Event Notification Report for June 08, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
06/07/2007 - 06/08/2007
EVENT NUMBERS
43413
Power Reactor
Event Number: 43413
Facility: VERMONT YANKEE
Region: 1 State: VT
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: D. MAY
HQ OPS Officer: JOHN MacKINNON
Region: 1 State: VT
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: D. MAY
HQ OPS Officer: JOHN MacKINNON
Notification Date: 06/08/2007
Notification Time: 10:49 [ET]
Event Date: 06/08/2007
Event Time: 09:10 [EDT]
Last Update Date: 06/08/2007
Notification Time: 10:49 [ET]
Event Date: 06/08/2007
Event Time: 09:10 [EDT]
Last Update Date: 06/08/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
RICHARD BARKLEY (R1)
RICHARD BARKLEY (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 81 | Power Operation | 81 | Power Operation |
HIGH PRESSURE COOLANT INJECTION (HPCI) DECLARED INOPERABLE.
"During the performance of quarterly HPCI valve testing in accordance with OP4120 one of the two injection valves, HPCI-19, did not stroke open as required. Prior to testing the HPCI system was in normal standby line up. HPCI-19 was stroke tested during the outage on 6-1-07 and operated normally. HPCI-19 was also tested and verified to open during the ECCS test on 6-1-07."
HPCI was declared inoperable per Technical Specification 3.5.E.2 (14 day Limiting Condition of Operation). All other ECCS systems and the EDGs are fully operable and the electrical grid is stable.
The licensee has initiated repair efforts.
The NRC Resident Inspector was notified of this event by the licensee.
"During the performance of quarterly HPCI valve testing in accordance with OP4120 one of the two injection valves, HPCI-19, did not stroke open as required. Prior to testing the HPCI system was in normal standby line up. HPCI-19 was stroke tested during the outage on 6-1-07 and operated normally. HPCI-19 was also tested and verified to open during the ECCS test on 6-1-07."
HPCI was declared inoperable per Technical Specification 3.5.E.2 (14 day Limiting Condition of Operation). All other ECCS systems and the EDGs are fully operable and the electrical grid is stable.
The licensee has initiated repair efforts.
The NRC Resident Inspector was notified of this event by the licensee.