Event Notification Report for January 15, 2007
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
01/14/2007 - 01/15/2007
Power Reactor
Event Number: 43101
Facility: POINT BEACH
Region: 3 State: WI
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: MARK HANSEN
HQ OPS Officer: BILL GOTT
Region: 3 State: WI
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: MARK HANSEN
HQ OPS Officer: BILL GOTT
Notification Date: 01/15/2007
Notification Time: 17:24 [ET]
Event Date: 01/15/2007
Event Time: 13:21 [CST]
Last Update Date: 01/15/2007
Notification Time: 17:24 [ET]
Event Date: 01/15/2007
Event Time: 13:21 [CST]
Last Update Date: 01/15/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
THOMAS KOZAK (R3)
THOMAS KOZAK (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
OFFSITE NOTIFICATION - OIL SPILL
At 1321 on January 15, 2007, the Point Beach Nuclear Plant asset owner notified the Wisconsin Department of Natural Resources (WDNR) that at about 10:00 a.m. on Sunday, January 14, 2007, approximately 20-25 gallons of vacuum pump hydraulic oil was released to the roof of the Point Beach Nuclear Plant heating boiler room. This event was caused by a failed seal in a vacuum pump. A small amount of this oil entered the rooftop drain system, and from there, it entered the plant's storm water drain system. The plant staff contained and removed the oil from the roof system. Absorbent pads were placed in the storm water system and at the exit of the system near the riprap above the beach. Approximately one gallon of the hydraulic oil was collected in the absorbent material at the exit of the storm water system. No oil discharged to the beach or the surface water.
The licensee notified the NRC Resident Inspector.
At 1321 on January 15, 2007, the Point Beach Nuclear Plant asset owner notified the Wisconsin Department of Natural Resources (WDNR) that at about 10:00 a.m. on Sunday, January 14, 2007, approximately 20-25 gallons of vacuum pump hydraulic oil was released to the roof of the Point Beach Nuclear Plant heating boiler room. This event was caused by a failed seal in a vacuum pump. A small amount of this oil entered the rooftop drain system, and from there, it entered the plant's storm water drain system. The plant staff contained and removed the oil from the roof system. Absorbent pads were placed in the storm water system and at the exit of the system near the riprap above the beach. Approximately one gallon of the hydraulic oil was collected in the absorbent material at the exit of the storm water system. No oil discharged to the beach or the surface water.
The licensee notified the NRC Resident Inspector.
General Information or Other
Event Number: 43103
Rep Org: UTAH DIVISION OF RADIATION CONTROL
Licensee: SHAW PIPE LINE SERVICES
Region: 4
City: TULSA State: OK
County:
License #: 35-23193-01
Agreement: Y
Docket:
NRC Notified By: GWYN GALLOWAY
HQ OPS Officer: BILL GOTT
Licensee: SHAW PIPE LINE SERVICES
Region: 4
City: TULSA State: OK
County:
License #: 35-23193-01
Agreement: Y
Docket:
NRC Notified By: GWYN GALLOWAY
HQ OPS Officer: BILL GOTT
Notification Date: 01/16/2007
Notification Time: 13:38 [ET]
Event Date: 01/15/2007
Event Time: 11:00 [CST]
Last Update Date: 01/16/2007
Notification Time: 13:38 [ET]
Event Date: 01/15/2007
Event Time: 11:00 [CST]
Last Update Date: 01/16/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
VIVIAN CAMPBELL (R4)
SCOTT FLANDERS (NMSS)
VIVIAN CAMPBELL (R4)
SCOTT FLANDERS (NMSS)
AGREEMENT STATE REPORT - RADIOGRAPHY CAMERA MALFUNCTION
At 1100 on 01/15/07, the radiography crew reported a radiography camera malfunction to their Radiation Safety Officer. The crew was using a Model SPEC 150 radiography exposure device with a 71 curie Ir-192 source. The radiography source had become disconnected from the drive cable and was stuck in the guide tube near the collimator. The guide tube was not crimped and the cause of the disconnect is not known. The crew covered the collimator with sand bags to limit access. That afternoon after consulting with SPEC, the crew was able to retract the source using a tong type apparatus. The licensee will return the camera to SPEC for repairs. There were no abnormal exposures. The crew was from Oklahoma and was working near Bonanza, Utah under a reciprocity agreement.
At 1100 on 01/15/07, the radiography crew reported a radiography camera malfunction to their Radiation Safety Officer. The crew was using a Model SPEC 150 radiography exposure device with a 71 curie Ir-192 source. The radiography source had become disconnected from the drive cable and was stuck in the guide tube near the collimator. The guide tube was not crimped and the cause of the disconnect is not known. The crew covered the collimator with sand bags to limit access. That afternoon after consulting with SPEC, the crew was able to retract the source using a tong type apparatus. The licensee will return the camera to SPEC for repairs. There were no abnormal exposures. The crew was from Oklahoma and was working near Bonanza, Utah under a reciprocity agreement.