Event Notification Report for November 02, 2004

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
11/01/2004 - 11/02/2004

EVENT NUMBERS
41171411724116741168

Fuel Cycle Facility
Event Number: 41171
Facility: PORTSMOUTH GASEOUS DIFFUSION PLANT
Region: 2     State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: JAMES McCLEERY
HQ OPS Officer: ARLON COSTA
Notification Date: 11/03/2004
Notification Time: 13:11 [ET]
Event Date: 11/02/2004
Event Time: 17:35 [EST]
Last Update Date: 11/03/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
STEPHEN CAHILL (R2)
JOHN HICKEY (NMSS)
Event Text
24 HOUR BULLETIN 91-01 REPORT INVOLVING TANKER TRUCK ASSAY RESULTS EXCEEDING VALUES

"DESCRIPTION:
11/2/04 at 1735 the Plant Shift Superintendent (PSS) office was notified of a tanker truck located outside the east corner of the X-700 has uranium results at 322.0 +/- 64.4 PPM and 4.87 +/- 0.49 U-235 assay. No NCSA applies to this operation. This is reportable per NRCB 91-01 as a 24 hour event.

"SAFETY SIGNIFICANCE:
Very Low Safety Significance. The amount and concentration of uranium involved cannot possibly achieve a critical configuration.

"POTENTIAL CRITICALITY:
There are no criticality pathways involved due to the limited mass and concentration of material.

"CONTROLLED PARAMETERS:
No NCSA was established for this operation, so there are no control parameters. However, the limited mass and concentration of the solution does not warrant double contingency control because a criticality is not credible.

"NUCLEAR CRITICALITY SAFETY CONTROLS:
No NCSA controls were established for this operation.

"CORRECTIVE ACTIONS:
Upon discovery the PSS office directed entering an anomalous condition. Additional samples are being taken to confirm results. Contents of tanker are to be removed.


General Information or Other
Event Number: 41172
Rep Org: FLORIDA BUREAU OF RADIATION CONTROL
Licensee: AEA TECHNOLOGY QSA, INC.
Region: 1
City: BURLINGTON   State: MA
County:
License #:
Agreement: Y
Docket:
NRC Notified By: JERRY EAKINS
HQ OPS Officer: STEVE SANDIN
Notification Date: 11/02/2004
Notification Time: 17:35 [ET]
Event Date: 11/02/2004
Event Time: 16:30 [EST]
Last Update Date: 11/04/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
DAVID SILK (R1)
TOM ESSIG (NMSS)
Event Text
AGREEMENT STATE REPORT INVOLVING IMPROPER RADIOACTIVE MATERIAL SHIPMENT

On 11/02/04 the Florida Bureau of Radiation Control was notified by U.S. Customs at the Fort Lauderdale Executive Airport of the arrival of an aircraft from the Bahamas " . . . Carrying [a] RAM holder 650L (depleted uranium) with a depleted Ir-192 source [approximately 10 curies]. [The] pilot initially said that he had nothing to declare. Customs investigator's dosimeters alarmed when they examined the plane and they subsequently found the holder. The pilot then claimed that Bahamas Oil Refining Co. paid him to fly the holder to Ft. Lauderdale and send it to owner via FedEx. He then made a false statement that the holder was empty. The pilot was not hazmat qualified, was not licensed to handle RAM, and did not have proper shipping papers. The holder was impounded. [The] owner [AEA Technology, Inc.] provided proper shipping papers and had the item shipped back to them. This office [Florida Bureau of Radiation Control] will take no further action on this incident."

Incident Number: FL04-150

A conference call was established between the NMSS EO (Tom Essig) and the FL BRC Representative (Jerry Eakins) to discuss the situation. During followup on 11/4/04, it was determined that the initial notification constituted an Agreement State Report.

Notified RDO (David Silk), NMSS EO (Sandra Wastler) and TAS Duty Officer (Aaron Danis).


Power Reactor
Event Number: 41167
Facility: SEABROOK
Region: 1     State: NH
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: PAT LEARY
HQ OPS Officer: BILL GOTT
Notification Date: 11/02/2004
Notification Time: 17:36 [ET]
Event Date: 11/02/2004
Event Time: 14:00 [EST]
Last Update Date: 11/02/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(B) - UNANALYZED CONDITION
Person (Organization):
DAVID SILK (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
UNANALYZED CONDITION - INADEQUATE CABLE SEPARATION

"On 11/2/04 at 1400, Seabrook Station determined that a potential scenario involving a fire could result in the loss of the Train A and Train B centrifugal charging pumps (CCP). During a fire, inadequate cable separation could result in the spurious closure of one of two series volume control tank (VCT) outlet valves. This would result in a loss of suction to the operating CCP and eventual loss of the pump. The second CCP is assumed to be lost as a result of the same fire. This condition was concluded to be reportable pursuant to 10CFR50.72(b)(3)(ii)(B) as a condition that resulted in the plant being in an unanalyzed condition that significantly degrades plant safety.

"Compensatory measures include establishing a roving fire watch in the affected fire zones, operator briefings, and limiting combustible material in the affected fire zones."

The licensee notified the NRC Resident Inspector.


Power Reactor
Event Number: 41168
Facility: DIABLO CANYON
Region: 4     State: CA
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: JEFF KINISLEY
HQ OPS Officer: BILL HUFFMAN
Notification Date: 11/02/2004
Notification Time: 20:22 [ET]
Event Date: 11/02/2004
Event Time: 11:05 [PST]
Last Update Date: 11/02/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
CHUCK CAIN (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Refueling 0 Refueling
Event Text
UNPLANNED DIESEL GENERATOR START ON A VALID BUS UNDERVOLTAGE SIGNAL

"On November 2, 2004, at 11:05 PST, with Diablo Canyon Unit 2 in Mode 6 (Refueling), Emergency Diesel Generator (EDG) 2-1 auto started on an unplanned actuation signal from a valid 4160 volt Bus G undervoltage signal. All equipment responded as designed. After the EDG started, the auxiliary feeder breaker opened, and loads were automatically sequenced onto the EDG. At the time of the event, test equipment was being connected in preparation for an instrumented manual test start of EDG 2-1 prior to maintenance.

"On November 2, 2004, at 1708 PST, operators transferred Bus G to auxiliary power and shutdown DG 2-1.

"Prior to the event, Bus G was being supplied by auxiliary power, with startup power cleared for planned maintenance. Bus G was being prepared to be cleared for maintenance, therefore, required equipment was in-service on the other buses. Buses F and H were unaffected by this event and remain operable on auxiliary power, with EDG 2-2 (Bus H) and 2-3 (Bus F) operable. The following decay heat removal trains are powered from Bus G: Residual Heat Removal Pump 2-1 remained in standby, Component Cooling Water Pump 2-2 started on the transfer to EDG, and Auxiliary Saltwater Pump 2-2 re-started.

"Unit 2 is in day 9 of a refueling outage, with the reactor head removed, the refueling cavity filled, and the upper internals installed with rods latched.


"Unit 1 was unaffected and continues to operate in Mode 1 (Power Operation) at 100 percent power.

"The cause of the Bus G undervoltage signal is being investigated."

The licensee stated that no undervoltage was seen on any other equipment but the undervoltage relays on Bus G did sense an undervoltage. Residual Heat Removal was unaffected by the event. Bus G has been returned to its pre-event configuration and is considered operable. The other EDGs were fully operable at the time of the event and there were no significant LCOs at the time. All systems functioned as required.

The licensee has notified the NRC Resident Inspector