Event Notification Report for August 03, 2004

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/02/2004 - 08/03/2004

EVENT NUMBERS
4092940916409184091940920

General Information or Other
Event Number: 40929
Rep Org: COLORADO DEPT OF HEALTH
Licensee: COLORADO SCHOOL OF MINES
Region: 4
City: GOLDEN   State: CO
County:
License #: 627-01
Agreement: Y
Docket:
NRC Notified By: STEVE TARITON
HQ OPS Officer: STEVE SANDIN
Notification Date: 08/06/2004
Notification Time: 11:35 [ET]
Event Date: 08/03/2004
Event Time: 00:00 [MDT]
Last Update Date: 08/06/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
MIKE RUNYAN (R4)
TOM ESSIG (NMSS)
Event Text
AGREEMENT STATE REPORT INVOLVING DETECTION OF A PLATED SOURCE LEAK

"This report is sent in compliance with RH 4.58. On August 3, 2004, we received notification from our monitoring service that a wipe of a licensed plated source tested positive for leakage. The wipe was taken on June 30, 2004. The source is a 3 milliCurie, Curium 244, plated source, manufactured by Isotope Products Lab, model number AFR244-3M. We inspected the source and confirmed that it was leaking. The plated surface appears to be slightly corroded. A leak test conducted on December 30, 2003, did not detect any leakage, so the leakage started sometime during the ensuing 6 months.

"The source was stored inside a plastic box. The box was in a plastic baggy. The baggy was in a storage cabinet in Meyer Hall Laboratory 147. We removed the plastic baggy and all its contents including the leaking source. This material was placed in a sealed plastic jar and is in storage in our Hazardous Material Management Facility.

"We surveyed the area around the storage location with a thin window pancake GM detector and found no obvious contamination. We have also taken numerous wipes in and around the storage location. These will be analyzed by Liquid Scintillation Counting to determine if further decontamination is necessary. The storage cabinet has been placed off-limits until analysis of wipes is completed.

"Interviews with faculty members and graduate students indicate that no one has touched the source during the last six months.

"We will report the leak to the manufacturer."


Power Reactor
Event Number: 40916
Facility: INDIAN POINT
Region: 1     State: NY
Unit: [2] [3] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: DENNIS CORNAX
HQ OPS Officer: ARLON COSTA
Notification Date: 08/03/2004
Notification Time: 12:28 [ET]
Event Date: 08/03/2004
Event Time: 11:30 [EDT]
Last Update Date: 08/03/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
MOHAMED SHANBAKY (R1)
TERRY REIS (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
NOTIFICATION MADE DUE TO PATH OF HURRICANE ALEX

Hurricane "Alex" is within 500 nautical miles from Indian Point Energy Center (IPEC) with wind speed in excess of 87 knots. The licensee is tracking the hurricane and entered procedure OAP-008. The one hour non-emergency notifications was made per Technical Results Manual (TRM).

The licensee notified the NRC Resident Inspector.


Other Nuclear Material
Event Number: 40918
Rep Org: HIGH MOUNTAIN INSPECTION SERVICES
Licensee: HIGH MOUNTAIN INSPECTION SERVICES
Region: 4
City: CASPER   State: WY
County: NATRONA
License #: 49-26808-2
Agreement: N
Docket:
NRC Notified By: DR. ROY PARKER
HQ OPS Officer: HOWIE CROUCH
Notification Date: 08/03/2004
Notification Time: 18:02 [ET]
Event Date: 08/03/2004
Event Time: 00:00 [MDT]
Last Update Date: 08/03/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2202(a)(1) - PERS OVEREXPOSURE/TEDE >= 25 REM
Person (Organization):
MIKE RUNYAN (R4)
JOSEPH HOLONICH (NMSS)
Event Text
POTENTIAL PERSONNEL OVEREXPOSURE

Dr. Roy Parker, a consultant for High Mountain Inspections (a radiographer) in Casper, WY reported that Landauer, their film badge processor, informed the licensee that an employee's June badge had a deep dose reading of 121,662 milliRem when read. Landauer also stated that the badge reading was repeated with the same results. The badge was imaged to determine whether the dose was static or dynamic but the results were inconclusive.

Dr. Parker also reported that 1) the employee does not exhibit any symptoms of overexposure, 2) the employee is a manager and was in the field for only 3 days in June and was not present during any abnormal occurrences, and 3) co-workers that were in the field with the employee did not have any abnormal results when their badges were processed.

As a precaution, the employee will undergo appropriate blood tests to confirm/deny the reading results.

Dr. Parker notified R4 Materials (Cain).


Power Reactor
Event Number: 40919
Facility: NINE MILE POINT
Region: 1     State: NY
Unit: [] [2] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: CHRIS SKINNER
HQ OPS Officer: ARLON COSTA
Notification Date: 08/03/2004
Notification Time: 22:19 [ET]
Event Date: 08/03/2004
Event Time: 19:30 [EDT]
Last Update Date: 08/03/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
Person (Organization):
MOHAMED SHANBAKY (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 50 Power Operation
Event Text
PLANT SHUTDOWN INITIATED DUE TO INOPERABLE EMERGENCY UPS INVERTER

"Division 2 Emergency Uninterruptible Power Supply [UPS] Inverter is inoperable. The 24-hour completion time, for Technical Specification 3.8.7.A, has expired and Technical Specification 3.8.7.B was entered. Technical Specification 3.8.7.B requires the plant to be in Hot Shutdown by 0503 on August 4, 2004 and Cold Shutdown by 0503 on August 5, 2004.

"A plant shutdown was initiated at 1930."

The licensee has notified the NRC Resident Inspector.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 40920
Facility: NINE MILE POINT
Region: 1     State: NY
Unit: [] [2] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: CHRIS SKINNER
HQ OPS Officer: STEVE SANDIN
Notification Date: 08/04/2004
Notification Time: 04:14 [ET]
Event Date: 08/03/2004
Event Time: 10:46 [EDT]
Last Update Date: 09/16/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
MOHAMED SHANBAKY (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
HIGH PRESSURE CORE SPRAY RENDERED INOPERABLE DUE TO FAULTY TEST EQUIPMENT

"Maintenance technicians were performing surveillance testing on the Division 3 Battery. The as-found bus voltage was approximately 139 VDC and the technicians adjusted the battery charger output voltage to 134 VDC.

"At 1046, the control room received an alarm with bus voltage at 125 VDC. The High Pressure Core Spray System was declared inoperable per Technical Specification 3.8.4 with Division 3 DC Bus voltage < 130 VDC.

"The maintenance technicians determined that the voltmeter used to measure the voltage was defective and actual bus voltage was adjusted to 125 VDC.

"At 1105, Division 3 bus voltage was restored above 130 VDC (136 VDC) and the High Pressure Core Spray System was declared operable. The High Pressure Core Spray System was inoperable for approximately 19 minutes from when the alarm was received until the maintenance technicians restored voltage to 136 VDC. The High Pressure Core Spray System is a single train system."

The licensee informed the NRC Resident Inspector.

* * * UPDATE 1050 EDT ON 9/16/04 FROM PATRICK WALSH TO S. SANDIN * * *

"This Notification is to retract EN# 40920, Unplanned High Pressure Core Spray (HPCS) inoperability.

"On 8/4/04 at 0414 Nine Mile Point Unit 2 notified the NRC under 10CFR50.72(b)(3)(v)(D) of the inoperability of a single train safety system (HPCS) due to low battery voltage caused by use of defective test equipment.

"Engineering performed an analysis of this event and concluded that the HPCS system was operable during the event and would have performed its required function.

"Since, the battery charger was connected to the panel and maintaining bus voltage at or above 125 VDC, it was capable of supplying the steady state dc loads connected to the panel. Also, the battery charger was capable of maintaining the battery in a fully charged condition for the duration of the degraded condition.

"Based on the above, it is concluded that the CSH system was operable during this event and the div. 3 battery was capable of performing its intended design functions if required."

The licensee informed the NRC Resident Inspector. Notified R1DO (Doerflein).