Event Notification Report for February 26, 2006

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/25/2006 - 02/26/2006

EVENT NUMBERS
42375

Power Reactor
Event Number: 42375
Facility: COOPER
Region: 4     State: NE
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: ANDREW OHRABLO
HQ OPS Officer: JOE O'HARA
Notification Date: 02/26/2006
Notification Time: 04:32 [ET]
Event Date: 02/26/2006
Event Time: 02:50 [CST]
Last Update Date: 02/26/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
LINDA SMITH (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 70 Power Operation 0 Hot Shutdown
Event Text
MANUAL REACTOR SCRAM DUE TO MSR HIGH LEVEL

"This report is being made pursuant to 10CFR50.72 (b) (2) (iv) (B) actuation of RPS when the reactor is critical (4 hour report) and 10CFR50.72 (b) (3) (iv) (A) actuation of PCIS group 2 (8 hour report).

"At 0250 on 2/26/06, Central Standard Time, Cooper Nuclear Station was manually scrammed due to main turbine reheat valve remaining closed following testing concurrent with a high level in the moisture separator. Alarm card procedure for this condition required removing the turbine from service. Subsequent to the scram, reactor vessel level lowered to minus 20 inches wide range indication. This corresponds to approximately 140 inches above the top of the fuel. A primary containment isolation system (PCIS) group 2 isolation occurred as expected due to level transient. All automatic actions occurred as expected.

"The NRC Senior Resident Inspector has been informed of the event."

The reactor scram was uncomplicated, all control rods fully inserted, and no relief or safety valves lifted. The electrical lineup is normal, and the decay heat path is to the main condenser through the turbine bypass valves.