Event Notification Report for July 24, 2004

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
07/23/2004 - 07/24/2004

EVENT NUMBERS
40897

Power Reactor
Event Number: 40897
Facility: SAN ONOFRE
Region: 4     State: CA
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: CLAY WILLIAMS
HQ OPS Officer: ARLON COSTA
Notification Date: 07/24/2004
Notification Time: 18:20 [ET]
Event Date: 07/24/2004
Event Time: 10:00 [PDT]
Last Update Date: 07/24/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
72.75(c )(1) - SPENT FUEL, HLW, RX GTCC DEFECT
Person (Organization):
TOM FARNHOLTZ (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Decommissioned 0 Decommissioned
Event Text
ADVANCED HORIZONTAL STORAGE MODULE BOLT FAILURE

"On July 24, 2004, at about 1000 PDT, SCE [Southern California Edison] personnel were tightening two seismic restraint bolts on Advanced Horizontal Storage Module (AHSM) Number 10 at the Unit 1 ISFSI [Independent Fuel Storage Installation] when one of the bolts failed. SCE had placed the storage canister into AHSM No. 10 on July 18, 2004 and was tightening the restraint as specified in the final safety analysis report, after the module had reached thermal equilibrium.

"SCE plans to replace the failed bolt with another bolt manufactured under the same Certificate of Compliance and will tighten the seismic restraints within the period allowed by the FSAR (one week from initial placement of the storage canister). SCE's evaluation of the failed bolt is ongoing.

"SCE has notified the NRC resident inspectors about this occurrence and will provide them with a copy of this report."