Event Notification Report for December 06, 2005
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
12/05/2005 - 12/06/2005
EVENT NUMBERS
42216
Power Reactor
Event Number: 42216
Facility: FARLEY
Region: 2 State: AL
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: RICHARD WELLS
HQ OPS Officer: BILL GOTT
Region: 2 State: AL
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: RICHARD WELLS
HQ OPS Officer: BILL GOTT
Notification Date: 12/21/2005
Notification Time: 16:27 [ET]
Event Date: 12/06/2005
Event Time: 23:00 [CST]
Last Update Date: 12/21/2005
Notification Time: 16:27 [ET]
Event Date: 12/06/2005
Event Time: 23:00 [CST]
Last Update Date: 12/21/2005
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
PAUL FREDRICKSON (R2)
PAUL FREDRICKSON (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 86 | Power Operation | 86 | Power Operation |
INVALID SPECIFIED SYSTEM ACTUATION - "A" AUXILIARY FEEDWATER
"This report is being made in lieu of an LER per the guidance of 10CFR50.73(a)(2)(iv)(A). The `A' train Motor Driven Auxiliary Feedwater pump received an invalid auto-start signal due to a failed safeguards driver board in the A train Solid State Protection System (SSPS). This was a complete actuation of the 'A' train of auxiliary feedwater, and all components functioned as designed. The pump was manually secured and no other systems were affected. The plant entered an 8 hour LCO for an inoperable train of SSPS. The safeguards driver board was replaced and the plant exited the LCO. Investigation of the cause of the card failure is in progress."
The licensee notified the NRC Resident Inspector.
"This report is being made in lieu of an LER per the guidance of 10CFR50.73(a)(2)(iv)(A). The `A' train Motor Driven Auxiliary Feedwater pump received an invalid auto-start signal due to a failed safeguards driver board in the A train Solid State Protection System (SSPS). This was a complete actuation of the 'A' train of auxiliary feedwater, and all components functioned as designed. The pump was manually secured and no other systems were affected. The plant entered an 8 hour LCO for an inoperable train of SSPS. The safeguards driver board was replaced and the plant exited the LCO. Investigation of the cause of the card failure is in progress."