Event Notification Report for September 26, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
09/25/2007 - 09/26/2007
Power Reactor
Event Number: 43667
Facility: PILGRIM
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: JOHN WHALEY
HQ OPS Officer: JASON KOZAL
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: JOHN WHALEY
HQ OPS Officer: JASON KOZAL
Notification Date: 09/26/2007
Notification Time: 18:04 [ET]
Event Date: 09/26/2007
Event Time: 14:55 [EDT]
Last Update Date: 09/26/2007
Notification Time: 18:04 [ET]
Event Date: 09/26/2007
Event Time: 14:55 [EDT]
Last Update Date: 09/26/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
MEL GRAY (R1)
MEL GRAY (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
TECHNICAL SUPPORT CENTER AND OPERATIONS SUPPORT CENTER VENTILATION INOPERABLE
"At 1455 on September 26, 2007 investigatory surveillance testing identified that the emergency ventilation system designed to be manually initiated upon facility activation to maintain the Technical Support Center (TSC) and Operations Support Center (OSC) at positive pressure was not functioning properly. The emergency fan motor operated discharge dampers were not fully opening preventing the ability to achieve rated system flow and therefore design positive pressure. Maintenance is currently in progress to restore the degraded dampers/damper controls. Pilgrim is also investigating a temporary modification that would allow manual damper alignment to support achieving design positive pressure. Responsible Pilgrim Emergency Response Organization (ERO) personnel have been notified of this condition. The alternate technical and operations support facilities remain fully functional."
The licensee notified the NRC Resident Inspector. The licensee will notify the State of Massachusetts.
"At 1455 on September 26, 2007 investigatory surveillance testing identified that the emergency ventilation system designed to be manually initiated upon facility activation to maintain the Technical Support Center (TSC) and Operations Support Center (OSC) at positive pressure was not functioning properly. The emergency fan motor operated discharge dampers were not fully opening preventing the ability to achieve rated system flow and therefore design positive pressure. Maintenance is currently in progress to restore the degraded dampers/damper controls. Pilgrim is also investigating a temporary modification that would allow manual damper alignment to support achieving design positive pressure. Responsible Pilgrim Emergency Response Organization (ERO) personnel have been notified of this condition. The alternate technical and operations support facilities remain fully functional."
The licensee notified the NRC Resident Inspector. The licensee will notify the State of Massachusetts.
Power Reactor
Event Number: 43668
Facility: RIVER BEND
Region: 4 State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: GARY HUSTON
HQ OPS Officer: JOE O'HARA
Region: 4 State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: GARY HUSTON
HQ OPS Officer: JOE O'HARA
Notification Date: 09/27/2007
Notification Time: 03:48 [ET]
Event Date: 09/26/2007
Event Time: 22:44 [CDT]
Last Update Date: 09/27/2007
Notification Time: 03:48 [ET]
Event Date: 09/26/2007
Event Time: 22:44 [CDT]
Last Update Date: 09/27/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
CLAUDE JOHNSON (R4)
CLAUDE JOHNSON (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 100 | Power Operation | 0 | Hot Shutdown |
AUTOMATIC REACTOR SCRAM DURING THE PERFORMANCE OF APRM SURVEILLANCE TESTING
"At approximately 2244 on September 26, 2007 an unplanned reactor scram occurred. An Average Power Range Monitor (APRM) surveillance was being performed at the time. This surveillance should not have caused a full scram and the cause of the scram is under investigation. The plant responded to the scram as expected, all control rods fully inserted, and there is no need for emergency injection system operation. Critical parameters are being maintained within prescribed bands and the plant has been stabilized. A level 3 signal was received during this scram which would have caused an isolation but all affected valves were already in the closed position.
"This event is being reported in accordance with 10CFR50.72(b)(2)(iv)(B) as an event that results in activation of the reactor protection system with the reactor critical."
All emergency systems are available and in standby mode.
The licensee notified the NRC Resident Inspector.
"At approximately 2244 on September 26, 2007 an unplanned reactor scram occurred. An Average Power Range Monitor (APRM) surveillance was being performed at the time. This surveillance should not have caused a full scram and the cause of the scram is under investigation. The plant responded to the scram as expected, all control rods fully inserted, and there is no need for emergency injection system operation. Critical parameters are being maintained within prescribed bands and the plant has been stabilized. A level 3 signal was received during this scram which would have caused an isolation but all affected valves were already in the closed position.
"This event is being reported in accordance with 10CFR50.72(b)(2)(iv)(B) as an event that results in activation of the reactor protection system with the reactor critical."
All emergency systems are available and in standby mode.
The licensee notified the NRC Resident Inspector.
Power Reactor
Event Number: 43664
Facility: BROWNS FERRY
Region: 2 State: AL
Unit: [1] [2] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: RAY SWAFFORD
HQ OPS Officer: JOHN KNOKE
Region: 2 State: AL
Unit: [1] [2] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: RAY SWAFFORD
HQ OPS Officer: JOHN KNOKE
Notification Date: 09/26/2007
Notification Time: 11:37 [ET]
Event Date: 09/26/2007
Event Time: 06:50 [CDT]
Last Update Date: 09/26/2007
Notification Time: 11:37 [ET]
Event Date: 09/26/2007
Event Time: 06:50 [CDT]
Last Update Date: 09/26/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
MALCOLM WIDMANN (R2)
MALCOLM WIDMANN (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | N | 0 | Cold Shutdown | 0 | Cold Shutdown |
OIL SHEEN IN FOREBAY AREA THAT IS NOT FROM BFN
At 0650, 09/26/2007, BFN [Brown Ferry Nuclear] was notified by Site Environmental Organization that there is an oil sheen in the forebay that appears to be coming in from the river. Operations responded per site procedure RW1-007, Spill Prevention Control and Countermeasure Plan. Environmental and Fire Operations also responded to the scene.
The following organizations have been notified: TVA Operations Duty Specialist, National Response Center (event #849942), Alabama Dept. of Environmental Management (Montgomery and Decatur, AL), and Corporate TVA Environmental (TVA Env. Event #1500). Site NRC Residents have been notified. The spill has been estimated to be between 50 to 100 gallons located outside the BPN Intake Structure with a sheen on the inside of the intake. The sheen has been contained to prevent entry into plant operating spaces. TVA Muscle Shoals Response Team is in route to perform cleanup. It has been verified this spill is not coming from BFN.
This event is reportable to the NRC via ENS as a 4 hour report under 10CFR50.72(b)(2)(xi), as 'Any event or situation, related to the health and safety of the public or on-site personnel, or protection of the environment, for which a news release is planned or notifications to other government agencies has been or will be made.'"
The licensee notified the NRC Resident Inspector.
At 0650, 09/26/2007, BFN [Brown Ferry Nuclear] was notified by Site Environmental Organization that there is an oil sheen in the forebay that appears to be coming in from the river. Operations responded per site procedure RW1-007, Spill Prevention Control and Countermeasure Plan. Environmental and Fire Operations also responded to the scene.
The following organizations have been notified: TVA Operations Duty Specialist, National Response Center (event #849942), Alabama Dept. of Environmental Management (Montgomery and Decatur, AL), and Corporate TVA Environmental (TVA Env. Event #1500). Site NRC Residents have been notified. The spill has been estimated to be between 50 to 100 gallons located outside the BPN Intake Structure with a sheen on the inside of the intake. The sheen has been contained to prevent entry into plant operating spaces. TVA Muscle Shoals Response Team is in route to perform cleanup. It has been verified this spill is not coming from BFN.
This event is reportable to the NRC via ENS as a 4 hour report under 10CFR50.72(b)(2)(xi), as 'Any event or situation, related to the health and safety of the public or on-site personnel, or protection of the environment, for which a news release is planned or notifications to other government agencies has been or will be made.'"
The licensee notified the NRC Resident Inspector.