Power Reactor
Event Number: 43863
Facility: SAINT LUCIE
Region: 2 State: FL
Unit: [] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: DAVE FIELDS
HQ OPS Officer: JEFF ROTTON
Region: 2 State: FL
Unit: [] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: DAVE FIELDS
HQ OPS Officer: JEFF ROTTON
Notification Date: 12/21/2007
Notification Time: 16:57 [ET]
Event Date: 12/21/2007
Event Time: 14:45 [EST]
Last Update Date: 12/21/2007
Notification Time: 16:57 [ET]
Event Date: 12/21/2007
Event Time: 14:45 [EST]
Last Update Date: 12/21/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
Person (Organization):
SCOTT SHAEFFER (R2)
SCOTT SHAEFFER (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Hot Standby | 0 | Hot Standby |
RCS PRESSURE BOUNDARY LEAKAGE ON RCP SEAL INJECTION LINE
"With unit shut down in Mode 3 with all CEAs inserted preparing for startup, RCS Pressure Boundary leakage was identified. Leakage appears to be from a weld to Reactor Coolant Pump Seal Injection Line. Leakage is much less than one gallon per minute. Implementing Technical Specification LCO 3.4.6.2 Reactor Coolant System Operational Leakage Action (a) to place the unit in Cold Shutdown within the following 30 hours. Commencing plant cooldown for repair."
The licensee notified the NRC Resident Inspector.
"With unit shut down in Mode 3 with all CEAs inserted preparing for startup, RCS Pressure Boundary leakage was identified. Leakage appears to be from a weld to Reactor Coolant Pump Seal Injection Line. Leakage is much less than one gallon per minute. Implementing Technical Specification LCO 3.4.6.2 Reactor Coolant System Operational Leakage Action (a) to place the unit in Cold Shutdown within the following 30 hours. Commencing plant cooldown for repair."
The licensee notified the NRC Resident Inspector.
Power Reactor
Event Number: 43859
Facility: PRAIRIE ISLAND
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: MARK LOOSBROCK
HQ OPS Officer: JOE O'HARA
Region: 3 State: MN
Unit: [1] [] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: MARK LOOSBROCK
HQ OPS Officer: JOE O'HARA
Notification Date: 12/21/2007
Notification Time: 07:14 [ET]
Event Date: 12/21/2007
Event Time: 04:13 [CST]
Last Update Date: 12/21/2007
Notification Time: 07:14 [ET]
Event Date: 12/21/2007
Event Time: 04:13 [CST]
Last Update Date: 12/21/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
Person (Organization):
ERIC DUNCAN (R3)
JERRY DOZIER (NRR)
BRIAN MCDERMOTT (IRD)
ERIC DUNCAN (R3)
JERRY DOZIER (NRR)
BRIAN MCDERMOTT (IRD)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 35 | Power Operation |
TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO BOTH EDG'S BEING DECLARED INOPERABLE
"This notification is being made to report a Technical Specification required shutdown due to Prairie Island Nuclear Generating Plant (PINGP) Train B Unit 1 emergency diesel generator (D2) being out of service for maintenance and Prairie Island Nuclear Generating Plant (PINGP) Train A Unit 1 emergency diesel generator (D1) being declared inoperable as a result of the Bus 15 load sequencer failure.
"On 12/20/07, at approximately 2355 hours (CST), with PINGP Unit 1 in MODE 1, D2 out of service for maintenance activities, SP 1306, D2 Diesel Generator Relay Functional Test, was being performed. This surveillance test requires the performance of SP 1094; Bus 15 Load Sequencer Test which failed during the test. This resulted in the Bus 15 Load Sequencer being declared inoperable per T.S. 3.3.4 and D1 Diesel Generator being declared inoperable. With D2 and D1 EDG's inoperable entered TS 3.8.1.F which requires Unit 1 to be in Mode 3 within 6 hours. Unit 1 shutdown commenced at 0413.
"Corrective actions for this event are in progress and are being tracked via the corrective action program."
The NRC Resident Inspector was notified of this event by the licensee.
"This notification is being made to report a Technical Specification required shutdown due to Prairie Island Nuclear Generating Plant (PINGP) Train B Unit 1 emergency diesel generator (D2) being out of service for maintenance and Prairie Island Nuclear Generating Plant (PINGP) Train A Unit 1 emergency diesel generator (D1) being declared inoperable as a result of the Bus 15 load sequencer failure.
"On 12/20/07, at approximately 2355 hours (CST), with PINGP Unit 1 in MODE 1, D2 out of service for maintenance activities, SP 1306, D2 Diesel Generator Relay Functional Test, was being performed. This surveillance test requires the performance of SP 1094; Bus 15 Load Sequencer Test which failed during the test. This resulted in the Bus 15 Load Sequencer being declared inoperable per T.S. 3.3.4 and D1 Diesel Generator being declared inoperable. With D2 and D1 EDG's inoperable entered TS 3.8.1.F which requires Unit 1 to be in Mode 3 within 6 hours. Unit 1 shutdown commenced at 0413.
"Corrective actions for this event are in progress and are being tracked via the corrective action program."
The NRC Resident Inspector was notified of this event by the licensee.
Power Reactor
Event Number: 43860
Facility: PERRY
Region: 3 State: OH
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: ROBERT KIDDER
HQ OPS Officer: MARK ABRAMOVITZ
Region: 3 State: OH
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: ROBERT KIDDER
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 12/21/2007
Notification Time: 12:31 [ET]
Event Date: 12/21/2007
Event Time: 08:25 [EST]
Last Update Date: 12/21/2007
Notification Time: 12:31 [ET]
Event Date: 12/21/2007
Event Time: 08:25 [EST]
Last Update Date: 12/21/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
ERIC DUNCAN (R3)
ERIC DUNCAN (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
SECONDARY CONTAINMENT BYPASSED FOR SHORT PERIOD
"Annulus Exhaust Gas Treatment System (AEGTS) 'A' was removed from service (INOPERABLE) to obtain a charcoal sample. AECTS 'B' Train was the OPERABLE Train. At 0825 hours, the charcoal plenum for the 'A' train was opened to obtain a charcoal sample resulting in alarms for AECTS 'B' low flow and Annulus low differential pressure. Based on this indication AEGTS 'B' and secondary containment were INOPERABLE. AEGTS 'B' flow was restored to normal following closure of the charcoal plenum and annulus differential pressure was restored to normal at 0833 hours, restoring secondary containment.
"AEGTS 'B' was declared operable at 0845 hours. Early indication is that a discharge damper in the AEGTS 'A' train had not operated properly. This condition was determined to be reportable in accordance with 10 CFR 50.72(b)(3)(V)(C) and (D), as condition that could have prevented the safety function of structures or systems that are needed to: (C) Control the release of radioactive material; or (D) Mitigate the Consequences of an accident."
The licensee notified the NRC Resident Inspector.
"Annulus Exhaust Gas Treatment System (AEGTS) 'A' was removed from service (INOPERABLE) to obtain a charcoal sample. AECTS 'B' Train was the OPERABLE Train. At 0825 hours, the charcoal plenum for the 'A' train was opened to obtain a charcoal sample resulting in alarms for AECTS 'B' low flow and Annulus low differential pressure. Based on this indication AEGTS 'B' and secondary containment were INOPERABLE. AEGTS 'B' flow was restored to normal following closure of the charcoal plenum and annulus differential pressure was restored to normal at 0833 hours, restoring secondary containment.
"AEGTS 'B' was declared operable at 0845 hours. Early indication is that a discharge damper in the AEGTS 'A' train had not operated properly. This condition was determined to be reportable in accordance with 10 CFR 50.72(b)(3)(V)(C) and (D), as condition that could have prevented the safety function of structures or systems that are needed to: (C) Control the release of radioactive material; or (D) Mitigate the Consequences of an accident."
The licensee notified the NRC Resident Inspector.