Skip to main content

Event Notification Report for November 07, 2007

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
11/06/2007 - 11/07/2007

EVENT NUMBERS
4434143773

General Information or Other
Event Number: 44341
Rep Org: CALIFORNIA RADIATION CONTROL PRGM
Licensee: GEO ENVIRON
Region: 4
City: ANAHEIM   State: CA
County:
License #: 6636-30
Agreement: Y
Docket:
NRC Notified By: BARBARA HAMRICK
HQ OPS Officer: JOHN KNOKE
Notification Date: 07/10/2008
Notification Time: 15:44 [ET]
Event Date: 11/07/2007
Event Time: 00:00 [PDT]
Last Update Date: 07/10/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
MICHAEL HAY (R4)
ROBERT LEWIS (FSME)
Event Text
AGREEMENT STATE REPORT - DAMAGED TROXLER GAUGE

Received report via email:

"On November 8, 2007, the licensee left a voice-mail message stating a moisture density gauge (Troxler Model 3430, S/N 29865), with a nominal 8 mCi of Cs-137 and 40 mCi of Am-241, had been run over the night before at a construction site. The cesium source was originally reported to be locked in its shielded position, although it was later discovered that the source was shielded, but not lockable. The electronics were severely damaged. While the gauge was being used at the construction site, the user stepped away, and the gauge was run over by a piece of heavy machinery."

California Event # 110807


Power Reactor
Event Number: 43773
Facility: RIVER BEND
Region: 4     State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: GARY HUSTON
HQ OPS Officer: JOE O'HARA
Notification Date: 11/07/2007
Notification Time: 07:58 [ET]
Event Date: 11/07/2007
Event Time: 03:06 [CST]
Last Update Date: 11/07/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(A) - ECCS INJECTION 50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
BLAIR SPITZBERG (R4)
MJ ROSS-LEE (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 75 Power Operation 0 Hot Shutdown
Event Text
REACTOR SCRAM AS A RESULT OF LOSS OF NORMAL POWER 13.8 KV BUS

"With the plant in Mode 1 at [approximately] 75% power, the Auxiliary boiler and water treatment building 480 volt switchgear (NJS-SWG1J) faulted. The fault resulted in the loss of the NPS A bus (13.8 Kv normal supply), causing condensate and feed pumps to trip. Operators in the control room immediately responded and the plant was manually scrammed at 0306. Both the high pressure core spray (HPCS) and the reactor core isolation cooling (RCIC) systems responded automatically and injected into the vessel (valid ECCS signal). Safety systems responded as expected, including level 2 isolations."

The licensee believes a transformer fault may have transferred up the line and caused the loss of normal power supply.

RCIC is controlling reactor water level with primary plant pressure approximately 325 psia. Decay heat is being controlled through modulating the SRV's. The licensee has all systems available to place the unit in safe shutdown and cooldown. The licensee has one inoperable EDG and is not in any technical specification action statement at this time.

The licensee notified the NRC Resident Inspector.

* * * UPDATE AT 2214 ON 11/7/2007 FROM BRYAN KELLEY TO MARK ABRAMOVITZ * * *

"The high pressure core spray system was returned to its standby lineup at 0318 (all times are CST). Standby service water was being placed in service at 0701 to raise service water header pressure when standby service water pump 'C' started automatically. NPS 13.8kv switchgear 'A' was restored to service at 1245. The reactor core isolation cooling system, which automatically started at the time of the event, was shutdown at 1645. The Division 3 diesel generator, which automatically started at the time of the event, was restored to its standby lineup at 1429. Shutdown cooling was placed in service with residual heat removal pump 'A', at 1626. The plant entered Mode 4 (cold shutdown) at 1942.

"The electrical fault that initiated the event has been isolated to a 13.8kv/480v transformer in the turbine building. An investigation is ongoing."

The licensee notified the NRC Resident Inspector.

Notified the R4DO (Spitzberg) and NRR (Lubinski).