Event Notification Report for September 30, 2007

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
09/29/2007 - 09/30/2007

EVENT NUMBERS
43677

Power Reactor
Event Number: 43677
Facility: DIABLO CANYON
Region: 4     State: CA
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: JAN NIMICK
HQ OPS Officer: JOHN MacKINNON
Notification Date: 10/01/2007
Notification Time: 00:57 [ET]
Event Date: 09/30/2007
Event Time: 19:58 [PDT]
Last Update Date: 10/02/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
CLAUDE JOHNSON (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
UNEXPECTED AUTOMATIC START OF THE 2-1 EMERGENCY DIESEL GENERATOR (EDG)

"A problem with voltage sensing circuit for 4 KV Bus G Startup power supply caused Diesel Generator 2-1 to automatically start. Loss of Startup voltage to a vital bus is an automatic start signal for the associated diesel generator. Startup power has been declared inoperable to 4 KV Bus G. All indications for Startup power to the other 2 vital busses remain normal. All systems functioned correctly in response to the sensed undervoltage condition. Unit 2 is in a 72 hour shutdown action statement per T. S. 3.8.1. An automatic start of a Diesel Generator is reportable per 10CFR50.72(B)(1)(iv)(A). The Diesel Generator has been shutdown per the annunciator response procedure and remains operable."

One of the four undervoltage relay starting power fuses for EDG 2-1 was found blown.

The NRC Resident Inspector was notified of this event by the licensee.

* * * UPDATE ON 10/2/07 AT 1947 FROM KEN JOHNSTON TO MARK ABRAMOVITZ * * *

This update is changing the reporting criteria from a valid system actuation 8-hour report to a invalid specified system actuation 60-day report.

"This 60-day notification is being made in accordance with 10 CFR 50.73(a)(i), which states that in case of an invalid actuation reported under 10 CFR 50.73(a)(2)(iv)(A), other than the actuation of the Reactor Protection System when the reactor is critical, the licensee may provide a telephone notification to the NRC within 60 days after discovery of the event instead of submitting a written Licensee Event Report.

"On September 30, 2007, at 19:58 PDT, EDG 2-1 automatically started, but did not load, due to a failed power supply fuse to an undervoltage sensing relay. EDG 2-1 was shutdown and placed in standby with the undervoltage sensing relay isolated from service. No actual undervoltage condition existed. EDG 2-2 and 2-3 were unaffected by this event. The affected sensing relay circuit was successfully completed. On October 1, 2007, at 18:09 PDT, TS 3.8.1 was exited.

"The consequences of this event are limited to the unplanned start of EDG 2-1. The EDG started and functioned in accordance with its design. Since no actual vital bus undervoltage condition existed which required the EDG to start, and since the start occurred inadvertently as a result a single component failure, this event has been classified as an invalid actuation. The original 8-hour notification made under 50.72(b)(3)(iv)(A) is therefore retracted and replaced by this 60-day telephone notification."

The licensee notified the NRC Resident Inspector. Notified the R4DO (Nease).