Event Notification Report for October 16, 2006

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
10/15/2006 - 10/16/2006

EVENT NUMBERS
42908429094291042912

Power Reactor
Event Number: 42908
Facility: LACROSSE
Region: 3     State: WI
Unit: [1] [] []
RX Type: [1] AC (ALLIS CHAMBERS)
NRC Notified By: DAN TESAR
HQ OPS Officer: BILL GOTT
Notification Date: 10/16/2006
Notification Time: 09:13 [ET]
Event Date: 10/16/2006
Event Time: 07:16 [CDT]
Last Update Date: 10/17/2006
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a) (1) (i) - EMERGENCY DECLARED
Person (Organization):
DAVE PASSEHL (R3)
MICHELE BURGESS (NMSS)
TOM BLOUNT (IRD)
G GRAY (DHS)
M EACHES (FEMA)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Decommissioned 0 Decommissioned
Event Text
UNUSUAL EVENT - HIGH AIRBORNE PARTICULATE IN THE REACTOR BUILDING

Even though there have been no operations on going over the weekend, airborne activities have increased to above ten times the normal levels. Activity levels were increasing during work processes last week but did not reach abnormally high levels. The licensee is taking air samples and swipe surveys to determine the source. The element of interest is Americium. Workers entering the building are required to wear filter masks.

* * * UPDATE VIA FAX FROM LICENSEE AT 1250 ON 10/16/06 TO M. ABRAMOVITZ * * *

"Conditions at time of incident: SAFSTOR, decommissioning work in progress involving saw-cutting of Upper Control Rod Drive Mechanism (UCRDM) seal inject supply and effluent lines, plasma arc cutting of metal in Reactor Vessel upper cavity, and welding of lifting lugs on Reactor Vessel upper cavity expansion joint structure.

"Description: Thursday afternoon October 12, 2006, air samples of Reactor Building indicated higher levels of Americium-241 (Am-241) than normal. As of Monday morning October 16, 2006, Reactor Building ventilation through HEPA filters had not reduced the level of Am-241 as expected. Unusual Event was declared and investigations commenced to identify source of contamination.

"Immediate evaluation/corrective actions: Upper cavity work was halted Thursday afternoon following the air sample results. It was believed that welding or plasma arc cutting in the upper cavity had created the airborne problem. Air sampling on Friday October 13, 2006, indicated Am-241 levels still remained higher than normal. At that time, all personnel entering the Reactor Building were required to wear respirators. Air sampling continued through the weekend. When Am-241 levels had not decreased to acceptable levels by Monday morning, October 16, 2006, an Unusual Event was declared due to the unexpected nature of the airborne activity, lack of identification of the source of the activity, and activity level being greater than 10 times normal for the nuclide Am-241. Following declaration, the Operations Review Committee (ORC) was convened. Various strategies for identifying the source of the contamination were discussed and established. Surveys were conducted in the Reactor Building basement and the source of the contamination was tentatively identified as effluent from the UCRDM draining that occurred on Thursday morning October 12, 2006. Further analysis and clean-up is in progress."

Notified the R3DO (Skokowski).

* * * UPDATE FROM DAN TESAR TO W GOTT AT 0837 ON 10/17/06 * * *

The licensee secured from their Unusual Event at 0727 CDT. The licensee determined the source of the airborne activity, completed decontamination procedures and ventilated though a HEPA filter. Airborne samples are satisfactory.

Notified R3DO (R. Skokowski), NMSS (M. Burgess), IRD (M. Leach), DHS (G. Gray), FEMA (K. Biscoe), and NORAD-NC (Hardaway).


Power Reactor
Event Number: 42909
Facility: GINNA
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: KEVIN MCLAUGHLIN
HQ OPS Officer: JOHN KNOKE
Notification Date: 10/16/2006
Notification Time: 11:00 [ET]
Event Date: 10/16/2006
Event Time: 05:20 [EDT]
Last Update Date: 10/16/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL
Person (Organization):
RICHARD BARKLEY (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Refueling 0 Refueling
Event Text
FAILURE OF CONTAINMENT VENTILATION ISOLATION INSTRUMENTATION

"At 0520 hours on 10/16/06 with the plant in Mode 6, with containment shutdown purge system in operation and core alterations in progress, a Control Room Operator noted that Main Control Board annunciator L-4 'Safeguard DC Failure [Containment Isolation] CI and [Containment Ventilation Isolation] CVI Logic' was illuminated.

"ITS LCO 3.9.3 c. 2. requires that 'Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either (1) closed by a manual or automatic isolation valve, blind flange, or equivalent, or (2) capable of being closed by an operable Containment Ventilation Isolation System.'

"ITS LCO 3.3.5 Containment Ventilation Isolation Instrumentation Table 3.3.5-1 requires that Function 1, 'Automatic Actuation Logic and Actuation Relays' be operable during core alterations and movement of irradiated fuel assemblies within containment.

"Contrary to the requirements DC power was removed from the Containment Ventilation Logic and Actuation Relays on Friday 10/13/06. On Saturday 10/14/06 reactor vessel head lift was performed. Between Sunday 10/15/06 from 1559 until Monday at 0514 the movement of fuel and core alterations in containment were conducted. All fuel movement and core alterations were stopped at 0514 on 10/16/06."

The licensee notified the NRC Resident Inspector.


Hospital
Event Number: 42910
Rep Org: PETOSKEY CARDIOLOGY
Licensee: PETOSKEY CARDIOLOGY
Region: 3
City: PETOSKEY   State: MI
County:
License #: 21-32345-01
Agreement: N
Docket:
NRC Notified By: JAMES CARSON
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 10/16/2006
Notification Time: 14:38 [ET]
Event Date: 10/16/2006
Event Time: 08:30 [EDT]
Last Update Date: 10/16/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2201(a)(1)(ii) - LOST/STOLEN LNM>10X
Person (Organization):
RICHARD SKOKOWSKI (R3)
MICHELE BURGESS (NMSS)
Event Text
Tc-99m MEDICAL SOURCE LOST PRIOR TO USE

Seven pairs of Tc-99m sources were received in syringes in lead shielding, placed in their holders, and inventoried at 0800. At 0830 one source (15 milliCuries) was found missing. A search was conducted visually and with a radiac. The missing source was not found.

THIS MATERIAL EVENT CONTAINS A "LESS THAN CAT 3" LEVEL OF RADIOACTIVE MATERIAL

Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks.


Power Reactor
Event Number: 42912
Facility: POINT BEACH
Region: 3     State: WI
Unit: [] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: RICKY ROBBINS
HQ OPS Officer: JOE O'HARA
Notification Date: 10/16/2006
Notification Time: 23:15 [ET]
Event Date: 10/16/2006
Event Time: 21:26 [CDT]
Last Update Date: 10/17/2006
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a) (1) (i) - EMERGENCY DECLARED
Person (Organization):
RICHARD SKOKOWSKI (R3)
FREDERICK BROWN (NRR)
THOMAS BLOUNT (IRD)
HOLZ (DHS)
JIM DUNKER (FEMA)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
UNUSUAL EVENT - IDENTIFIED LEAKAGE GREATER THAN 25 GPM

"At 2126, PBNP Unit 2 had a inadvertent PORV (431C) lift. This was a momentary event, however, a PRT level change of 60 gallons was noticed. This event is classifiable per C.U.1.2 identified leakage greater than 25 GPM on Unit 2."

"This event has been terminated at 2139.

"This event was caused by a momentary loss of power to the PORV controller. Power was immediately restored."

The event was caused when a manually operated breaker (MOB) was inadvertently operated while the licensee was working inside the panels on the "B" train RHR system.

The licensee notified the NRC Resident Inspector, State and local officials.

* * * UPDATE FROM R. RODE TO P. SNYDER ON 10/17/06 AT 1544 * * *

"Unit 2 was in Mode 5 at ~150 psig, ~112 degrees F and the pressurizer (PZR) was in a water-solid condition per plant procedures. The following is a timeline of the event for clarification:

"20:47:49 A manually operated breaker (MOB-281) inadvertently opened while removing a caution tag resulting in an increase of flow in the RHR system.

"20:48:43 MOB-281 was reclosed correcting the RHR flow perturbation, however the adjacent breaker (MOB-282) inadvertently opened due to the vibration of MOB-281 being manipulated. This resulted in the loss of power to the RCS pressure instrumentation providing an input to a power-operated relief valve (PORV) causing the affected PORV to open. The PORV opening provided a flow path from the PZR to the Pressurizer Relief Tank (PRT).

"20:49:06 MOB-282 was reclosed resulting In the PORV shutting and isolating the flow path from the PZR to the PRT.

"20:55 The PRT level indication was checked on the Main Control Board, no change in level was observed as compared to prior to the event.

"While additional actions to stabilize the plant were being taken, the Shift Manager directed additional data to be obtained from the Plant Process Computer System (PPCS) regarding PRT parameters as the amount of water transferred was not large enough to be identified on the control board level Indication due to meter resolution.

"21:26 Analysis of the PPCS data indicated that 62.5 gallons of RCS inventory had been transferred from the PZR to the PRT while the PORV was open. It was identified that this exceeded allowable RCS leakage limits, and the Emergency Plan was implemented.

"21:32 An Unusual Event was declared per EAL CU 1.2, identified leakage greater than 25 gpm. It was recognized that this was a transient event and would be promptly terminated as the leakage flow path had been secured.

"21:39 The Unusual Event was terminated.

"21:43 State and County agencies were notified.

"21:50 NRC Resident notified.

"22:15 1 hour ENS Notification for Unusual Event and subsequent termination completed."

The licensee notified the NRC Resident Inspector. Notified R3DO (Skokowski).