Skip to main content

Event Notification Report for March 08, 2006

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
03/07/2006 - 03/08/2006

EVENT NUMBERS
4268242399423954239642397

Other Nuclear Material
Event Number: 42682
Rep Org: KAKIVIK ASSET MANAGEMENT
Licensee: KAKIVIK ASSET MANAGEMENT
Region: 4
City: ANCHORAGE   State: AK
County:
License #: 50-27667-01
Agreement: N
Docket:
NRC Notified By: JEFF AVESON
HQ OPS Officer: BILL HUFFMAN
Notification Date: 07/03/2006
Notification Time: 10:30 [ET]
Event Date: 03/08/2006
Event Time: 00:00 [YDT]
Last Update Date: 07/03/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
30.50(b)(2) - SAFETY EQUIPMENT FAILURE
Person (Organization):
MICHAEL SHANNON (R4)
TIM HARRIS (NMSS)
Event Text
RADIOGRAPHY SOURCE PIGTAIL DISCONNECTED FROM DRIVE CABLE

On the evening of March 8, 2006, while performing radiography at an Alpine Oilfield, North Slope Alaska location, Kakivik Asset Management had a source pigtail disconnect from its drive cable on its radiography camera (INC Model IR100 #6621 using an Iridium-192 source). The disconnect occurred after a series of approximately 30 exposures where taken.

There where no overexposures.

The exposure device (with source) was sent to the manufacturer for an evaluation and disposal. The connector on the drive cable was removed and replaced with a new one. After an examination of the connection by both the RSO and the manufacturer, there appeared to be no obvious conclusion as to why it failed to stay connected.

The licensee issued a detailed 30 day report of the incident under 10 CFR 34.101 to Region 4 on April 11, 2006. However, a 24 hour notification under 10 CFR 30.50 to the NRC Headquarter's Operations Center was never made. This report constitutes the licensee's telephone notification of this event.


Power Reactor
Event Number: 42399
Facility: TURKEY POINT
Region: 2     State: FL
Unit: [3] [] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: MICHAEL COEN
HQ OPS Officer: JOHN KNOKE
Notification Date: 03/08/2006
Notification Time: 22:38 [ET]
Event Date: 03/08/2006
Event Time: 15:53 [EST]
Last Update Date: 03/09/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
PAUL FREDRICKSON (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
VALID ACTUATION OF EMERGENCY DIESEL GENERATORS

"While restoring power to the 3C 480V Load Center following planned maintenance, the 3A safety related 4KV Bus was deenergized by the 3A Sequencer. This resulted in a valid actuation of the emergency diesel generator. The plant was in Mode 5, depressurized, with reactor coolant system level at approximately the vessel flange level. This resulted in a temporary loss of residual heat removal flow which was restored within approximately seven (7) minutes. Reactor coolant system temperature increased from 113 degrees F to 140 degrees F.

"Reactor coolant system level and temperature were stabilized at pre-event values."

At this time the licensee is preparing to restore off-site power to the 3A Bus and put the emergency diesel generator in standby. The licensee is also investigating the cause of the power loss to the 3A safety related 4KV Bus.

The licensee will notify the NRC Resident Inspector.

* * * UPDATE FROM G. RICHARDSON TO M. RIPLEY 2248 EST 03/09/06 * * *

"In response to questions regarding the cause of the loss of the 3A 4KV bus, the following information is provided:

"The 3C 480 volt Load Center was de-energized for maintenance and was being restored at the time of the event. One of the maintenance activities associated with the 3C Load Center involved replacement of the 480V feeder breaker for the load center. A rotating cam inside the auxiliary switch for the replacement breaker was misaligned. The misaligned cam caused the switch contacts to operate in reverse, such that normally open contacts would be normally closed and vice versa. One of the auxiliary contacts on the 3C Load Center 480V feeder breaker provides input to the A-train Emergency Diesel Generator (EDG) Load Sequencer. With this contact operation reversed (closed vs. open with the breaker open), the Load Sequencer sensed undervoltage on the 3C Load Center, when the 4kV feeder breaker for the load center was closed. The contact being open would normally block the undervoltage signal, until the 480V feeder breaker was closed and the bus was energized. Once the A-train Load Sequencer sensed the undervoltage condition, the 3A 4kV bus was stripped and then re-energized from the 3A EDG."

The licensee notified the NRC Resident Inspector. Notified R2DO (Fredrickson)


Power Reactor
Event Number: 42395
Facility: SALEM
Region: 1     State: NJ
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: PAUL ABBOTT
HQ OPS Officer: MIKE RIPLEY
Notification Date: 03/08/2006
Notification Time: 14:08 [ET]
Event Date: 03/08/2006
Event Time: 11:09 [EST]
Last Update Date: 03/08/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
JOHN WHITE (R1)
ERIC BENNER (NRR)
PETER WILSON (IRD)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Standby
Event Text
AUTOMATIC REACTOR TRIP AS A RESULT OF A TURBINE GENERATOR TRIP

"This 4-hour notification is being made in accordance with 10CFR50.72(b)(2)(iv)(b). Salem Unit-1 reactor automatically tripped at 1109 (RPS actuation). The trip was initiated due to turbine trip. The cause of the turbine trip is being investigated.

"All safety systems functioned as designed with the exception of control rod 1SC1, which did not fully insert. 1SC1 indicates 16 steps. It should indicate zero steps when fully inserted. Auxiliary Feedwater pumps started as expected. Off-site power is available. Emergency diesel generators are available but not required at this time.

"During the implementation of the EOP's, a steam leak was reported in the Turbine Building. The Main Steam Isolation Valves (MSIV's) were closed as a conservative measure. This is an 8-hour reportable occurrence in accordance with 10CFR50.72(b)(3)(iv)(a). The leak was subsequently identified as a feedwater leak on the 11CN32 (11 Steam Generator Feed Pump suction valve). The Condensate System was placed in a normal shutdown line-up and the leak is not an impact to personnel safety or plant stability. Decay heat removal is via the atmospheric steam dumps at this time. The MSIV's are being bypassed to restore the main condenser as a heat sink.

"Salem Unit-1 is currently in Mode 3 with reactor coolant system temperature at approximately 549 deg F with pressure at 2235 psig.

"There was no equipment out of service that contributed to this event and there were no personnel injuries or radiological occurrences associated with this event."

The licensee has notified the NRC Resident Inspector and will be making State and local notifications. A press release is expected.


Power Reactor
Event Number: 42396
Facility: INDIAN POINT
Region: 1     State: NY
Unit: [2] [3] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: STEVE PRUSSMAN
HQ OPS Officer: JOHN KNOKE
Notification Date: 03/08/2006
Notification Time: 17:15 [ET]
Event Date: 03/08/2006
Event Time: 10:30 [EST]
Last Update Date: 03/08/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
JOHN WHITE (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF OFFSITE COMMUNICATIONS - SIRENS IN EMERGENCY PLANNING ZONE

"On March 8, 2006, at approximately 1030 hours, a full alert siren test was initiated for the sirens in the Indian Point emergency planning zone. Of the 156 sirens, the system initially reported that the activation was underway at 138 sirens. Eighteen of the fifty one sirens in Rockland County (one of the four counties in the 10 mile emergency planning zone) indicated communications failures. One of these, siren R-17, was out of service prior to the test. A final activation report was not available from the system. However, the initial system report was accepted as a basis for the ENS notification since twenty five percent of the sirens had observers who confirmed the initial report results for the sirens they observed.

"During the test the siren system computer locked up. None of the 156 sirens could be activated with the computer in this condition. These conditions represent a degraded emergency siren notification system which is reportable under 10 CFR 50.72(b)(3)(xiii). Both Units 2 and 3 were at 100 percent power and remain at 100 percent power.

"The siren system was returned to service at approximately 1510 hours on March 8, 2006, with the exception of siren R-17 which remains out of service. All four counties conducted a silent test to confirm functionality. The program application that malfunctioned has been identified and is now functioning properly. The cause of the malfunction is still under investigation.

"The counties and State were notified of the loss of sirens. In the event of an emergency, route alerting and outbound calling would have been available to compensate for the siren system loss. Condition report IP2-CR2006-01138 was written for this event."

The licensee notified the NRC Resident Inspector and other Government agencies.


Power Reactor
Event Number: 42397
Facility: SEABROOK
Region: 1     State: NH
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: PAUL DUNDIN
HQ OPS Officer: MIKE RIPLEY
Notification Date: 03/08/2006
Notification Time: 17:26 [ET]
Event Date: 03/08/2006
Event Time: 08:00 [EST]
Last Update Date: 03/08/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
JOHN WHITE (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
24-HOUR CONDITION OF LICENSE REPORT DUE TO FAILURE TO SUBMIT TS REQUIRED EXPOSURE REPORT

"At 0800 on March 8, 2006, FPL Energy Seabrook discovered a failure to comply with administrative Technical Specification (TS) 6.8.1.2.a. This TS requires submittal of a radiation occupational exposure report by March 1 of each year. On March 8, FPL Energy Seabrook discovered that the report for 2005 had not been submitted and, consequently, failed to meet the March 1st submittal date specified by TS 6.8.1.2.a. This condition is being reported in accordance with the Seabrook Station Facility Operating License, condition 2.G, which requires a 24-hour notification of any violations of section 2.C.(2) of the operating license (FPL Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan)."

The licensee notified the NRC Resident Inspector.