Event Notification Report for September 14, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
09/13/2007 - 09/14/2007
General Information or Other
Event Number: 43644
Rep Org: TEXAS DEPARTMENT OF HEALTH
Licensee: METCO
Region: 4
City: HOUSTON State: TX
County:
License #: TX-L030181926
Agreement: Y
Docket:
NRC Notified By: RAY JISHA
HQ OPS Officer: STEVE SANDIN
Licensee: METCO
Region: 4
City: HOUSTON State: TX
County:
License #: TX-L030181926
Agreement: Y
Docket:
NRC Notified By: RAY JISHA
HQ OPS Officer: STEVE SANDIN
Notification Date: 09/15/2007
Notification Time: 19:26 [ET]
Event Date: 09/14/2007
Event Time: 22:00 [CDT]
Last Update Date: 09/17/2007
Notification Time: 19:26 [ET]
Event Date: 09/14/2007
Event Time: 22:00 [CDT]
Last Update Date: 09/17/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
WILLIAM JONES (R4)
PATRICE BUBAR (FSME)
THOMAS BLOUNT (IRD)
WILLIAM JONES (R4)
PATRICE BUBAR (FSME)
THOMAS BLOUNT (IRD)
AGREEMENT STATE REPORT INVOLVING POTENTIAL OVEREXPOSURES DURING INDUSTRIAL RADIOGRAPHY
At approximately 2200 hrs. on 9/14/07 during radiography work at a jobsite in Vidor, TX (30 miles north of Beaumont), two radiographers noticed that their pocket dosimeters read off-scale high (range 0- 200 m R). They were using a 94 curie Co-60 camera (QSA model 943, A424-14, S/N36391B) to take radiographic shots of a 6 inch thickness steel ladle and had just changed the film in the holder which was located about 7 inches from the exposed source behind the steel ladle. It appeared that the source had not retracted into its shielded volume. A specialist in source retrieval was brought to the jobsite and the source successfully returned to its stowed position. During retrieval the specialist's pocket dosimeter also went off-scale high (range 0-5 R) at which time he switched to a higher reading dosimeter (range 0-20 R) completing the task with an indicated dose of 13 R.
The State of Texas was notified of the incident at 1804 hrs. on 9/15/07 and confirmed that the licensee was sending the individuals dosimetry off for emergency reading. Further, the State contacted REAC/TS (Radiation Emergency Assistance Center/Training Site) who recommended that these individuals be immediately medically examined with followup blood chemistry tests, i.e., CBC (complete blood cell), performed the following day to document any cytogenic changes. The State will conduct an investigation to determine the cause of the overexposures.
* * * UPDATE PROVIDED BY RAY JISHA TO JEFF ROTTON VIA EMAIL AT 0927 ON 09/17/07 * * *
The State provided the following information via email:
"The two workers 200 mR dosimeters were off scale and it appears that they were working with the source not fully retracted as a crimp in the source tube was noted approximately 1.5 feet from the camera. A ladder was used to enter the ladle from one side and the source was positioned on the opposite side with a magnetic hold on device. It has been conveyed that the hold on device fell off at some time and damaged the source tube restricting the full retraction of the source for two shots with a survey being taken on the second shot and thus the source being discovered in the exposed position. The source retrieval was difficult apparently requiring the source to be fully extended so that the source tube could be manually stripped from the drive cable. This took reportedly 12 one minute maneuvers, lead shot bags used when possible."
"Blood was drawn Saturday and twice Sunday for CBC the results of which are to be faxed to REACTS. On Monday blood will be drawn with heparin/lithium for transport to REACTS for cytogenic analysis. Our inspector in the area is to conduct a recreation on the event today and more details will follow in a formal report."
Texas report number I-8444
Notified R4DO (V. Campbell) and FSME EO (Morell), and IRD Manager (Blount)
At approximately 2200 hrs. on 9/14/07 during radiography work at a jobsite in Vidor, TX (30 miles north of Beaumont), two radiographers noticed that their pocket dosimeters read off-scale high (range 0- 200 m R). They were using a 94 curie Co-60 camera (QSA model 943, A424-14, S/N36391B) to take radiographic shots of a 6 inch thickness steel ladle and had just changed the film in the holder which was located about 7 inches from the exposed source behind the steel ladle. It appeared that the source had not retracted into its shielded volume. A specialist in source retrieval was brought to the jobsite and the source successfully returned to its stowed position. During retrieval the specialist's pocket dosimeter also went off-scale high (range 0-5 R) at which time he switched to a higher reading dosimeter (range 0-20 R) completing the task with an indicated dose of 13 R.
The State of Texas was notified of the incident at 1804 hrs. on 9/15/07 and confirmed that the licensee was sending the individuals dosimetry off for emergency reading. Further, the State contacted REAC/TS (Radiation Emergency Assistance Center/Training Site) who recommended that these individuals be immediately medically examined with followup blood chemistry tests, i.e., CBC (complete blood cell), performed the following day to document any cytogenic changes. The State will conduct an investigation to determine the cause of the overexposures.
* * * UPDATE PROVIDED BY RAY JISHA TO JEFF ROTTON VIA EMAIL AT 0927 ON 09/17/07 * * *
The State provided the following information via email:
"The two workers 200 mR dosimeters were off scale and it appears that they were working with the source not fully retracted as a crimp in the source tube was noted approximately 1.5 feet from the camera. A ladder was used to enter the ladle from one side and the source was positioned on the opposite side with a magnetic hold on device. It has been conveyed that the hold on device fell off at some time and damaged the source tube restricting the full retraction of the source for two shots with a survey being taken on the second shot and thus the source being discovered in the exposed position. The source retrieval was difficult apparently requiring the source to be fully extended so that the source tube could be manually stripped from the drive cable. This took reportedly 12 one minute maneuvers, lead shot bags used when possible."
"Blood was drawn Saturday and twice Sunday for CBC the results of which are to be faxed to REACTS. On Monday blood will be drawn with heparin/lithium for transport to REACTS for cytogenic analysis. Our inspector in the area is to conduct a recreation on the event today and more details will follow in a formal report."
Texas report number I-8444
Notified R4DO (V. Campbell) and FSME EO (Morell), and IRD Manager (Blount)
Power Reactor
Event Number: 43642
Facility: PILGRIM
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: DAVID NOYES
HQ OPS Officer: STEVE SANDIN
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: DAVID NOYES
HQ OPS Officer: STEVE SANDIN
Notification Date: 09/14/2007
Notification Time: 13:20 [ET]
Event Date: 09/14/2007
Event Time: 10:50 [EDT]
Last Update Date: 09/14/2007
Notification Time: 13:20 [ET]
Event Date: 09/14/2007
Event Time: 10:50 [EDT]
Last Update Date: 09/14/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
JAMES TRAPP (R1)
JAMES TRAPP (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 50 | Power Operation |
OFFSITE NOTIFICATION TO EPA REQUIRED BY NPDES PERMIT
"At 0630 hours on September 14, 2007, while operating at 100% power, Pilgrim Station experienced a fish impingement on the intake structure traveling screens. Plant power was reduced to 50% and one of two seawater circulating pumps was secured. The impingement did not impact the operability of safety related cooling water systems. At 1050 hours, plant assessment determined that the impingement, involving a large school of Atlantic juvenile menhaden, is reportable to the Environmental Protection Agency (EPA) under conditions of the Pilgrim National Pollutant Discharge Elimination System (NPDES) permit. Following a substantial reduction in the numbers of fish discharged via the traveling screen outfall trough, the seawater pump was restored to service and restoration of the plant to 100% power is in progress."
The licensee informed the NRC Resident Inspector and will inform both the State and EPA.
"At 0630 hours on September 14, 2007, while operating at 100% power, Pilgrim Station experienced a fish impingement on the intake structure traveling screens. Plant power was reduced to 50% and one of two seawater circulating pumps was secured. The impingement did not impact the operability of safety related cooling water systems. At 1050 hours, plant assessment determined that the impingement, involving a large school of Atlantic juvenile menhaden, is reportable to the Environmental Protection Agency (EPA) under conditions of the Pilgrim National Pollutant Discharge Elimination System (NPDES) permit. Following a substantial reduction in the numbers of fish discharged via the traveling screen outfall trough, the seawater pump was restored to service and restoration of the plant to 100% power is in progress."
The licensee informed the NRC Resident Inspector and will inform both the State and EPA.