Event Notification Report for June 20, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
06/19/2007 - 06/20/2007
Power Reactor
Event Number: 43433
Facility: CLINTON
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: JIM PETERSON
HQ OPS Officer: JOHN MacKINNON
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: JIM PETERSON
HQ OPS Officer: JOHN MacKINNON
Notification Date: 06/20/2007
Notification Time: 16:35 [ET]
Event Date: 06/20/2007
Event Time: 13:55 [CDT]
Last Update Date: 06/20/2007
Notification Time: 16:35 [ET]
Event Date: 06/20/2007
Event Time: 13:55 [CDT]
Last Update Date: 06/20/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
JAMNES CAMERON (R3)
JAMNES CAMERON (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 1 | Startup | 1 | Startup |
MAJOR LOSS OF EMERGENCY ASSESSMENT CAPABILITY - 13 OF 44 EMERGENCY SIRENS OUT OF SERVICE
"On June 20, 2007, a disturbance on the transmission system was experienced causing a loss of 13 of 44 emergency sirens (approximately 30 percent) for Clinton Power Station. At 1355 hours (CDT), since power was not restored to these sirens within one hour, this event was determined to be a major loss of emergency assessment capability. At 1512 hours, only 6 sirens (14 percent) remain out of service. At this time, an estimated return to service has not been provided for the remaining sirens."
"DeWitt County, Illinois Emergency Management Agency, and the NRC Resident have been informed of this information. "
"On June 20, 2007, a disturbance on the transmission system was experienced causing a loss of 13 of 44 emergency sirens (approximately 30 percent) for Clinton Power Station. At 1355 hours (CDT), since power was not restored to these sirens within one hour, this event was determined to be a major loss of emergency assessment capability. At 1512 hours, only 6 sirens (14 percent) remain out of service. At this time, an estimated return to service has not been provided for the remaining sirens."
"DeWitt County, Illinois Emergency Management Agency, and the NRC Resident have been informed of this information. "
Power Reactor
Event Number: 43435
Facility: SAN ONOFRE
Region: 4 State: CA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: JOEL BARNETT
HQ OPS Officer: PETE SNYDER
Region: 4 State: CA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: JOEL BARNETT
HQ OPS Officer: PETE SNYDER
Notification Date: 06/21/2007
Notification Time: 03:24 [ET]
Event Date: 06/20/2007
Event Time: 22:50 [PDT]
Last Update Date: 06/21/2007
Notification Time: 03:24 [ET]
Event Date: 06/20/2007
Event Time: 22:50 [PDT]
Last Update Date: 06/21/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
BLAIR SPITZBERG (R4)
BLAIR SPITZBERG (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | M/R | Y | 96 | Power Operation | 0 | Hot Standby |
FAILED INSTRUMENT AIR HEADER LEADS TO MANUAL REACTOR TRIP
At 2250 on 6/20/07, "Instrument Air header pressure failed at a brazed joint. The loss of Instrument Air pressure caused the Steam Generator (S/G) Feedwater Regulating Valves to stop controlling and S/G level, E-088, to rise uncontrolled. Control Room Operators tripped the reactor manually. Main Feedwater Pumps were manually tripped to stop excess feedwater to the S/Gs. Loss of Instrument Air failed the normal cooling to Containment. Containment Emergency Cooling units were manually started to provide containment cooling. The standard post trip actions were carried out with all safety functions satisfied." The site is proceeding with post trip recovery. The Instrument Air leak was isolated at 2321 PDT.
All control rods fully inserted on the manual trip. RCPs are in operation transferring decay heat to the S/Gs. Emergency feedwater is feeding the S/Gs with steam being discharged to the condenser via the steam dumps. Atmospheric relief valves were used to discharge steam to the atmosphere initially for approximately 20 minutes following the trip. There are no primary to secondary tube leaks. Containment isolation failed closed as expected following the loss of instrument air pressure to the containment.
Normal offsite power is available and the emergency diesel generators are available if needed.
The licensee notified the NRC Resident Inspector.
At 2250 on 6/20/07, "Instrument Air header pressure failed at a brazed joint. The loss of Instrument Air pressure caused the Steam Generator (S/G) Feedwater Regulating Valves to stop controlling and S/G level, E-088, to rise uncontrolled. Control Room Operators tripped the reactor manually. Main Feedwater Pumps were manually tripped to stop excess feedwater to the S/Gs. Loss of Instrument Air failed the normal cooling to Containment. Containment Emergency Cooling units were manually started to provide containment cooling. The standard post trip actions were carried out with all safety functions satisfied." The site is proceeding with post trip recovery. The Instrument Air leak was isolated at 2321 PDT.
All control rods fully inserted on the manual trip. RCPs are in operation transferring decay heat to the S/Gs. Emergency feedwater is feeding the S/Gs with steam being discharged to the condenser via the steam dumps. Atmospheric relief valves were used to discharge steam to the atmosphere initially for approximately 20 minutes following the trip. There are no primary to secondary tube leaks. Containment isolation failed closed as expected following the loss of instrument air pressure to the containment.
Normal offsite power is available and the emergency diesel generators are available if needed.
The licensee notified the NRC Resident Inspector.
Agreement State
Event Number: 46860
Rep Org: NEW YORK STATE DEPT. OF HEALTH
Licensee: NONE PROVIDED
Region: 1
City: State: NY
County:
License #:
Agreement: Y
Docket:
NRC Notified By: NONE PROVIDED
HQ OPS Officer: JOE O'HARA
Licensee: NONE PROVIDED
Region: 1
City: State: NY
County:
License #:
Agreement: Y
Docket:
NRC Notified By: NONE PROVIDED
HQ OPS Officer: JOE O'HARA
Notification Date: 05/19/2011
Notification Time: 14:36 [ET]
Event Date: 06/20/2007
Event Time: 00:00 [EDT]
Last Update Date: 05/19/2011
Notification Time: 14:36 [ET]
Event Date: 06/20/2007
Event Time: 00:00 [EDT]
Last Update Date: 05/19/2011
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
MEL GRAY (R1DO)
ANGELA MCINTOSH (FSME)
MEL GRAY (R1DO)
ANGELA MCINTOSH (FSME)
AGREEMENT STATE REPORT - MEDICAL MISADMINISTRATION USING HDR AFTERLOADER
The following was received from the State of New York via fax:
"New York law prohibits the release of any identifiers In cases of medical events. Therefore, the facility name etc. is not contained in this report.
"The licensee telephoned [the State of New York] on 6/20/07, to report misadministration on 6/19/07. Patient was a 73 year old woman receiving the second of her 5 fractions of HDR for cancer of the cervix. It was a ring and tandem setup. 600 cGy prescribed to point A in the cervix. Patient moved about halfway through the treatment and with the applicator about 6 cm inferior to the cervix, the cervix received about 382 cGy while the vagina received about 218 cGy.
"During a conference call between Bureau staff and facility staff including radiation oncologist, physicist, and administrator, it was learned that the patient had had 10 children and muscles were not tight. Prior to the start of the treatment, she complained of discomfort from the foley catheter due to bladder distention and the clamp was loosened a bit. She continued to be uncomfortable and moved during the treatment of 644 seconds. Therapists reassured her and completed the treatment, despite the movement. It was discovered later that the applicator had slid inferior by about 6 cm.
"The radiation oncologist believes that the 218 cGy to the vagina will not impact the patient adversely because there is some disease in that area. The patient and the referring physician have been informed. The physician does not plan to make up for the deficit dose to point A in the cervix. Facility submitted an RCA and to prevent recurrence, they have implemented the following measures. (1) Minimize time between applicator insertion and treatment. (2) Use of stabilizing devices at the time of insertion to minimize applicator movement (3) Use anatomical markings at the time of device insertion to help verify applicator position just prior to and during treatment (4) Expand patient instruction with increased emphasis on need to remain still and (5) Staff education on patient monitoring prior to and during treatment, with applicator position verification added to physics checklist.
"These are sufficient.
"As of 5/13/09, the patient is free of disease and complications.
"This event may be closed."
HDR Brachytherapy misadministration (NYS DOH Internal Tracking No. 548). New York Event Number NY-11-01.
A Medical Event may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.
The following was received from the State of New York via fax:
"New York law prohibits the release of any identifiers In cases of medical events. Therefore, the facility name etc. is not contained in this report.
"The licensee telephoned [the State of New York] on 6/20/07, to report misadministration on 6/19/07. Patient was a 73 year old woman receiving the second of her 5 fractions of HDR for cancer of the cervix. It was a ring and tandem setup. 600 cGy prescribed to point A in the cervix. Patient moved about halfway through the treatment and with the applicator about 6 cm inferior to the cervix, the cervix received about 382 cGy while the vagina received about 218 cGy.
"During a conference call between Bureau staff and facility staff including radiation oncologist, physicist, and administrator, it was learned that the patient had had 10 children and muscles were not tight. Prior to the start of the treatment, she complained of discomfort from the foley catheter due to bladder distention and the clamp was loosened a bit. She continued to be uncomfortable and moved during the treatment of 644 seconds. Therapists reassured her and completed the treatment, despite the movement. It was discovered later that the applicator had slid inferior by about 6 cm.
"The radiation oncologist believes that the 218 cGy to the vagina will not impact the patient adversely because there is some disease in that area. The patient and the referring physician have been informed. The physician does not plan to make up for the deficit dose to point A in the cervix. Facility submitted an RCA and to prevent recurrence, they have implemented the following measures. (1) Minimize time between applicator insertion and treatment. (2) Use of stabilizing devices at the time of insertion to minimize applicator movement (3) Use anatomical markings at the time of device insertion to help verify applicator position just prior to and during treatment (4) Expand patient instruction with increased emphasis on need to remain still and (5) Staff education on patient monitoring prior to and during treatment, with applicator position verification added to physics checklist.
"These are sufficient.
"As of 5/13/09, the patient is free of disease and complications.
"This event may be closed."
HDR Brachytherapy misadministration (NYS DOH Internal Tracking No. 548). New York Event Number NY-11-01.
A Medical Event may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.