Event Notification Report for March 12, 2006
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
03/11/2006 - 03/12/2006
EVENT NUMBERS
42407
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 42407
Facility: SUSQUEHANNA
Region: 1 State: PA
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: JIM HUFFORD
HQ OPS Officer: STEVE SANDIN
Region: 1 State: PA
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: JIM HUFFORD
HQ OPS Officer: STEVE SANDIN
Notification Date: 03/12/2006
Notification Time: 09:12 [ET]
Event Date: 03/12/2006
Event Time: 02:17 [EST]
Last Update Date: 04/18/2006
Notification Time: 09:12 [ET]
Event Date: 03/12/2006
Event Time: 02:17 [EST]
Last Update Date: 04/18/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
10 CFR Section:
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
Person (Organization):
JOHN WHITE (R1)
JOHN WHITE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
LLRT TEST IDENTIFIED PIPING PENETRATION WITH EXCESSIVE LEAKAGE
"While performing local leak rate testing [LLRT] during a planned refueling outage, Susquehanna discovered a Type C penetration on Unit 1 with a leak rate of 12,700 sccm. The limit for this penetration, which can bypass secondary containment, is 4,247 sccm or 9 scfh. Even with this leak rate, the combined leak rate for all penetrations and valves subject to Type B and C tests meets the acceptance criteria of 10CFR50 Appendix J, which is 190,744.7 sccm. This condition seriously degrades the condition of the nuclear power plant, including its principal safety barriers, and is reportable in accordance with 10CFR50.72(b)(3)(ii)."
The licensee informed the NRC Resident Inspector.
* * * UPDATE AT 1015 EDT ON 4/18/06 FROM JIM HUFFORD TO S. SANDIN * * *
"THE FOLLOWING IS A RETRACTION OF ENS NOTIFICATION #42407
"On March 12, 2006, Susquehanna Steam Electric Station reported that a Type C penetration valve on Unit 1 experienced a leak rate of 12,700 sccm during testing. This leakage rate exceeded the TS allowed limit of 4,247 sccm (9 scfh) for Secondary Containment Bypass Leakage (SCBL) valves. Although a non-intrusive investigation determined that a significant amount of the leakage was past a non-Technical Specification test boundary valve, workers were unable to immediately quantify the exact amount of leakage attributable to this valve. Susquehanna conservatively assigned all leakage experienced during the test to the primary containment isolation valve being tested and reported the situation as a condition that seriously degraded the nuclear power plant per 10CFR50.72(b)(3)(ii). Subsequently, Susquehanna successfully re-worked the test boundary valve that was adversely affecting the leak rate test results. With no other changes in test conditions beyond this improvement in the test boundary, the test was re-performed with 464 sccm leakage observed. Total calculated leakage for SCBL amounted to 1306 sccm, well within Tech Spec limits. These results indicate that the excessive leakage was leakage past the test boundary valve and not the tested PCIV. As such, the SCBL limit was never exceeded and the ENS notification (#42407) is, therefore, being retracted."
The licensee informed the NRC Resident Inspector. Notified R1DO (Dan Holody).
"While performing local leak rate testing [LLRT] during a planned refueling outage, Susquehanna discovered a Type C penetration on Unit 1 with a leak rate of 12,700 sccm. The limit for this penetration, which can bypass secondary containment, is 4,247 sccm or 9 scfh. Even with this leak rate, the combined leak rate for all penetrations and valves subject to Type B and C tests meets the acceptance criteria of 10CFR50 Appendix J, which is 190,744.7 sccm. This condition seriously degrades the condition of the nuclear power plant, including its principal safety barriers, and is reportable in accordance with 10CFR50.72(b)(3)(ii)."
The licensee informed the NRC Resident Inspector.
* * * UPDATE AT 1015 EDT ON 4/18/06 FROM JIM HUFFORD TO S. SANDIN * * *
"THE FOLLOWING IS A RETRACTION OF ENS NOTIFICATION #42407
"On March 12, 2006, Susquehanna Steam Electric Station reported that a Type C penetration valve on Unit 1 experienced a leak rate of 12,700 sccm during testing. This leakage rate exceeded the TS allowed limit of 4,247 sccm (9 scfh) for Secondary Containment Bypass Leakage (SCBL) valves. Although a non-intrusive investigation determined that a significant amount of the leakage was past a non-Technical Specification test boundary valve, workers were unable to immediately quantify the exact amount of leakage attributable to this valve. Susquehanna conservatively assigned all leakage experienced during the test to the primary containment isolation valve being tested and reported the situation as a condition that seriously degraded the nuclear power plant per 10CFR50.72(b)(3)(ii). Subsequently, Susquehanna successfully re-worked the test boundary valve that was adversely affecting the leak rate test results. With no other changes in test conditions beyond this improvement in the test boundary, the test was re-performed with 464 sccm leakage observed. Total calculated leakage for SCBL amounted to 1306 sccm, well within Tech Spec limits. These results indicate that the excessive leakage was leakage past the test boundary valve and not the tested PCIV. As such, the SCBL limit was never exceeded and the ENS notification (#42407) is, therefore, being retracted."
The licensee informed the NRC Resident Inspector. Notified R1DO (Dan Holody).