Event Notification Report for May 19, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/18/2007 - 05/19/2007
Power Reactor
Event Number: 43375
Facility: COOPER
Region: 4 State: NE
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: ROY GILES
HQ OPS Officer: BILL HUFFMAN
Region: 4 State: NE
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: ROY GILES
HQ OPS Officer: BILL HUFFMAN
Notification Date: 05/19/2007
Notification Time: 05:26 [ET]
Event Date: 05/19/2007
Event Time: 02:12 [CDT]
Last Update Date: 05/19/2007
Notification Time: 05:26 [ET]
Event Date: 05/19/2007
Event Time: 02:12 [CDT]
Last Update Date: 05/19/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
RUSSELL BYWATER (R4)
RUSSELL BYWATER (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | M/R | Y | 50 | Power Operation | 0 | Hot Shutdown |
MANUAL REACTOR TRIP DUE TO CONTROL ROD HCU VALVE BONNET LEAK INTO REACTOR BUILDING
"On the evening of 5/10/2007, Cooper began a scheduled down power to accomplish required preventive and corrective maintenance, including replacement of directional control valves on three control rod drive (CRD) hydraulic control units (HCU). HCU 26-27 was hydraulically isolated for maintenance. The plant was in a single recirculation loop configuration to perform corrective maintenance on 'A' Recirculation Motor Generator. A single reactor feed pump was in operation for corrective maintenance to the 'A' Reactor Feed Pump lube oil system.
"At approximately 0025 CDT on 5/19/2007 reports from the field indicated that a small water leak had developed from the body to bonnet seal of CRD-V-122 for HCU 26-27. The manual isolation valves for the HCU were already closed to isolate the maintenance area. However, due to seat leakage past one or both of the manual isolation valves, the leakage continued and degraded to the point that a visible plume of steam was issuing from the valve. Further, high airborne activity level developed in the vicinity of the HCU bank in the Reactor Building. As a precaution, the Control Room supervisor (CRS) evacuated the Reactor Building at 0125 CDT.
"At 0200 CDT, the CRS entered the station reactor scram procedure and performed the preparation steps of transferring electrical loads to the startup transformer. At 0212 CDT, the reactor was manually scrammed. All rods inserted normally. A Group 2 containment isolation signal was received on low reactor water level at 3". During the recovery, the remaining reactor feed pump was manually tripped at 50" in accordance with station procedures due to high RPV level conditions.
" 'B' RFP was restarted when conditions permitted and is being used to control RPV level. RPV pressure is being controlled by the bypass valves rejecting heat to the main condenser.
"This report is being submitted pursuant to 50.72 (2)(iv) for a critical scram and specified system actuation for the Group 2 containment isolation.
"Currently, the leak into the Reactor Building has stopped. Radiological conditions are being assessed and a repair and recovery plan developed.
"The Senior Resident Inspector has been informed."
The scram was characterized as uncomplicated and all systems functioned as required. No personnel contaminations or off-site releases occurred due to the HCU valve leak.
"On the evening of 5/10/2007, Cooper began a scheduled down power to accomplish required preventive and corrective maintenance, including replacement of directional control valves on three control rod drive (CRD) hydraulic control units (HCU). HCU 26-27 was hydraulically isolated for maintenance. The plant was in a single recirculation loop configuration to perform corrective maintenance on 'A' Recirculation Motor Generator. A single reactor feed pump was in operation for corrective maintenance to the 'A' Reactor Feed Pump lube oil system.
"At approximately 0025 CDT on 5/19/2007 reports from the field indicated that a small water leak had developed from the body to bonnet seal of CRD-V-122 for HCU 26-27. The manual isolation valves for the HCU were already closed to isolate the maintenance area. However, due to seat leakage past one or both of the manual isolation valves, the leakage continued and degraded to the point that a visible plume of steam was issuing from the valve. Further, high airborne activity level developed in the vicinity of the HCU bank in the Reactor Building. As a precaution, the Control Room supervisor (CRS) evacuated the Reactor Building at 0125 CDT.
"At 0200 CDT, the CRS entered the station reactor scram procedure and performed the preparation steps of transferring electrical loads to the startup transformer. At 0212 CDT, the reactor was manually scrammed. All rods inserted normally. A Group 2 containment isolation signal was received on low reactor water level at 3". During the recovery, the remaining reactor feed pump was manually tripped at 50" in accordance with station procedures due to high RPV level conditions.
" 'B' RFP was restarted when conditions permitted and is being used to control RPV level. RPV pressure is being controlled by the bypass valves rejecting heat to the main condenser.
"This report is being submitted pursuant to 50.72 (2)(iv) for a critical scram and specified system actuation for the Group 2 containment isolation.
"Currently, the leak into the Reactor Building has stopped. Radiological conditions are being assessed and a repair and recovery plan developed.
"The Senior Resident Inspector has been informed."
The scram was characterized as uncomplicated and all systems functioned as required. No personnel contaminations or off-site releases occurred due to the HCU valve leak.
Power Reactor
Event Number: 43376
Facility: GRAND GULF
Region: 4 State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: ERNEST MATHES
HQ OPS Officer: JOHN KNOKE
Region: 4 State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: ERNEST MATHES
HQ OPS Officer: JOHN KNOKE
Notification Date: 05/19/2007
Notification Time: 16:15 [ET]
Event Date: 05/19/2007
Event Time: 11:27 [CDT]
Last Update Date: 05/19/2007
Notification Time: 16:15 [ET]
Event Date: 05/19/2007
Event Time: 11:27 [CDT]
Last Update Date: 05/19/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
RUSSELL BYWATER (R4)
RUSSELL BYWATER (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 100 | Power Operation | 0 | Hot Shutdown |
REACTOR SCRAM DUE TO TURBINE TRIP ON LOSS OF CONDENSER VACUUM
"Grand Gulf scrammed at 11:27 on 5/19/07 due to Turbine trip caused by loss of vacuum (believed to be from condenser neck seal). All safety systems responded as required. All control rods inserted. No ECCS systems were required to initiate. Reactor vessel level 3 was reached and both divisions of isolation logic initiated. All associated valves already closed (normal lineup).
"Present condition is Mode 3 and reactor pressure is 250 psig. Cooldown is in progress."
No relief valves lifted as a result of the scram. Decay heat was initially removed via bypass valves to condenser. The plant then shifted to decay heat removal via drains and SRV's. Suppression pool temperature is 80 degrees and available if required. Offsite power is available and all emergency systems are available if needed.
The licensee will notify the NRC Resident Inspector.
"Grand Gulf scrammed at 11:27 on 5/19/07 due to Turbine trip caused by loss of vacuum (believed to be from condenser neck seal). All safety systems responded as required. All control rods inserted. No ECCS systems were required to initiate. Reactor vessel level 3 was reached and both divisions of isolation logic initiated. All associated valves already closed (normal lineup).
"Present condition is Mode 3 and reactor pressure is 250 psig. Cooldown is in progress."
No relief valves lifted as a result of the scram. Decay heat was initially removed via bypass valves to condenser. The plant then shifted to decay heat removal via drains and SRV's. Suppression pool temperature is 80 degrees and available if required. Offsite power is available and all emergency systems are available if needed.
The licensee will notify the NRC Resident Inspector.