Event Notification Report for July 31, 2004

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
07/30/2004 - 07/31/2004

EVENT NUMBERS
41004

Power Reactor
Event Number: 41004
Facility: VERMONT YANKEE
Region: 1     State: VT
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: DAVID HALLOUQUIST
HQ OPS Officer: JEFF ROTTON
Notification Date: 09/01/2004
Notification Time: 14:14 [ET]
Event Date: 07/31/2004
Event Time: 13:56 [EDT]
Last Update Date: 09/01/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
PAMELA HENDERSON (R1)
TERRY REIS (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
INVALID PCIS ACTUATION

"This notification is being made in accordance with 10CFR50.73(a)(2)(iv)(A) to provide the NRC with information pertaining to the invalid Primary Containment Isolation System (PCIS) Group III actuation signal that affected containment isolation valves in more than one system.

"On July 31, 2004 at 1356 [EDT] with the reactor at full power, the power supply that provides power to the Reactor Protection System (RPS) Channel 'A' of the Reactor Building Ventilation Exhaust Rad Monitor and RPS Channel 'A' of the Refuel Floor Rad Monitor was momentarily lost causing an invalid PCIS Group III actuation. Operators immediately verified the plant response to the loss of RPS 'A', backed up the Group III actuation manually, walked down the control room panels, shifted RPS 'A' bus to the alternate power supply, secured 'A' RPS MG set and restored the affected plant equipment to a normal line-up. The following systems were observed to have performed as follows:

"The PCIS functioned successfully providing a complete Group III isolation. Both trains of the Standby Gas Treatment System started and operated as designed.

"The PCIS Group Ill isolation involved isolation of valves in the following systems:

Drywell Air Purge and Vent, Drywell and Suppression Chamber Main Exhaust, Suppression Chamber Purge
and Vent, Containment Air Compressor Suction Valve, Exhaust to Standby Gas Treatment, Containment Purge
Supply and Makeup, Containment Air Sampling, Air Dilution Subsystem Valves, Vent Subsystem Valves, and
Containment Air Dilution Vent System MOV VG-22 A/B.

"Repairs were subsequently made to the 'A' RPS power supply and the system was returned to normal status. This event has been entered into Entergy Nuclear Vermont Yankee's Corrective Action Program."

The licensee will notify the NRC Resident Inspector.