Event Notification Report for January 24, 2006

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
01/23/2006 - 01/24/2006

EVENT NUMBERS
42285

Power Reactor
Event Number: 42285
Facility: RIVER BEND
Region: 4     State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: CHAD G. BLANCHARD
HQ OPS Officer: STEVE SANDIN
Notification Date: 01/25/2006
Notification Time: 01:33 [ET]
Event Date: 01/24/2006
Event Time: 19:32 [CST]
Last Update Date: 01/25/2006
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
BLAIR SPITZBERG (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
INVALID HIGH PRESSURE CORE SPRAY (HPCS) INITIATION SIGNAL DURING SURVEILLANCE TESTING

"50.72 (b) (3) (vi) Non-Emergency 8Hr Reportable

"When I&C was performing STP-051-4256, HPCS Drywell Pressure High Channel Calibration and Logic System Functional Test (B21-N067R, B21-N667R), a human performance error resulted in an invalid HPCS initiation signal. Division III diesel generator and the HPCS pump started. The HPCS injection valve stroked open and was manually overridden closed after full open indication, thus HPCS system injection was terminated. HPCS System was unavailable due to being overridden with an initiation signal present from 1932 until 2109 [CST] for a total of 1 Hr and 37 minutes.

"NUREG 1022 states that single-train systems that perform safety functions (i.e., HPCS), when lost, prevents the fulfillment of the safety function of that system."

The licensee informed the NRC Resident Inspector.