Skip to main content

Event Notification Report for May 03, 2006

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/02/2006 - 05/03/2006

EVENT NUMBERS
42547425484254943263

Power Reactor
Event Number: 42547
Facility: DIABLO CANYON
Region: 4     State: CA
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: JOHN MACINTYRE
HQ OPS Officer: BILL GOTT
Notification Date: 05/03/2006
Notification Time: 12:28 [ET]
Event Date: 05/03/2006
Event Time: 02:14 [PDT]
Last Update Date: 05/03/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
Person (Organization):
RUSSELL BYWATER (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Refueling 0 Refueling
Event Text
DEGRADED CONDITION

"Greater than one percent of steam generator (SG) 2-4 tubes were determined to be defective and require plugging. Diablo Canyon performs 100% bobbin inspection of SG tubes, thus, no expanded bobbin inspection scope was required.

"On May 3, 2006, during the Unit 2 thirteenth refueling outage (2R13), final analysis of eddy current data of SG 2-4 indicated that greater than one percent of the total tubes inspected were defective placing them in Category C-3. Thirty four (34) detective tubes in SG 2-4 were detected and are being plugged. Most of the pluggable indications are due to axial outside diameter stress corrosion cracking at the hot leg tube support plates. Diablo Canyon TS 5.5.9, Table 5.5.9-2, requires 'Notification to NRC pursuant to 10 CFR 50.72(b)(2)' (replaced by 10 CFR 50.72(b)(3)(ii), an 8-hour non-emergency ENS report requirement).

"An NRC teleconference in accordance with TS 5.6.10.d to report the preliminary SG tube inspection results is scheduled for May 3, 2006, at 1000 PDT.

"A Special Report in accordance with TS 5.6.10.a to report the number of tubes plugged in each SG, and TS 5.6.10.c describing the cause of the tube degradation and corrective measures taken to prevent recurrence will be submitted prior to returning Diablo Canyon Unit 2 to power operation."

The licensee notified the NRC Resident Inspector.


Power Reactor
Event Number: 42548
Facility: CALLAWAY
Region: 4     State: MO
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: DAVID LANTZ
HQ OPS Officer: BILL GOTT
Notification Date: 05/03/2006
Notification Time: 13:55 [ET]
Event Date: 05/03/2006
Event Time: 07:00 [CDT]
Last Update Date: 05/03/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
RUSSELL BYWATER (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF RESPONSE CAPABILITY - TECHNICAL SUPPORT CENTER (TSC)

"This report is being made pursuant to 10CFR50.72(b)(3)(xiii), 8-hour Non-Emergency Report due to the loss of off-site response capability. As of 0700 Central Daylight Savings Time on 5/03/2006 the TSC was declared non-functional due to the discovery of non-conservative surveillance acceptance criteria for the TSC ventilation system flow balance. The acceptance criteria allow for a higher percentage of pressurization flow from filtered outside air and lower recirculation flow than is supported by the radiological consequences analysis for the TSC. This condition is complicated by the fact that the radiological consequences analysis has not been updated to incorporate changes to plant operation and radiological source term derived from the current license basis Loss of Coolant Accident analysis. Preliminary evaluations using current plant configuration, current TSC ventilation flow balance values, and current calculation methodology indicate that post-accident dose to TSC personnel is approximately 31.7 Rem to the thyroid, exceeding the acceptance criterion of 30 Rem.

"Activities to revise applicable surveillance acceptance criteria and restore TSC functionality by re-balancing TSC ventilation flows to establish acceptable dose consequences have been initiated and are expected to be complete by 2000 on 5/3/2006. Affected Emergency Response Organization members have been instructed on compensatory measures in place until the TSC is fully functional.

"Callaway Plant is currently operating in Mode 1 at 100% power. Normal plant operation is unaffected by the partial loss of TSC function.

"The licensee has notified the NRC Resident Inspector."

* * * UPDATE FROM F. BIERMANN TO P. SNYDER AT 2036 ON 5/3/06 * * *

"TSC ventilation flow balancing activities to restore TSC functionality have been completed. The TSC was declared functional and restored to service at 1930 CDT on 5/3/06."

The licensee will inform the NRC Resident Inspector.

Notified R4DO (Bywater).


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 42549
Facility: FITZPATRICK
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: JOHN WALKOWIAK
HQ OPS Officer: JOHN KNOKE
Notification Date: 05/04/2006
Notification Time: 06:07 [ET]
Event Date: 05/03/2006
Event Time: 22:30 [EDT]
Last Update Date: 05/04/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
Person (Organization):
RONALD BELLAMY (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
RCIC DECLARED INOPERABLE DUE TO DEGRADED FLOW INSTRUMENT

The licensee indicated the Reactor Core Isolation Cooling (RCIC) has been made inoperable by a degraded flow instrument. The deficiency will prevent RCIC from achieving its design flow of 410 gpm. The degraded condition limits the flow to 360 gpm. This condition put the licensee into LCO 3.5.3.A. To exit the LCO an I&C tech will need to perform a venting operation on the flow transmitter.

The licensee will notify the NRC Resident Inspector.

* * * UPDATE AT 1252 EDT ON 5/4/06 FROM GENE DORMAN TO S. SANDIN * * *

The licensee provided the following additional information:

EVENT NOTIFICATION RETRACTION

"At 0607 on 05/04/2006 the James A. FitzPatrick Nuclear Power Plant notified the NRC Operations Center that, 'Reactor Core Isolation Cooling (RCIC) System has been made inoperable by a degraded flow instrument. The deficiency will prevent RCIC from achieving its design flow rate of 410 gpm. Estimated flow rate in the current condition is 360 gpm.' This notification was made pursuant to 10 CFR 50.72(b)(3)(ii)(A) 'Any event or condition that results in: (A) The conditions of the nuclear power plant, including its principal safety barriers, being seriously degraded;'

"Subsequent review of this event determined that the degradation of the RCIC System did not result in any of the plant's principal safety barriers (i.e., fuel cladding, reactor coolant pressure boundary, or the primary containment integrity) being degraded therefore, criterion 10 CFR 50.72(b)(3)(ii)(A) is not applicable to the event. Additionally the guidance contained in Regulatory Issue Summary (RIS) 2001-14, 'Position on Reportability Requirements for Reactor Core Isolation Cooling System Failure' was reviewed and it was confirmed that the RCIC System is not credited in the UFSAR for mitigating the consequences of a rod ejection accident, so the 10 CFR 50.72(b)(3)(v)(D) accident mitigation criterion does not apply. Consequently this notification is being retracted."

The licensee informed the NRC Resident Inspector. Notified R1DO (Bellamy).


General Information or Other
Event Number: 43263
Rep Org: OK DEQ RAD MANAGEMENT
Licensee: KAY COUNTY HOSPITAL LLC
Region: 4
City: PONCA CITY   State: OK
County:
License #: OK-14046-02
Agreement: Y
Docket:
NRC Notified By: MIKE BRODERICK
HQ OPS Officer: JOHN MacKINNON
Notification Date: 03/29/2007
Notification Time: 11:37 [ET]
Event Date: 05/03/2006
Event Time: 12:00 [CDT]
Last Update Date: 03/30/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
JACK WHITTEN (R4)
GREG MORELL (FSME)
Event Text
AGREEMENT STATE REPORT FROM OKALAHOMA - HIGHER DOSE THAN PRESCRIBED

This event took place between 05/03/06 and 03/27/07 and involved ten patients during this time period being treated for prostate cancer using Iodine-125. Kay County Hospital LLC (formally known as Via Cristi Hospital) had changed from ordering I-125 doses in Air-Kerma to millicuries. During the time period from 05/03/06 to 03/27/07 they used the incorrect dose count. This caused each of the ten patients to receive a dose 27 percent higher than the written directive. This did not pose any harm to the patients. The error was discovered on 03/28/07 by a newly hired Medical Physicist.

The licensee is in the process of notifying the affected patients. The licensee will also being working with the software vendor to develop better training and procedures for the performance of dose calculations to prevent reoccurrence.

* * * UPDATE ON 3/30/2007 AT 0720 FROM FLANNERY (NRC/FSME) VIA E-MAIL TO ABRAMOVITZ * * *

This event has been reviewed and determined to be a reportable medical event.

A "Medical Event" may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient.