Event Notification Report for August 28, 2004

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/27/2004 - 08/28/2004

EVENT NUMBERS
40995

Power Reactor
Event Number: 40995
Facility: DUANE ARNOLD
Region: 3     State: IA
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: EDWARD HARRISON
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 08/28/2004
Notification Time: 07:38 [ET]
Event Date: 08/28/2004
Event Time: 01:46 [CDT]
Last Update Date: 08/28/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
ERIC DUNCAN (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 93 Power Operation 93 Power Operation
Event Text
FAILURE OF THE PLANT PROCESS COMPUTER DUE TO LOSS OF POWER SUPPLY

At approximately 01:46 (CDT) on August 28, 2004, the Duane Arnold Energy Center plant process computer (PPC) failed due to a lost power supply. This computer system provides the control room with its Safety Parameter Display System (SPDS), the Emergency Response Data System (ERDS) and MIDAS. With the loss of the PPC, and specifically the subsequent loss of SPDS, ERDS, and MIDAS representing a major loss of emergency assessment capability, the reportability criteria of 10CFR50.72(b)(3)(xiii) was met. No other control room indications, or communication systems were affected by this computer outage. They expect to have a new power supply at the site by noon today and installed within two hours after arrival.


The NRC Resident Inspector will be notified.

* * * UPDATE PROVIDED BY DICK FOWLER TO JEFF ROTTON AT 1302 ON 08/28/04 * * *

The Duane Arnold Energy Center plant process computer (PPC) power supply has been replaced and operation of the PPC has been restored.

The licensee has notified the NRC Resident Inspector.