Event Notification Report for October 23, 2004
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/22/2004 - 10/23/2004
EVENT NUMBERS
41144
Power Reactor
Event Number: 41144
Facility: CATAWBA
Region: 2 State: SC
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: GLENN HORNE
HQ OPS Officer: CHAUNCEY GOULD
Region: 2 State: SC
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: GLENN HORNE
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 10/23/2004
Notification Time: 21:43 [ET]
Event Date: 10/23/2004
Event Time: 20:23 [EDT]
Last Update Date: 10/23/2004
Notification Time: 21:43 [ET]
Event Date: 10/23/2004
Event Time: 20:23 [EDT]
Last Update Date: 10/23/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
ANNE BOLAND (R2)
ANNE BOLAND (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | N | 0 | Hot Standby | 0 | Hot Standby |
OFFSITE NOTIFICATION TO SOUTH CAROLINA OSHA
A Catawba employee suffered an apparent heart attack while at work and was transported offsite to a local hospital at 1745 EDT on 10/23/04. The employee subsequently passed away at the hospital. No contamination was involved; the employee was working in the Unit supervisor's office.
The licensee is required to make an offsite notification to South Carolina OSHA within 8 hours. The licensee also notified state and local authorities for the states of SC and NC as well as the NRC resident inspector.
A Catawba employee suffered an apparent heart attack while at work and was transported offsite to a local hospital at 1745 EDT on 10/23/04. The employee subsequently passed away at the hospital. No contamination was involved; the employee was working in the Unit supervisor's office.
The licensee is required to make an offsite notification to South Carolina OSHA within 8 hours. The licensee also notified state and local authorities for the states of SC and NC as well as the NRC resident inspector.