Skip to main content

Event Notification Report for April 18, 2005

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
04/17/2005 - 04/18/2005

EVENT NUMBERS
4160941610

Fuel Cycle Facility
Event Number: 41609
Facility: BWX TECHNOLOGIES
Region: 2     State: VA
Unit: [] [] []
RX Type: URANIUM FUEL FABRICATION
NRC Notified By: LEAH MORRELL
HQ OPS Officer: WESLEY HELD
Notification Date: 04/18/2005
Notification Time: 16:54 [ET]
Event Date: 04/18/2005
Event Time: 16:45 [EDT]
Last Update Date: 05/11/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
PART 70 APP A (c) - OFFSITE NOTIFICATION/NEWS REL
Person (Organization):
PAUL FREDRICKSON (R2)
Event Text
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
THIS IS NOT A NEW REPORT.

This event report was originally withheld from public release under the NRC's policy for protecting sensitive unclassified information. The NRC has reevaluated this policy and is now making this event report available to the public with suitable redactions.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

CONCURRENT REPORT UNDER PART 70 APPENDIX A FOR OFFSITE NEWS RELEASE

"This concurrent report is being made to the NRC as a result of a media inquiry that was made to BWX Technologies as a result of Event #41594, that was originally reported to the NRC by Ledoux & Company on April 13, 2005. The attached BWX Technologies Press Release was provided to Alex Nussbaum of the Bergen Record, Hackensack, NJ at approximately 4:45 pm on April 18, 2005."

Contact HOO for information on the press release.

The NRC Resident Inspector will be notified.

The NMSS EO (Flanders) and R2DO (Fredrickson) have been notified.

* * * UPDATE ON 05/11/08 BY H. Crouch * * *

THIS IS NOT A NEW REPORT.

This event report was originally withheld from public release under the NRC's policy for protecting sensitive unclassified information. The NRC has reevaluated this policy and is now making this event report available to the public with suitable redactions.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *


General Information or Other
Event Number: 41610
Rep Org: SPECTRUM TECHNOLOGIES
Licensee: SPECTRUM TECHNOLOGIES
Region: 1
City: SCHENECTADY   State: NY
County:
License #:
Agreement: Y
Docket:
NRC Notified By: BILL WILLIS (VIA FAX)
HQ OPS Officer: BILL HUFFMAN
Notification Date: 04/18/2005
Notification Time: 17:30 [ET]
Event Date: 04/18/2005
Event Time: 00:00 [EST]
Last Update Date: 04/18/2005
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
Person (Organization):
DAVID SILK (R1)
PART 21 COORDINATOR (NRR)
Event Text
PART 21 NOTIFICATION CONCERNING CUTLER-HAMMER A200 NEMA SIZE 1 STARTERS

"In March 2002, Spectrum Technologies provided 20 Class 1 E safety related Cutler-Hammer A200 NEMA Size 1 starters to Rochester Gas & Electric Company - Ginna Station. Spectrum Technologies had purchased the starters as commercial grade items from Cutler-Hammer, and dedicated them per EPRI NP5652, method 1, Special Tests and Inspections.

"Ginna Station advised Spectrum Technologies that they had installed one of these starters in the circuit for their Boric Acid Storage Tank (BAST) Heaters. Approximately eight (8) weeks later they received an alarm for low BAST temperature. Investigation found an open coil on the starter and replaced the starter. The failed starter was sent to the Ginna Materials Laboratory for analysis. This analysis indicates that a manufacturing defect caused the failure.

"The Ginna Materials Laboratory examined the starter using a low power binocular microscope for signs of defects, overheating, or cracks. Resistance measurements between the two coils in the starter were taken and they were then subjected to X-ray radiography. Subsequent to this, the coils were disassembled and sectioned to reveal the defect. The failed coil wire was also examined using scanning electron microscopy for signs of overheating or melting.

"It was determined that the failure is the result of a manufacturing defect in the epoxy surrounding the coil. The open circuit was caused when the epoxy cracked at the defect and broke a wire running through the epoxy. This wire connected the two coils and this failure caused the open circuit.

"Spectrum Technologies has provided the above information, including all figures, to Cutler-Hammer for them to investigate/evaluate the situation. Spectrum Technologies has requested that they provide a formal report addressing what caused the condition and whether it is unique or a common problem, what other components may be affected, and what will be done to prevent recurrence."