Event Notification Report for October 06, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/05/2007 - 10/06/2007
EVENT NUMBERS
43697
Power Reactor
Event Number: 43697
Facility: PALO VERDE
Region: 4 State: AZ
Unit: [] [2] []
RX Type: [1] CE,[2] CE,[3] CE
NRC Notified By: JOHN ARONSON
HQ OPS Officer: PETE SNYDER
Region: 4 State: AZ
Unit: [] [2] []
RX Type: [1] CE,[2] CE,[3] CE
NRC Notified By: JOHN ARONSON
HQ OPS Officer: PETE SNYDER
Notification Date: 10/06/2007
Notification Time: 15:32 [ET]
Event Date: 10/06/2007
Event Time: 10:59 [MST]
Last Update Date: 10/06/2007
Notification Time: 15:32 [ET]
Event Date: 10/06/2007
Event Time: 10:59 [MST]
Last Update Date: 10/06/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
WILLIAM JONES (R4)
WILLIAM JONES (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | M/R | Y | 100 | Power Operation | 0 | Hot Standby |
MANUAL REACTOR TRIP DUE TO CONDENSER TUBE RUPTURE
"The following event description is based on information currently available. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS or under the reporting requirements of 10CFR50.73.
"On October 6, 2007, at approximately 10:59 Mountain Standard Time (MST) Palo Verde Unit 2 plant operators manually tripped the reactor from approximately 100% rated thermal power. The reactor was tripped when sodium levels in both steam generators reached trip criteria following a condenser tube rupture. Unit 2 was at normal temperature and pressure prior to the trip. All CEAs inserted fully into the reactor core. This was an uncomplicated reactor trip.
"No ESF actuations occurred and none were required. Safety related buses remained energized during and following the reactor trip. The offsite power grid is stable. No significant LCOs have been entered as a result of this event. There was no loss of normal heat removal capabilities, or loss of any safety functions associated with this event. No major equipment was inoperable prior to the event that contributed to the event. "
No PORVs or MSSVs lifted. Decay heat is being removed with Auxiliary Feedwater feeding the steam generators steaming to the condenser. There are no primary to secondary tube leaks in the steam generators. Emergency buses are powered by offsite power with Emergency Diesel Generators in standby.
"The event did not result in any challenges to fission product barriers and there were no adverse safety consequences as a result of this event. The event did not adversely affect the safe operation of the plant or the health and safety of the public.
"The [NRC] Resident Inspector was informed of the Unit 2 reactor trip and this notification."
"The following event description is based on information currently available. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS or under the reporting requirements of 10CFR50.73.
"On October 6, 2007, at approximately 10:59 Mountain Standard Time (MST) Palo Verde Unit 2 plant operators manually tripped the reactor from approximately 100% rated thermal power. The reactor was tripped when sodium levels in both steam generators reached trip criteria following a condenser tube rupture. Unit 2 was at normal temperature and pressure prior to the trip. All CEAs inserted fully into the reactor core. This was an uncomplicated reactor trip.
"No ESF actuations occurred and none were required. Safety related buses remained energized during and following the reactor trip. The offsite power grid is stable. No significant LCOs have been entered as a result of this event. There was no loss of normal heat removal capabilities, or loss of any safety functions associated with this event. No major equipment was inoperable prior to the event that contributed to the event. "
No PORVs or MSSVs lifted. Decay heat is being removed with Auxiliary Feedwater feeding the steam generators steaming to the condenser. There are no primary to secondary tube leaks in the steam generators. Emergency buses are powered by offsite power with Emergency Diesel Generators in standby.
"The event did not result in any challenges to fission product barriers and there were no adverse safety consequences as a result of this event. The event did not adversely affect the safe operation of the plant or the health and safety of the public.
"The [NRC] Resident Inspector was informed of the Unit 2 reactor trip and this notification."