Event Notification Report for September 03, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
09/02/2007 - 09/03/2007
EVENT NUMBERS
43613
Power Reactor
Event Number: 43613
Facility: BROWNS FERRY
Region: 2 State: AL
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: MATTHEW RASMUSSEN
HQ OPS Officer: JASON KOZAL
Region: 2 State: AL
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: MATTHEW RASMUSSEN
HQ OPS Officer: JASON KOZAL
Notification Date: 09/03/2007
Notification Time: 05:05 [ET]
Event Date: 09/03/2007
Event Time: 02:14 [CDT]
Last Update Date: 09/05/2007
Notification Time: 05:05 [ET]
Event Date: 09/03/2007
Event Time: 02:14 [CDT]
Last Update Date: 09/05/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
SCOTT SHAEFFER (R2)
SCOTT SHAEFFER (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | M/R | Y | 100 | Power Operation | 0 | Hot Shutdown |
MANUAL REACTOR SCRAM DUE TO ELECTRO-HYDRAULIC CONTROL (EHC) SYSTEM LEAK
"At 0214 [CDT] on 09/03/2007 with Unit 1 at 100% power a core flow runback and manual reactor scram were initiated due to a Electro-Hydraulic Control (EHC) System leak. Units 2 and 3 were also at 100% power and were unaffected by the event. As expected reactor water level momentarily lowered below +2 inches (Reactor Low Water Level) and all appropriate PCIS [Primary Containment Isolation System] isolations, Group 2 (RHR Shutdown Cooling). Group 3 (RWCU), Group 6 (Ventilation), and Group 8 (TIP) were received along with the auto start of CREVs [Control Room Emergency Ventilation] and 3 SBGT trains.
"This event is reportable as a 4-hour and 8-hour non-emergency notification along with a 60-day written report in accordance with 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50 72(b)(3)(iv)(A) and 10 CFR 50.73(a)(2)(iv)(A) as 'any event or condition that results in valid actuation of RPS or PCIS.'
"All control rods fully inserted, the electrical grid is stable, the EDGs and ESF systems remain available, and decay heat is being removed via the Turbine Bypass Valves and reactor water level is being controlled by the Reactor Feedwater System. The licensee notified the NRC Resident Inspector.
"Investigation into the cause of the leak is ongoing."
* * * UPDATE FROM DON SMITH TO HUFFMAN AT 1357 EDT ON 9/05/07 * * *
"The Unit 2 Refuel Zone Inboard Exhaust Damper, 2-FCO-64-10, failed to indicate closed in the Control Room at Panel 2-9-25 in response to the Group 6 isolation signal received during the Unit 1 Reactor SCRAM on 09/03/2007 at 0214 CDT as required by the plant design. The damper was physically verified to be open. The Unit 2 Refuel Zone Outboard Exhaust Damper, 2-FCO-64-09 automatically isolated as designed in response to the Group 6 isolation signal fulfilling its Safety Function, was verified closed and was later tagged closed as required by Technical Specifications. Investigation into the cause of the failure of the 2-FCO-64-10 is ongoing."
The licensee notified the NRC Resident Inspector. R2DO ( Ernstes) notified.
"At 0214 [CDT] on 09/03/2007 with Unit 1 at 100% power a core flow runback and manual reactor scram were initiated due to a Electro-Hydraulic Control (EHC) System leak. Units 2 and 3 were also at 100% power and were unaffected by the event. As expected reactor water level momentarily lowered below +2 inches (Reactor Low Water Level) and all appropriate PCIS [Primary Containment Isolation System] isolations, Group 2 (RHR Shutdown Cooling). Group 3 (RWCU), Group 6 (Ventilation), and Group 8 (TIP) were received along with the auto start of CREVs [Control Room Emergency Ventilation] and 3 SBGT trains.
"This event is reportable as a 4-hour and 8-hour non-emergency notification along with a 60-day written report in accordance with 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50 72(b)(3)(iv)(A) and 10 CFR 50.73(a)(2)(iv)(A) as 'any event or condition that results in valid actuation of RPS or PCIS.'
"All control rods fully inserted, the electrical grid is stable, the EDGs and ESF systems remain available, and decay heat is being removed via the Turbine Bypass Valves and reactor water level is being controlled by the Reactor Feedwater System. The licensee notified the NRC Resident Inspector.
"Investigation into the cause of the leak is ongoing."
* * * UPDATE FROM DON SMITH TO HUFFMAN AT 1357 EDT ON 9/05/07 * * *
"The Unit 2 Refuel Zone Inboard Exhaust Damper, 2-FCO-64-10, failed to indicate closed in the Control Room at Panel 2-9-25 in response to the Group 6 isolation signal received during the Unit 1 Reactor SCRAM on 09/03/2007 at 0214 CDT as required by the plant design. The damper was physically verified to be open. The Unit 2 Refuel Zone Outboard Exhaust Damper, 2-FCO-64-09 automatically isolated as designed in response to the Group 6 isolation signal fulfilling its Safety Function, was verified closed and was later tagged closed as required by Technical Specifications. Investigation into the cause of the failure of the 2-FCO-64-10 is ongoing."
The licensee notified the NRC Resident Inspector. R2DO ( Ernstes) notified.