Event Notification Report for August 18, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
08/17/2007 - 08/18/2007
Fuel Cycle Facility
Event Number: 43578
Facility: PORTSMOUTH GASEOUS DIFFUSION PLANT
Region: 2 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: JIM MCCLEERY
HQ OPS Officer: MARK ABRAMOVITZ
Region: 2 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: JIM MCCLEERY
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 08/18/2007
Notification Time: 20:18 [ET]
Event Date: 08/18/2007
Event Time: 02:10 [EDT]
Last Update Date: 08/18/2007
Notification Time: 20:18 [ET]
Event Date: 08/18/2007
Event Time: 02:10 [EDT]
Last Update Date: 08/18/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
CHARLES R. OGLE (R2)
JOSEPH HOLONICH (FSME)
CHARLES R. OGLE (R2)
JOSEPH HOLONICH (FSME)
FEED FACILITY AUTOCLAVE O-RING FAILURE
"08-18-07 at 0210 in the X-342 , Feed Facility, Autoclave #1, 10 minutes into the heating cycle (mode II) experienced an air leak past the Viton O-ring. The steam was secured and autoclave shell opened 30 minutes later. Inspection of the Viton O-ring resulted in the discovery of a 3/8" separation of splice joint. A pressure decay was performed to determine if the O-ring would have performed its 'Q' function. The test failed resulting in a 24 hr. event."
This was reported under 10CFR76.120(c)(2)(i).
The licensee will notify the NRC Resident Inspector.
"08-18-07 at 0210 in the X-342 , Feed Facility, Autoclave #1, 10 minutes into the heating cycle (mode II) experienced an air leak past the Viton O-ring. The steam was secured and autoclave shell opened 30 minutes later. Inspection of the Viton O-ring resulted in the discovery of a 3/8" separation of splice joint. A pressure decay was performed to determine if the O-ring would have performed its 'Q' function. The test failed resulting in a 24 hr. event."
This was reported under 10CFR76.120(c)(2)(i).
The licensee will notify the NRC Resident Inspector.
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 43579
Facility: SAN ONOFRE
Region: 4 State: CA
Unit: [] [2] [3]
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: MICHAEL MCBREARTY
HQ OPS Officer: JOHN MacKINNON
Region: 4 State: CA
Unit: [] [2] [3]
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: MICHAEL MCBREARTY
HQ OPS Officer: JOHN MacKINNON
Notification Date: 08/19/2007
Notification Time: 02:23 [ET]
Event Date: 08/18/2007
Event Time: 19:55 [PDT]
Last Update Date: 09/14/2007
Notification Time: 02:23 [ET]
Event Date: 08/18/2007
Event Time: 19:55 [PDT]
Last Update Date: 09/14/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(A) - POT UNABLE TO SAFE SD
10 CFR Section:
50.72(b)(3)(v)(A) - POT UNABLE TO SAFE SD
Person (Organization):
ANTHONY GODY (R4)
ANTHONY GODY (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 99 | Power Operation | 99 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
EMERGENCY DIESEL GENERATOR WORK PLATFORMS NOT PROPERLY RESTRAINED
"On August 18, 2007, at about 1955 PDT, both of SONGS Unit 3 Emergency Diesel Generators (EDG) were found in a condition that was not seismically analyzed. At about 2015 PDT on August 18, 2007, both of SONGS Unit 2 EDGs were found to be in the same unanalyzed condition. The condition involved EDG maintenance work platforms that had not been properly restrained, and, in the position found, could potentially render the EDGs inoperable during a seismic event.
"SCE is reporting this occurrence as a potential loss of safety function in accordance with 10CFR50.72(b)(3)(v).
"SCE took immediate actions to properly restrain the EDG work platforms, and an evaluation will be conducted to determine the cause of this event. At the time of this occurrence, Unit 2 was operating at about 99% power and Unit 3 was operating at about 100% power. SCE has notified the NRC Senior Resident Inspector about this occurrence and will provide them with a copy of this report."
* * * UPDATE AT 1853 EDT ON 09/14/07 FROM SUSAN GARDNER TO S. SANDIN * * *
The licensee is retracting this report based on the following:
"On August 18, 2007, SCE reported that Emergency Diesel Generator (EDG) work platforms on both Units 2 and 3 had not been properly restrained. This resulted in a condition unanalyzed for seismic events. Consequently, both trains of EDGs on both Units 2 and 3 were declared inoperable.
"SCE evaluated configuration of the platforms for vulnerabilities to a design bases event. SCE concluded that the DGs were operable as-found.
"Consequently, SCE is retracting the phone report to the NRC (Event Log No. 43579)."
The licensee will inform the NRC Resident Inspector. Notified R4DO (Jones).
"On August 18, 2007, at about 1955 PDT, both of SONGS Unit 3 Emergency Diesel Generators (EDG) were found in a condition that was not seismically analyzed. At about 2015 PDT on August 18, 2007, both of SONGS Unit 2 EDGs were found to be in the same unanalyzed condition. The condition involved EDG maintenance work platforms that had not been properly restrained, and, in the position found, could potentially render the EDGs inoperable during a seismic event.
"SCE is reporting this occurrence as a potential loss of safety function in accordance with 10CFR50.72(b)(3)(v).
"SCE took immediate actions to properly restrain the EDG work platforms, and an evaluation will be conducted to determine the cause of this event. At the time of this occurrence, Unit 2 was operating at about 99% power and Unit 3 was operating at about 100% power. SCE has notified the NRC Senior Resident Inspector about this occurrence and will provide them with a copy of this report."
* * * UPDATE AT 1853 EDT ON 09/14/07 FROM SUSAN GARDNER TO S. SANDIN * * *
The licensee is retracting this report based on the following:
"On August 18, 2007, SCE reported that Emergency Diesel Generator (EDG) work platforms on both Units 2 and 3 had not been properly restrained. This resulted in a condition unanalyzed for seismic events. Consequently, both trains of EDGs on both Units 2 and 3 were declared inoperable.
"SCE evaluated configuration of the platforms for vulnerabilities to a design bases event. SCE concluded that the DGs were operable as-found.
"Consequently, SCE is retracting the phone report to the NRC (Event Log No. 43579)."
The licensee will inform the NRC Resident Inspector. Notified R4DO (Jones).