Power Reactor
Event Number: 42558
Facility: OYSTER CREEK
Region: 1     State: NJ
Unit: [1] [] []
RX Type: [1] GE-2
NRC Notified By: STEVE FULLER
HQ OPS Officer: STEVE SANDIN
Notification Date: 05/06/2006
Notification Time: 12:31 [ET]
Event Date: 05/06/2006
Event Time: 06:07 [EDT]
Last Update Date: 05/06/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
RONALD BELLAMY (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R N 0 Power Operation 0 Startup
Event Text
UNPLANNED MANUAL REACTOR SCRAM DURING SHUTDOWN

"A manual reactor scram was inserted to expedite a reactor shutdown. The reactor was subcritical at the time of the manual scram. All control rods inserted to less than or equal to position 02 as required."

The unit entered a forced outage for necessary repairs including replacement of the "B" recirc pump motor. All systems functioned as required for the manual reactor scram.

The licensee informed the NRC Resident Inspector.


Power Reactor
Event Number: 42559
Facility: PALO VERDE
Region: 4     State: AZ
Unit: [] [] [3]
RX Type: [1] CE,[2] CE,[3] CE
NRC Notified By: BRAD EKLUND
HQ OPS Officer: STEVE SANDIN
Notification Date: 05/06/2006
Notification Time: 20:30 [ET]
Event Date: 05/06/2006
Event Time: 16:35 [MST]
Last Update Date: 05/06/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
RUSSELL BYWATER (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
VALID ACTUATION OF EMERGENCY DIESEL GENERATOR DUE TO LOW VOLTAGE CONDITION

"The following event description is based on information currently available. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS or under the reporting requirements of 10CFR50.73.

"On May 6, 2006, at approximately 16:35 US Mountain Standard Time (MST) a valid actuation of the Palo Verde Nuclear Generating Station Unit 3 Train 'A' Emergency Diesel Generator (EDG) occurred as a result of an undervoltage condition on its respective safety bus (PBA-S03). EDG 'A' started and loaded as designed to energize PBA-S03. The loss of power to the safety bus occurred during Gas Turbine Generator testing. GTG number 1 was supplying safety bus PBA-S03 at a low voltage when supply breaker PBA-S03L opened unexpectedly. This resulted in the deenergization of the safety bus PBA-S03.

"The emergency diesel generator started and all required related safety equipment started as expected.

"No Emergency Plan declaration was made and none was required.

"Unit 3 was in mode 5 at 50 psia and140 degrees F. Shutdown Cooling Train B was OPERABLE and in service. No other ESF actuations occurred and none were required. The event did not result in any challenges to fission product barriers and there were no adverse safety consequences as a result of this event. The event did not adversely affect the safe operation of the plant or the health and safety of the public.

"The NRC Resident Inspector has been notified of the ESF actuation and this ENS notification."