the NRC Resident Inspector.
Notified R2DO (Moorman).