Event Notification Report for November 07, 2004
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
11/06/2004 - 11/07/2004
Power Reactor
Event Number: 41177
Facility: FERMI
Region: 3 State: MI
Unit: [2] [] []
RX Type: [2] GE-4
NRC Notified By: KEVIN DAHM
HQ OPS Officer: STEVE SANDIN
Region: 3 State: MI
Unit: [2] [] []
RX Type: [2] GE-4
NRC Notified By: KEVIN DAHM
HQ OPS Officer: STEVE SANDIN
Notification Date: 11/07/2004
Notification Time: 06:20 [ET]
Event Date: 11/07/2004
Event Time: 06:20 [EST]
Last Update Date: 11/29/2004
Notification Time: 06:20 [ET]
Event Date: 11/07/2004
Event Time: 06:20 [EST]
Last Update Date: 11/29/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
PATRICK LOUDEN (R3)
PATRICK LOUDEN (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Cold Shutdown | 0 | Cold Shutdown |
LOSS OF SPDS AND ERDS DUE TO PLANNED MAINTENANCE
"The Safety Parameter Display System (SPDS) and Emergency Response Data System (ERDS) were removed from service while implementing a planned modification to replace the Visual Annunciator System, Iso-Mimic display system, and support planned maintenance on uninterruptible power supplies. SPDS and ERDS will be returned to service in approximately 14 days. During this period, any out of service indication on the SPDS can be obtained by control board indications. The Emergency Notification System will remain operable. These conditions are reportable in accordance with 10 CFR 50.72(b)(3)(xiii). The NRC Resident inspector has been notified. The plant is in Mode 4, Reactor Coolant Temperature is 115 deg and Div. 1 RHR is in shutdown cooling."
* * * UPDATE 1340 EST ON 11/29/04 FROM DAVID COSEO TO S.SANDIN * * *
"This is an update to Event No. 41177. ERDS and SPDS have been restored following design change implementation on the Annunciator System. The plant remains in Mode 4 completing outage activities to support startup."
The licensee will inform the NRC Resident Inspector. Notified R3DO (Ken O'Brien).
"The Safety Parameter Display System (SPDS) and Emergency Response Data System (ERDS) were removed from service while implementing a planned modification to replace the Visual Annunciator System, Iso-Mimic display system, and support planned maintenance on uninterruptible power supplies. SPDS and ERDS will be returned to service in approximately 14 days. During this period, any out of service indication on the SPDS can be obtained by control board indications. The Emergency Notification System will remain operable. These conditions are reportable in accordance with 10 CFR 50.72(b)(3)(xiii). The NRC Resident inspector has been notified. The plant is in Mode 4, Reactor Coolant Temperature is 115 deg and Div. 1 RHR is in shutdown cooling."
* * * UPDATE 1340 EST ON 11/29/04 FROM DAVID COSEO TO S.SANDIN * * *
"This is an update to Event No. 41177. ERDS and SPDS have been restored following design change implementation on the Annunciator System. The plant remains in Mode 4 completing outage activities to support startup."
The licensee will inform the NRC Resident Inspector. Notified R3DO (Ken O'Brien).
Power Reactor
Event Number: 41179
Facility: HARRIS
Region: 2 State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: JIM STANFORD
HQ OPS Officer: JOHN MacKINNON
Region: 2 State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: JIM STANFORD
HQ OPS Officer: JOHN MacKINNON
Notification Date: 11/07/2004
Notification Time: 21:04 [ET]
Event Date: 11/07/2004
Event Time: 16:35 [EST]
Last Update Date: 11/07/2004
Notification Time: 21:04 [ET]
Event Date: 11/07/2004
Event Time: 16:35 [EST]
Last Update Date: 11/07/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
STEPHEN CAHILL (R2)
STEPHEN CAHILL (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 7 | Power Operation | 2 | Startup |
"A" AUXILIARY FEEDWATER (AFW) PUMP MANUALLY STARTED DUE TO DECREASING STEAM GENERATOR WATER LEVEL.
"The 'A' motor driven AFW pump was manually started in response to lowering Steam Generator (SG) level. The plant was in Mode 1 with reactor power at approximately 7%, preparing for startup of the turbine generator. Steam Generator Feedwater flow to the Steam Generators was being supplied by the main feedwater system through the main feedwater regulating bypass valves operating in automatic control. The operating crew observed a lowering trend in 'C' Steam Generator level. Upon reaching the lower end of the procedurally established normal control band (time=1633), the operating crew took the following actions in accordance with plant procedures: (1) the associated feedwater regulating bypass valve was taken to manual control to attempt restoration of normal SG level, (2) the 'A' motor driven AFW pump was manually started (time= 1635) to supply AFW to the SG and (3) reactor power lowered to reduce steam demand. These actions resulted in the restoration of 'C' SG level to normal. Normal operating SG level is 57%. Lo Lo Steam Generator Level Trip occurs at 25%. The lowest SG level observed during the evolution was approximately 43%. The cause of the irregular Feedwater control is currently being investigated. The plant is currently at approximately 2.5% power with all Steam Generator levels at normal operating levels. No automatic ESF Actuations occurred. The NRC Senior Resident was informed."
"The 'A' motor driven AFW pump was manually started in response to lowering Steam Generator (SG) level. The plant was in Mode 1 with reactor power at approximately 7%, preparing for startup of the turbine generator. Steam Generator Feedwater flow to the Steam Generators was being supplied by the main feedwater system through the main feedwater regulating bypass valves operating in automatic control. The operating crew observed a lowering trend in 'C' Steam Generator level. Upon reaching the lower end of the procedurally established normal control band (time=1633), the operating crew took the following actions in accordance with plant procedures: (1) the associated feedwater regulating bypass valve was taken to manual control to attempt restoration of normal SG level, (2) the 'A' motor driven AFW pump was manually started (time= 1635) to supply AFW to the SG and (3) reactor power lowered to reduce steam demand. These actions resulted in the restoration of 'C' SG level to normal. Normal operating SG level is 57%. Lo Lo Steam Generator Level Trip occurs at 25%. The lowest SG level observed during the evolution was approximately 43%. The cause of the irregular Feedwater control is currently being investigated. The plant is currently at approximately 2.5% power with all Steam Generator levels at normal operating levels. No automatic ESF Actuations occurred. The NRC Senior Resident was informed."