Skip to main content

Event Notification Report for May 10, 2007

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/09/2007 - 05/10/2007

EVENT NUMBERS
4347843355

General Information or Other
Event Number: 43478
Rep Org: RI DEPT OF RADIOLOGICAL HEALTH
Licensee: RHODE ISLAND HOSPITAL
Region: 1
City: PROVIDENCE   State: RI
County:
License #: 7D-051-01
Agreement: Y
Docket:
NRC Notified By: JACK FERRUOLO
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 07/10/2007
Notification Time: 13:40 [ET]
Event Date: 05/10/2007
Event Time: 00:00 [EDT]
Last Update Date: 03/27/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
JOHN ROGGE (R1)
MICHELE BURGESS (FSME)
Event Text
MEDICAL AFTERLOADER-APPLICATOR PLACED IN INCORRECT LOCATION

"On 10 May 2007 it was discovered that a patient who was being treated for recurrent endometrial cancer (Paravaginal Tumor) had received a dose which differed from the prescribed dose for the fraction by greater than 50%. The intended dose to the patient was 500 cGy to the tumor. However, the actual dose administered was 12 Gy to an unintended site (the dose delivered was approx. 54 mm from the tip of the catheter instead of 5 mm from the tip). It was noted in the misadministration report that there were no critical structures that were exposed above any threshold tolerance. Due to a physics catheter measurement error, which was entered into the treatment plan, the catheter did not go in as deeply as intended but stopped short of the target. On audit of the procedure, and remeasurement of the catheter, the chief physicist identified the error in measurement and filed a report with the RI RCA. Corrective actions in addition to re-measurement and subsequent adjustment of treatment plan included adjustment in the dose per remaining fractions to provide the correct dose to the target."

Rhode Island Report: RI-07-001

Actual initial dose was approximately 10% of expected.

Source Ir-192, 8.05 Curies

A "Medical Event" may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.

* * * UPDATE FROM FLANNERY TO O'HARA VIA E-MAIL AT 0949 ON 7/11/07 * * *

"This event (EN43478) has been reviewed and determined to be a reportable medical event."

* * * UPDATE FROM FERRUOLO TO SNYDER VIA FACSIMILIE AT 1452 ON 3/27/08 * * *

The following information was received from the State via facsimilie:

"Based on preliminary information obtained per voice and e-mail: underdosing on initial fraction of treatment was due to improper measurement of the catheter. Adjustments were made in subsequent fractions. Written documentation of the incident stated that no critical structures were exposed above the threshold tolerances."

Notified R1DO (Bellamy) and FSME (McConnell).


Power Reactor
Event Number: 43355
Facility: FT CALHOUN
Region: 4     State: NE
Unit: [1] [] []
RX Type: [1] CE
NRC Notified By: KEVIN R BOSTON
HQ OPS Officer: JASON KOZAL
Notification Date: 05/10/2007
Notification Time: 20:16 [ET]
Event Date: 05/10/2007
Event Time: 15:30 [CDT]
Last Update Date: 05/10/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
VINCENT GADDY (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
OFFSITE NOTIFICATION DUE TO ELEVATED TRITIUM LEVELS

"On May 7, 2007, a horizontal concrete wall crack at approximately 990 ft 6 inch elevation in a radiologically controlled room located inside the protected area, was observed to have water drops forming on the surface. Samples were collected in enough quantity to perform radiological and chemical analysis. The analysis indicated tritium concentration of 110,000 pCi/L. The limits for tritium in the FCS Off-Site Dose Calculation Manual is 20,000 pCi/L. Based on this analysis a conservative decision to notify the state and local agencies was made on 5/10/2007 at 15:30 CDT per the NEI Ground Water Protection Program. These off-site notifications will be made on 5/11/2007. Further investigation is on-going."

The licensee notified the NRC Resident Inspector.