Skip to main content

Event Notification Report for April 09, 2007

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
04/08/2007 - 04/09/2007

EVENT NUMBERS
4329443292

General Information or Other
Event Number: 43294
Rep Org: FAIRBANKS MORSE ENGINE
Licensee: FAIRBANKS MORSE ENGINE
Region: 3
City: BELOIT   State: WI
County:
License #:
Agreement: Y
Docket:
NRC Notified By: DOMINIC DEDOLPH
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 04/09/2007
Notification Time: 20:30 [ET]
Event Date: 04/09/2007
Event Time: 00:00 [CDT]
Last Update Date: 04/09/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
Person (Organization):
JAMES TRAPP (R1)
CHARLES R. OGLE (R2)
SONIA BURGESS (R3)
THOMAS FARNHOLTZ (R4)
TABATABAI (E-MAIL)
Event Text
PART 21 NOTIFICATION - DIESEL CAM ROLLER BUSHING FAILURES

"The [fuel pump] cam roller bushing part number 16100527 (and part number 16600336 for the kit containing cam roller bushings) for the Fairbanks Morse Engine Opposed Piston engine Emergency Diesel Generator shipped prior to August 2001 may be made from an incorrect material that is too soft for the application.

"The subject emergency diesel generator would not have been able to achieve its maximum load rating and therefore not have been able to perform its intended function."

The potentially affected plants are:
Alabama Power/Farley
Arkansas Power
Amergen /GPU/TMI
Constellation/BG&E
Detroit Edison/Fermi
Dominion/Millstone
Vepco
Georgia Power/Hatch
Vermont Yankee
Exelon/PECO - Limerick/Peach Bottom
FPL/NMC/IES/Duane Arnold
NMC Prairie Island/Northern States
Progress Energy (CP&L)
SCANA/South Carolina Electric and Gas
Electronuclear (Electrobras)


Power Reactor
Event Number: 43292
Facility: DAVIS BESSE
Region: 3     State: OH
Unit: [1] [] []
RX Type: [1] B&W-R-LP
NRC Notified By: THOMAS PHILLIPS
HQ OPS Officer: JOHN KNOKE
Notification Date: 04/09/2007
Notification Time: 15:17 [ET]
Event Date: 04/09/2007
Event Time: 07:30 [EDT]
Last Update Date: 04/10/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
SONIA BURGESS (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
SEISMIC MONITORING SYSTEM OUT OF SERVICE

"On April 9, 2007, at approximately 0730 hours, the keyswitch for the Seismic Monitoring System was discovered in the off position, rendering the Seismic Monitoring System unavailable. The system has apparently been in this configuration since March 29, 2007, when deficiencies were found during routine calibration checks. The ability to declare an Unusual Event per Emergency Action Level 8.A.1 would not be significantly hampered by this event, because this declaration would be based on either personnel feeling an earthquake, or detection via the Seismic Monitoring System. However, the unavailability of the Seismic Monitoring System could potentially hamper the operators in determining the magnitude of an earthquake in order to determine if it reached Operating Basis Earthquake levels or Safe Shutdown Earthquake levels. Therefore, this could potentially hamper the declaration of an Alert or Site Area Emergency, respectively, per Emergency Action Levels 8.A.2 or 8.A.3. Therefore, this event is being considered reportable per 10 CFR 50.72(b)(3)(xiii), as it results in a loss of emergency assessment capability. Compensatory measures are being established to obtain an off-site source of this information in a timeframe that can support timely declaration of an emergency."

The licensee will notify the NRC Resident Inspector.

* * * UPDATE ON 04/10/07 AT 0936 EDT FROM THOMAS PHILLIPS TO MACKINNON * * *

"At time 0639 on 4/10/2007 the Seismic Monitoring System Instrumentation was reset. The Seismic Monitoring System is now FUNCTIONAL.

"With the SMA-3 Key Switch in the OPERATE position and the system RESET, the Seismic signal processing system and output devices are functioning to provide a STA SEISMIC INSTR ON alarm and to indicate if an OBE or SSE threshold has been exceeded. Therefore, the emergency assessment capability to declare an ALERT for EAL 8.A.2 or a Site Area Emergency for EAL 8.A.3 is restored. The Seismic Monitoring System remains INOPERABLE pending completion of DB-MI-04222, Seismic Instrumentation Calibration." R3DO (S. Burgess) notified.

NRC Resident Inspector will be notified of this update by the licensee.