Event Notification Report for October 09, 2006
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/08/2006 - 10/09/2006
Power Reactor
Event Number: 42894
Facility: SURRY
Region: 2 State: VA
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: THOMAS FREDETTE
HQ OPS Officer: JASON KOZAL
Region: 2 State: VA
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: THOMAS FREDETTE
HQ OPS Officer: JASON KOZAL
Notification Date: 10/09/2006
Notification Time: 14:17 [ET]
Event Date: 10/09/2006
Event Time: 11:24 [EDT]
Last Update Date: 10/09/2006
Notification Time: 14:17 [ET]
Event Date: 10/09/2006
Event Time: 11:24 [EDT]
Last Update Date: 10/09/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
THOMAS DECKER (R2)
THOMAS DECKER (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | N | 0 | Hot Shutdown | 0 | Hot Shutdown |
POTENTIAL VIOLATION OF VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT
"As a result of heavy rains, influent flows to the Surry Sewage Treatment Plant (STP) were in excess of 193,349 gallons on Saturday, October 7. Road conditions prevented normal pumping service from coming onsite to remove this excess water.
"Resultant analysis showed a loss of 54%, 39% and 10% solids in STP aeration tanks 1, 2 and 3, respectively. These 'solid' parameters are normally an indication that the STP is able to maintain effective treatment. At 1124 on 10/09/06, the Virginia Department of Environmental Quality (DEQ) was notified that the loss of solids may indicate that the treatment capability of the STP is impacted, which may cause a violation of one of the parameters of Surry's Virginia Pollutant Discharge Elimination System (VPDES) Permit.
"This event is being reported in accordance with 10CFR50.72(b)(2)(xi) due to the fact that the Virginia Department of Environmental Quality was notified at 1124 hours."
The licensee notified the NRC Resident Inspector.
"As a result of heavy rains, influent flows to the Surry Sewage Treatment Plant (STP) were in excess of 193,349 gallons on Saturday, October 7. Road conditions prevented normal pumping service from coming onsite to remove this excess water.
"Resultant analysis showed a loss of 54%, 39% and 10% solids in STP aeration tanks 1, 2 and 3, respectively. These 'solid' parameters are normally an indication that the STP is able to maintain effective treatment. At 1124 on 10/09/06, the Virginia Department of Environmental Quality (DEQ) was notified that the loss of solids may indicate that the treatment capability of the STP is impacted, which may cause a violation of one of the parameters of Surry's Virginia Pollutant Discharge Elimination System (VPDES) Permit.
"This event is being reported in accordance with 10CFR50.72(b)(2)(xi) due to the fact that the Virginia Department of Environmental Quality was notified at 1124 hours."
The licensee notified the NRC Resident Inspector.
Power Reactor
Event Number: 42892
Facility: GINNA
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: KEVIN McLAUGHLIN
HQ OPS Officer: MARK ABRAMOVITZ
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: KEVIN McLAUGHLIN
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 10/09/2006
Notification Time: 10:52 [ET]
Event Date: 10/09/2006
Event Time: 04:00 [EDT]
Last Update Date: 10/09/2006
Notification Time: 10:52 [ET]
Event Date: 10/09/2006
Event Time: 04:00 [EDT]
Last Update Date: 10/09/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
PAUL KROHN (R1)
PAUL KROHN (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Hot Shutdown | 0 | Cold Shutdown |
CONTAINMENT SUMP INOPERABLE WHEN REQUIRED BY TECHNICAL SPECIFICATIONS
"On October 9, 2006 at or about 0400 EDT it was discovered that the containment Sump B grating had been covered with temporary lead shielding. The shielding was placed as part of refueling outage activities in containment. Investigation has revealed that the lead shielding was put in place at about 0230 hours. All lead was removed from the grating. This was confirmed by the Outage Control Center at 0930. At the time of discovery the plant was in MODE 4 with RCS pressure of 315 psig, RCS Temperature of 337 °F.
"The plant entered MODE 5 at 08:15 hours on 10/9/06."
The B containment sump is the suction point for the A and B RHR pumps. When required, the RHR pumps also provide suction flow to the Safety Injection pumps. The containment sump is require to be operable in modes 1-4.
The licensee notified the NRC Resident Inspector.
"On October 9, 2006 at or about 0400 EDT it was discovered that the containment Sump B grating had been covered with temporary lead shielding. The shielding was placed as part of refueling outage activities in containment. Investigation has revealed that the lead shielding was put in place at about 0230 hours. All lead was removed from the grating. This was confirmed by the Outage Control Center at 0930. At the time of discovery the plant was in MODE 4 with RCS pressure of 315 psig, RCS Temperature of 337 °F.
"The plant entered MODE 5 at 08:15 hours on 10/9/06."
The B containment sump is the suction point for the A and B RHR pumps. When required, the RHR pumps also provide suction flow to the Safety Injection pumps. The containment sump is require to be operable in modes 1-4.
The licensee notified the NRC Resident Inspector.